Misalignment Study David Forrest University of Glasgow

Slides:



Advertisements
Similar presentations
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

Emittance definition and MICE staging U. Bravar Univ. of Oxford 1 Apr Topics: a) Figure of merit for MICE b) Performance of MICE stages.
1 Angular Momentum from diffuser Beam picks up kinetic angular momentum (L kin ) when it sits in a field –Canonical angular momentum (L can ) is conserved.
Cooling channel issues U. Bravar Univ. of Oxford 31-Mar-2004.
1 Approaching the Problem of Statistics David Forrest University of Glasgow CM23 HIT, Harbin January 14th.
1 Emittance Calculation Progress and Plans Chris Rogers MICE CM 24 September 2005.
1 PID, emittance and cooling measurement Rikard Sandström University of Geneva MICE Analysis phone conference.
1 September 09Mark Rayner – Emittance measurement by The TOFs1 Emittance measurement by the TOFs Via trace space reconstruction of individual muons. Complementary.
1Malcolm Ellis - Video Conference - 7th December 2006 Data Challenge Report  Disclaimer  Data Challenge definition(s)  Software status u G4MICE u GRID.
Updates: Misalignment, Statistics David Forrest (Happy new year)
March 6th, 2006CALICE meeting, UCL1 Position and angular resolution studies with ECAL TB prototype Introduction Linear fit method Results with 1, 2, 3,
1 PID Detectors & Emittance Resolution Chris Rogers Rutherford Appleton Laboratory MICE CM17.
1 Configuration Database David Forrest University of Glasgow MICO Meeting 13/10/2008
M.apollonioCM17 -CERN- (22/2 - 25/2 2007)1 Single Particle Amplitude M. Apollonio – University of Oxford.
A Few Words on Emittance Chris Rogers MICE vc 27/05/05.
1 Statistics Toy Monte Carlo David Forrest University of Glasgow.
Tracker Misalignment Study David Forrest CM23 HIT, Harbin January 14 th.
Diffuser in G4MICE Victoria Blackmore 09/03/10 Analysis Meeting 1/8.
1 Losses in the Cooling Channel Malcolm Ellis PID Meeting 1 st March 2005.
1 st Study of Tracker Misalignments with G4MICE David Forrest University of Glasgow.
MICE analysis meeting Alain Blondel 5 August MICE -- what running strategy? disclaimer: of course we will evolve the running strategy as problems.
1Malcolm Ellis - Software Meeting - 31st May 2006 Data Challenge Requirements  First list of requirements, based on Yagmur’s document: u
Progress on PID studies Rikard Sandström University of Geneva MICE Analysis meeting.
1 Statistics David Forrest University of Glasgow.
M.apollonio/j.cobbMICE UK meeting- RAL - (9/1/2007) 1 Single Particle Amplitude M. Apollonio – University of Oxford.
Stats update Was asked to provide comparison between toy mc and g4mice at two points along z (middle of first and third absorbers) 10,000 events, step.
Diffuser Studies Chris Rogers, IC/RAL MICE VC 09 March 2005.
Analysis of MICE Chris Rogers 1 Imperial College/RAL Thursday 28 October, With thanks to John Cobb.
Timothy Carlisle, Oxford CM 28. Step 3 Matching Step 3  Step 3 rematched for 830 mm spool piece  Calc. B(z) & BetaFn with the following:  Minimize.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
MICE pencil beam raster scan simulation study Andreas Jansson.
Introduction Miha Zgubič, summer student Scintillating fibre tracker software Analysis of performance of momentum reconstruction 1.
Tracker Misalignment Study David Forrest University of Glasgow.
MICE Step 1: First Emittance Results with Particle Physics Detectors Linda R. Coney EuCARD Meeting – 10 May 2011.
MICE input beam weighting Dr Chris Rogers Analysis PC 05/09/2007.
21 Jun 2010Paul Dauncey1 First look at FNAL tracking chamber alignment Paul Dauncey, with lots of help from Daniel and Angela.
2 Oct 2008PC We have only 1 hour today May need to be brief.
Mark Rayner 14/8/08Analysis Meeting: Emittance measurement using the TOFs 1 Emittance measurement using the TOFs The question: can we use position measurements.
11 Nov 2008PC Analysis PC Schedule 2008 Tuesdays fortnightly 9 September  23 September  2 October  CM22  11 November  25 November 9 December.
1 Statistics David Forrest University of Glasgow May 5 th 2009.
1M. Ellis - NFMCC - 31st January 2007 MICE Analysis.
PID simulations Rikard Sandström University of Geneva MICE collaboration meeting RAL.
ILC Main Linac Alignment Simulations John Dale 2009 Linear Collider Workshop of the Americas.
PID Detector Requirements for Emittance Measurement Chris Rogers, MICE PID Review, Thursday Oct 12.
1 Constraining ME Flux Using ν + e Elastic Scattering Wenting Tan Hampton University Jaewon Park University of Rochester.
04/06/07I.Larin pi0 systematic error 1  0 error budget Completed items (review) Updated and new items (not reported yet) Items to be completed.
Status of MICE on the GRID  MICE VO u CEs  G4MICE Installation  Example test job  Station QA Analysis  Analysis jobs  File Storage  Documentation.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
1 Statistics Update David Forrest University of Glasgow.
17 Sept 2007 Analysis PC 18 Sept Analysis PC Schedule 2007 Tuesdays alternate weeks, 15:30 – 17:00 GMT, with ad hoc exceptions Tue 3 April Tue 17.
Preliminery results from a 1 st study of misalignment and a fresh look at statistics David Forrest, University of Glasgow.
M. Brooks, 28-Mar-02 Heavy/Light meeting 1 Muon Analysis Work Getting Code ready for first data pass - DONE Get ready for second pass on DSTs - muon identification.
Mark Rayner 26/8/08Analysis Meeting: Emittance measurement using the TOFs 1 Measuring emittance with the TOFs Data: –G4MICE has been used to obtain transfer.
MICE Tracker Software A. Dobbs CM32 9 th Feb 2012.
M. Ellis - MICE Collaboration Meeting - Wednesday 27th October Sci-Fi Tracker Performance Software Status –RF background simulation –Beam simulation.
1 Error study of non-scaling FFAG 10 to 20 GeV muon ring Shinji Machida CCLRC/RAL/ASTeC 26 July, ffag/machida_ ppt.
S TATUS OF THE P HYSICS A NALYSIS V. Blackmore MICE Project Board 29 th April, /30.
Iterative local  2 alignment algorithm for the ATLAS Pixel detector Tobias Göttfert IMPRS young scientists workshop 17 th July 2006.
Step IV Physics Paper Readiness
Beam Energy-Loss measurement
MICE Analysis Status and Plans
Field-on measurement of multiple scattering
Why do we need to know the fields / map the magnets?
M. Migliorati, C. Vaccarezza INFN - LNF
Using MICE to verify simulation codes?
Validating Magnets Using Beam
Inverse Transformation Scale Experimental Power Graphing
The Scientific Method.
ILC Main Linac Alignment Simulations
The Detector System of the MICE Experiment
Presentation transcript:

d.forrest@physics.gla.ac.uk 21 October 2008 (CM22) Misalignment Study David Forrest University of Glasgow d.forrest@physics.gla.ac.uk 21 October 2008 (CM22) If you would like to use the grid tell me I would be happy to give you copious help in getting sorted out on it

Introduction to the study - Misalignment of the downstream spectrometer only (Step VI of MICE) - Translational and rotational misalignments studied - 10 mm, 3mrad and both combined. For x and y. - Independent MC simulations (G4MICE, Grid, Ganga) - 10,000 events

Cuts Cutting on single particle emittance Emittance 4D=mean(amplitude4D)/4 Cutting out muons that don’t make it to the second tracker – ~85% transmission (this is very very fresh, transmission graphs to follow at analysis meeting, mice note)

Baseline - bump. Explanations? Spline, cuts applied 4 up. No longer seeing muon collider type cooling now is of order 10 percent for a ten pi beam

3 mrad X 3mrad Rotational Misalignment (X)

3mrad rotation (Y) 3 mrad Rotation (Y)

Both in X Translational and Rotational (X)

Both in Y Translational and Rotational (Y)

What about statistics? - We calculate 4D emittance by taking the fourth root of a determinant of a matrix of covariances - What's the error on that? - Assume proportional to sqrt(1/N)... - What is the factor of proportionality?

Means 500 1k event runs 50 10k event runs

99% of statistics are made up

Stats conclusions - This is just a short attempt at probing the constant of proportionality, using the grid. - that constant is thankfully not 1, but it is not 0.1 either (proving jhc right when he said he was wrong), both of which are good to know. - I want to try and develop this - It's difficult to make statements about the effect of misalignment without an understanding of the affect of statistics

Misalignment conclusions Assume that effect scales linearly effect between 1-5% Higher than before. Previously predicted 3 mm, 1mrad alignment constraints. New ones will be stricter, perhaps 1mm, 0.3 mrad. Next analysis phone meeting and mice note will be more precise Misalignment conclusions

Future work - I should probably simulate that precise misalignment to confirm linear assumption - But I really want to try and separate the influence of statistics before doing much else - Finalise table and thump out a MICE note (+ one on GRID. Already written but volatile to change) - Digitisation, Reconstruction etc remains to be done