Dworshak FPOM Tour March 8, 2017 File Name.

Slides:



Advertisements
Similar presentations
Survival Estimates for the Passage of Juvenile Salmonids Through Dams and Reservoirs of the Lower Snake and Columbia Rivers (Project ) CBFWA March.
Advertisements

Investigate Re-establishing Anadromous Fish Populations Above Man-made Barriers Oregon Department of Fish and Wildlife Willamette Basin.
Case of HPP Blanca, Slovenia Jernej Mazij, Litostroj Power d. o. o
Overview of Current Production Programs Across the Columbia River Basin.
NWHA- Panel Discussion “Spawning Better Ideas for Fish Passage”
-It was developed in 1913 by the Austrian professor Viktor Kaplan -Kaplan turbine is a propeller- type water turbine which has adjustable blades.
PELTON TURBINE Pelton Turbine is a Tangential Flow Impulse Turbine.
Seneca Overview & Generator Rewind
Conowingo Hydroelectric Power Station and Muddy Run Pump Storage Facility Welcomes the Citizens Advisory Committee.
Hydroelectric Power Ariadna Perlog Class-607.
Hydro Power Plant Prepared by: Nimesh Gajjar
Water Energy. Hydro Energy - the energy generated by water.
Hydro electric (Hydel) Power Plant
HYDRO POWER PLANT
Hydropower. Hydropower is the energy we make with moving water. Hydro means water.
Head works.
Section 4 Ancillary Equipment Section 4 Ancillary Equipment Definition Dispensers & Under Dispenser Containment Vapor Recovery Drop Tube & Fill Port.
NORTH FORK SKOKOMISH POWERHOUSE & FISH FACILITIES 2013 NORTHWEST HYDRO OPERATORS FORUM STEVEN FISCHER, P.E.
Where I worked for the day Dad’s team manages all of Contact Energy’s generation offers to New Zealand Electricity Market. There is over 20 computer screens.
1 July 13, 2011 Some morning photos Tank Valve Box.
11/31/08 South Feather Power Project (FERC Project No. 2088) PM&E Proposal January 31, 2008 Plumas National Forest, Oroville, CA.
US Army Corps of Engineers BUILDING STRONG ® Mid-Columbia River Projects and Large Spill Events Ken Duncan Portland District PM Environmental Compliance.
ISRP Categorical Review January 17-19, 2012 Portland, OR Nez Perce Tribe Resident Fish Substitution Program “Trout Ponds Project” BPA No
Types of fluid flow Steady or unsteady Uniform or non-uniform Laminar and turbulent Compressible or incompressible Viscous or non-viscous Rotational or.
Piezometers.
2012 Triennial Regulation Proposals. Department Proposals District and Special Regulation Changes  Allow harvest of hatchery trout and steelhead in catch.
ROLL NO.ENROLLMENT NO.NAME MAKVANA DISHA R. GUIDED BY : PROF. R. JADAV.
2012 Central Valley Salmon Sport Fishing Regulations California Department of Fish and Game California Fish and Game Commission March 7, 2012.
HYDRO POWER PLANT PRESENTED PRESENTED BY B.yedukondalu v.manikanta.
Electric Generators: supply electrical energy!
(v) - to lose water or moisture; to become dry Running a marathon without drinking water will likely dehydrate a runner.
Fish Loss at Unit 1 McNary July 2016 July On July 25, the tailwater logs were installed at unit 1 for unit dewatering and 9 year overhaul. No salmon.
Hydraulic axial forces acting on a Francis runner.
Chapter 37: Fluid Containment
Unit 37: Fluid containment Dr
Front End Test Stand (F.E.T.S.)
HASMUKH GOSWAMI COLLEGE OF ENGINEERING
JOHN DAY Oil Spill Plan MIRO ZYNDOL Fish Biologist
Evaluation of Adult Salmonid Downstream Passage Through the Sluiceway and Turbines at The Dalles Dam During Late Fall, Winter, and Early Spring STUDY.
Date of download: 11/1/2017 Copyright © ASME. All rights reserved.
HYDRO ELECTRIC POWER PLANTS BY Prabhakaran.T AP/MECH
Management Regulations
HYDRO-ELECTRIC POWER PLANT
Unit 37: Fluid containment Dr
Steelhead status in Idaho – 2012 Update
Siskiyou Power Authority
Impacts from elevated TDG Spring 2017
Reaction Turbines.
AVIAN ABUNDANCE AND DETERRENT MEASURES AT NWD DAMS
Roza Dam Evaluation Post Modifications
2017 Dworshak Dam Effects on Clearwater In-river Fish
كيــف تكتـب خطـة بحـث سيئـة ؟؟
الدكتـور/ عبدالناصـر محمـد عبدالحميـد
Status of Steelhead in Oregon
Steelhead stock status in Idaho 2008 update
Hydraulic axial forces acting on a Francis runner
Steelhead status in Idaho 2010 update
ALL THE BEST !! APPLICATIONS OF PRINCIPLES OF PROJECTIONS OF LINES
Hydro electric (Hydel) Power Plant
Existing WQ TDG Probe Downriver on North Shore
Status of Steelhead in Oregon
Portland District, USACE
Avian Task Group Bob Cordie Biologist The Dalles Lock and Dam
Hydro electric (Hydel) Power Plant
Great! on in in front of under above next to behind between next.
Steelhead status in Idaho 2010 update
Fig Inward flow reaction turbines
whose P & Q are walls meeting at 900. Flower A is 1
ALL THE BEST !! APPLICATIONS OF PRINCIPLES OF PROJECTIONS OF LINES
Project focus areas FY20+ Potential contract opportunities
Presentation transcript:

Dworshak FPOM Tour March 8, 2017 File Name

Runner and cone

Turbine runner

Turbine runner above, standing in start of draft tube

Wicket gate

Looking through wicket gate to runner

Wicket gate seal

Intake conduit for unit

Oxygen depress system

The big wrench

Manual operations control area

Crane rail limits access to slot area behind tail logs

Tailrace with unit 1, 2 operating

Tanks used for moving fish during unit salvage operations

Fish release pipe hooks to tank and delivers fish to tailrace

Spill through regulating outlets and pipeline for hatchery

Angler hooks a steelhead along fishing wall below the dam

Tailrace area showing tail logs, crane

Forebay

North Fork Clearwater from top of dam

Spillgate