Brief summary of discussion at LCWS2010 and draft short term plan

Slides:



Advertisements
Similar presentations
Background studies Takashi Maruyama SLAC GDE Baseline Assessment Workshop SLAC, January 18-21, 2011.
Advertisements

Selected topics from the recent GLD studies Akiya Miyamoto KEK 19 July, 2006 GLD lunch time meeting At VCLW06.
Keynote Workshop Charge Akiya Miyamoto, KEK 16-April-2009 ILD Software Workshop.
Higgs branching ratios study Oct Hiroaki Ono (NDU) Oct ILC Physics WG general meeting.
LCFI physics studies meeting, 28 th June 05 Sonja Hillertp. 1 Report from ILC simulation workshop, DESY June Aim of workshop: preparation for Snowmass;
RD’s Report (update since LCWS08 in Chicago) 2009/4/171TILC09 S.Yamada Sakue Yamada April Tsukuba.
Computing plans for the post DBD phase Akiya Miyamoto KEK ILD Session ECFA May 2013.
ILD Detector Optimization and Benchmarking Akiya Miyamoto, KEK at Tsinghua University 12-January-2009.
ILD meeting Welcome/Introduction 2015/4/23 Y. 1.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
ILD ILD Simulation Status and Plan Akiya Miyamoto for ILD Software group 27-March-2010, Beijing LCWS2010.
Report from Physics and Detectors Sakue Yamada Beijing March 26, 2010 The activity of the two detector groups IDAG monitoring Common Task groups.
RD’s Report Sakue Yamada Aug. 24, 2011 Institute Mumbai 2011/8/241Sakue ILCSC, Mumbai.
Taikan Suehara et al., Beijing, 2010/3/29 page 1 Simulation study of W + DM signature for identification of new physics Taikan Suehara (ICEPP,
Computing for ILC experiments Akiya Miyamoto KEK 14 May 2014 AWLC14 Any comments are welcomed.
ACFA Summary Akiya Miyamoto, KEK KILC12 26 April, 2012.
Plan of Jupiter data production Akiya Miyamoto 19 March 2008 ILD Optimization WG Updates of the presentation at ILD meeting, 7 March, at Sendai.
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
A brief report of tth A.Miyamoto, 16-June-2011 Physsim update Tauola : modified to use DESY_TAUOLA ISR function: Modified to use same ISR function as Whizard.
Computing Resources for ILD Akiya Miyamoto, KEK with a help by Vincent, Mark, Junping, Frank 9 September 2014 ILD Oshu City a report on work.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
Norman Graf (SLAC) Software Software KILC12, Daegu, Korea.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
ILC DBD Common simulation and software tools Akiya Miyamoto KEK ILC PAC 14 December 2012 at KEK.
Software Common Task Group Meeting Akiya Miyamoto 6-June-2011.
Status of tth analysis 1. √s=500 GeV 2. √s=1 TeV 3. MC requests R. Yonamine, T. Tanabe, K. Fujii T. Price, H. Tabassam, N. Watson, V. Martin ILD Workshop,
Taikan Suehara, 16 th general meeting of ILC physics (Asia) wg., 2010/07/17 page 1 Model 500 GeV Taikan Suehara ICEPP, The Univ. of Tokyo.
Software Overview Akiya Miyamoto KEK JSPS Tokusui Workshop December-2012 Topics MC production Computing reousces GRID Future events Topics MC production.
Summary of Software Pre-Meeting Akiya Miyamoto 25-May-2011 KEK ILD Workshop LAL.
Taikan Suehara et al., Albuquerque, 1 Oct page 1 Tau-pair analysis in the ILD detector Taikan Suehara (ICEPP, The Univ. of Tokyo) T. Tanabe.
Report from Software Workshop before TILC09 (16-April) Akiya Miyamoto, KEK 21-April-2009 ILD Meeting.
Software Common Task Group Report Norman Graf (SLAC) PAC, Vancouver May 10, 2009.
Summary of Software and tracking activities Tokusui Workshop December 2015 Akiya Miyamoto KEK.
Software Common Task Group Report Akiya Miyamoto ILC PAC POSTECH 3 November 2009.
Next Step Akiya Miyamoto, KEK 17-Sep-2008 ILD Asia Meeting.
1 ILD Workshop purpose and scope Yasuhiro Sugimoto May 23,
1TeV study for DBD ILD analysis meeting Sep H. Ono (NDU) Sep ILD analysis meeting TeV study 1.
Computing Resources for ILD Akiya Miyamoto, KEK with a help by Vincent, Mark, Junping, Frank 9 September 2014 ILD Oshu City a report on work.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
SiD LOI Benchmark Simulation and Reconstruction Norman Graf (SLAC) LCWA09, Albuquerque September 30, 2009.
RD’s Report Sakue Yamada May 23, /05/231 Sakue
3 October, 2006GLD Meeting1 The Detector Chapter of The Detector Concept Report GLD Meeting 3 October, 2006 Akiya Miyamoto.
Summary of MC requests for DBD benchmarks ILD Workshop, Kyushu University May 23,
Report from SB2009 Working Group Akiya Miyamoto 8-July-2010 DESY ILD Software and Integration Workshop.
LumiCal background and systematics at CLIC energy I. Smiljanić, Vinča Institute of Nuclear Sciences.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
Taikan Suehara, 15 th general meeting of ILC physics (Asia) wg., 2010/05/15 page 1 Model 500 GeV Taikan Suehara ICEPP, The Univ. of Tokyo.
Whizard2 test at KEK report of work in progress Akiya Miyamoto 27 October 2015 Contents: Comparison with DBD sample Recoil mass distribution of e + e -
Physics performance with SB2009 Progress report of a study by QuickSimulator Akiya Miyamoto 15-Jan-2010 KEK SB2009 WG Meeting.
Generator status Akiya Miyamoto KEK 23 February 2016.
Asian Physics and Software meeting Akiya Miyamoto KEK 3-September-2010.
ILD MCProduction with ILCDirac
ILD Soft & Analysis meeting
Model-independent WIMP searches at ILC with single photon
Electroweak Physics Towards the CDR
ILD Soft & Analysis meeting
Akiya Miyamoto KEK 1 June 2016
Monte-Carlo event generation for CEPC
ILD Background WG Mark Thomson
Computing in ILC Contents: ILC Project Software for ILC
Sakue Yamada March 19, 2011 RD’s Report Sakue Yamada March 19, /03/19 Sakue
ILD Ichinoseki Meeting
ILD Optimisation: towards 2012 University of Cambridge
Sim/Rec/Opt Session Summary
Yasuhiro Okada, Executive Director, KEK
Simulation plan -- GLDPrime --
Using Single Photons for WIMP Searches at the ILC
Study of e+ e- background due to beamstrahlung for different ILC parameter sets Stephan Gronenborn.
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

Brief summary of discussion at LCWS2010 and draft short term plan Akiya Miyamoto 14-April-2010 ILD Software WG meeting Topics Improving the ILD simulation Study toward new ILC baseline apologizes for not including core tools and reconstructions Detail will be found at http://ilcagenda.linearcollider.org/conferenceTimeTable.py?confId=4175

Improving the ILD simulation Near term high priority task Increase realism of sub-detector drivers and add alternatives/options.  according to reports from sub-group contacts in mid. March, most of them are aiming to deliver improvements by this summer, except further improvements of ECAL and mask/beampipe. New ILD integration WG has been formed to address issues related to services/cables. Next mile stone: ILD Software and Integration Meeting in June or July: - to have improved drivers and options Agreement in Paris: “Revisit plans for next large MC in Summer”  Topics of the next ILD WS ( during ECFA ? )  A preference to have the MC production rather late (2010) were expressed at Beijing Missing Improve B-field map ( especially for background/performance study ) Need a help by MDI group PhysicsList: SiD is using QGSP_BERT. Need our own study. 2011 2010/4/14 Akiya Miyamoto, ILD software WG meeting

Study toward new ILC baseline At LCWS2010/ILC10(Beijing), Decision of ILC parameter is postponed, by ~middle 2011 New proposal: double pulse operation to recover luminosity at low energy.  GDE is studying new parameter. Hope to be informed soon. ~ June(?) GDE will prepare 1 TeV parameter. BAW(Baseline Assessment Workshop)s will be organized: Sep. 8-10 in KEK and Dec./Jan. in ???, aiming to improve communication between Acc. and Det. reach common agreement on new ILC parameter.  it will take some more time to have a concrete beam parameter At ILD meeting Proposal: “dedicated 350 GeV studies for Higgs branching ratio measurement and compare with 250 GeV performance.” 2010/4/14 Akiya Miyamoto, ILD software WG meeting

Plan of 350 GeV MC production Dedicated for Higgs Br study at 350 GeV vs. 250GeV Generator samples Could use existing e+e-  llH, llqq stdhep samples Beam parameters: We have RDR and SB2009 no TF. RDR350 is OK as a tentative selection. For other final states ( nnH & qqH ), samples has to be prepared. 4f samples would be sufficient. Mokka & Marlin Use ILD_00 and ilcsoft_v01-06 with minimum fixes. Fixes to be considered include beam crossing angle fix VTX geometry problem and understand LCFIVertex performance with DetailedTRKHitMode for all trackers any others ? ( I suppose tuned PFOID, Beamcal Pandora with bkg., DST info., etc. are not ready to be included.) Hopefully, 350 GeV production will serve as a test of new GRID tool 2010/4/14 Akiya Miyamoto, ILD software WG meeting

Common Generator Samples Generator samples for next MC production should have a quality sufficient for making ILC physics case. Fix known errors (CKM-matrix, tau-pol., pythia fragmentation.) Whizard: update 1.40  1.95 ( work started. ) Whizard for the most of ee2f, 4f, 6f samples and ge  X Note: Pythia is easy to use, but beam pol. is missing in many cases and need special work to include lum. spectrum for ge, etc. Use special generator for special process. For example, e+e-  ttH, ttbb, ttZ, .. : physsim bhabha : SUSY Update of data format has been requested. Info. of color singlet system;incl. all Pythia’s hepevt info.; incl. particle spin in MCParticle; Generator samples should be validated before fed to MCProduction At LCWS2010, Software Common Task Group agrees to organize a sub-working group by members from SLAC/KEK/DESY to coordinate work on common data sample production. Preparation of new 350 GeV will be served as a test 2010/4/14 Akiya Miyamoto, ILD software WG meeting