ISUAL Product Assurance

Slides:



Advertisements
Similar presentations
AS9102 First Article Inspection Report
Advertisements

1 HYDROSTATIC TESTING Approved for Public Release.
First Article Inspection Report
Crane Operations Objective
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
First Article Inspection 9102 Carl ZimmermanSept,2013.
First Article Inspection
1 Inspection and Testing Approved for Public Release.
Construction Safety Council. by David G. Allie Subpart R - Steel Erection ( ) Tiered buildings not adaptable to temporary floors - Safety.
1 RPS Critical Planning Preparation & Delivery of Critical Parts Goodrich Aerostructures Group.
Regulatory Overview.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
1 29 CFR THE CONTROL OF HAZARDOUS ENERGY.
Autodesk Inventor ® Professional Design, Validate and Document the Complete Machine Autodesk Inventor ® Professional Introduction.
Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety Believe it or.
25-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : SMA Jorg Fischer, MAM Mars Atmosphere and Volatile.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Safety and Mission Assurance Jorg Fischer, PFP SMA Manager.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
Application – Identifying, Listing Equipment, and Documentation
AEP Mechanical and Power System H. Heetderks. CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept EFW INST+SOC PDR97 RBSP Electric Field and Waves Instrument (EFW) Product.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
How the NCSX Project Does Business
Thanks for giving me an opportunity to share with you our process for controlling media and other supplies. Disclaimer: We are not yet accredited to ISO.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
Laboratory equipment Dr. W. Huisman Cairo, November 21th 2012.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
01.Oct.01 SPIRE BSM Product Assurance Team Briefing 1 BSM Product Assurance Plan Team Briefing & PA plan roll-out Ian Pain.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January Instrument Pre-Environmental Review Safety and Mission.
Accelerator Readiness Review October 31, 2006
Lock Out Tag Out (LOTO).
Start the program by pressing “enter”.
EFW DFB Systems Assurance
EFW DFB Systems Assurance
Instrument Maintenance
THEMIS Mission Assurance
Solar Probe Plus FIELDS V5 Mechanical Pre-Ship Review April 10, 2017
First Article Inspection
GlueX Electronics Review Jefferson Lab July 23-24, 2003
ISO 9001 Awareness Training.
Inspection and Testing
East Carolina University Compressed Gas Safety Training Program
Management of Change Report Errors to Management.
GLAST Large Area Telescope:
HMI Reliability Dale Wolfe Reliability Engineer LMSSC*ATC*LMSAL
Customers Customers Input Output Product
Changes in NRPP Device and Proficiency Elements
First Article Inspection
AS 9100 Awareness Training.
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
Supplier Briefing Pack
DOE Review of the LCLS Project October 2006
Presentation transcript:

ISUAL Product Assurance H. Heetderks

ISUAL Configuration Control ISUAL will use the Atmospheric Emissions Group On-Line Drawing System Developed for the IMAGE FUV Project Open Drawing Directory -- Anyone Working on the Project can Issue Themselves the next Drawing Number System used for all ISUAL Drawings and Documents Drawings may be in any of a prescribed list of formats (e.g. AutoCad R14) with the particular format identified in the Drawing Number Engineers Work in an On-Line Directory which is Read Only to the Group When an Engineer has a Drawing ready for Release he places it in a designated directory prior to CCB review Following CCB Review, Drawings are moved to a Read-Only Controlled Drawings Directory. Previous Revs are Preserved but the last Rev is Always Definitive Parts are Never made to Red-Lined Drawings or from an ECO Shop, Fabrication, and Purchasing Personnel Instructed to use only Drawings taken from the Controlled Drawing File An Image of the full Drawing Control System is maintained on our ftp Server at ftp://sprite.ssl.berkeley.edu/pub/img_dwgs Additionally, a pdf version of the latest rev of all controlled drawings is available at http://ssl.berkeley.edu/ (go to research, isual) NCKU UCB Tohoku Product Assurance H. Heetderks SDR 7 Jun 2000

ISUAL EEE Parts Program EEE Parts De-rated per NASA PPL Guidelines Including High Voltage Components and Connectors Parts will be chosen from the following sources: Previous Flight use at SSL NASA PPL-22 US Mil-38510 or equivalent US Mil-883/B Extended Temp Range Commercial parts with SSL Lot Testing Radiation Tolerance of 20K rads will be Verified SSL Testing Manufacture Data NCKU UCB Tohoku Product Assurance H. Heetderks SDR 7 Jun 2000

Materials and Process Control Material Certs obtained with Virtually all Materials Virtually all Materials and Fabrication Processes to be used have heritage on Previous NASA Programs at SSL All work is done from drawings and/or written procedures All Techs are NASA Trained in the appropriate specialty Soldering Harnessing Polymerics Parts made by outside vendors will be verified to meet print by extensive testing of fit and function NCKU UCB Tohoku Product Assurance H. Heetderks SDR 7 Jun 2000

ISUAL Quality Assurance Document Control Identification and Traceability Parts with same P/N are identical Identical (and sometimes similar) parts will be serialized Procurement Controls Control of Limited Life Items Engineering Review of Purchase Orders Receiving Inspection Done by Cognizant Engineer Fabrication Control Documented in Fabrication Control Plan Fabricated Components controlled by Manufacturing Certification Log (Traveler) ESD Control per Space Physics Group ESD Plan ESD Certified Work Stations Grounded Operators and Tools Special Procedures for CCD’s NCKU UCB Tohoku Product Assurance H. Heetderks SDR 7 Jun 2000

ISUAL Quality Assurance (continued) Non-Conformance Control Single Form for Failures and Discrepancies Discrepancy Reporting will begin with Procurement of Material for Flight Assemblies Failure Reporting will begin with Testing for Flight Components MRB Action required for all Non-Conformance resolution Inspections and Tests Inspection and Test Records will be included in Manufacturing Cert Logs Printed Wiring Boards will be Fabricated with Test Coupons Metrology Absolute Optical measurements will be made with NBS traceable Standards Electrical measurements will be made with instruments cross-checked against calibrated standards NCKU UCB Tohoku Product Assurance H. Heetderks SDR 7 Jun 2000

ISUAL Reliability Assurance The Largest Contribution to Design Reliability is made by making maximum use of designs which have been proven on past programs Other Contributions to System Reliability Use of mechanical as well as electrical de-rating and design margin (e.g. leostar 4.2.3) Use of modular mechanical designs (I.e. components can be separated into easily repairable sub-assemblies) Greatly simplifies testing by allowing use of the ETU system as a test bed Greatly improves repairability Careful thermal control Reliability Analysis Parts stress analysis will be done by each Cog-E in lab notebook format as part of the design process Lab notebook level FEMCA’s may be done on selected sub-assemblies NCKU UCB Tohoku Product Assurance H. Heetderks SDR 7 Jun 2000

ISUAL Safety ISUAL Instrument Personnel Hazards High Voltages are totally enclosed No pressure vessels, toxins, radioactive sources, high force mechanisms, high temperatures, stored energy devices, or heavy components SSL Test System Personnel Hazards Existing test equipment has hazard controls in place New optics test lab may have sources which require controls Protection of ISUAL Hardware Incorporation of safety protections into instrument design E.g. HV command enable, day light sensor, current limited power distribution Certification of test beds and equipment Careful review of test procedures (e.g. for buried removal of command interlocks) Test procedures verified on ETU system Use of proper transport procedures NCKU UCB Tohoku Product Assurance H. Heetderks SDR 7 Jun 2000