INSTRUCTIONS FOR PROJECT OF THE MONTH SUBMISSIONS

Slides:



Advertisements
Similar presentations
Project Name City, State School Type Construction Type Submitting Firm 2013 Monarch Award.
Advertisements

Regulations for title slide: 1)title this power point slide with your assigned registration number, example: ppt 2)the intent of this title slide.
Submission Instructions – Delete this slide This slide is designed to help you fill out the pro-forma for the 2012 Energy Chamber CSR Awards. Remember.
CA-XXX-1 Nominee Information Nominee/Entrant Name: Fill in here Award Category: Fill in here Firm Name, Address, Phone and Fill in here Contact.
GEtServices Contingent Staff Training For Suppliers Blanket Order.
INSTRUCTIONS The Southeast Region Architectural Exhibit submittal package will be placed on this template. All projects must have been completed and occupied.
DO NOT INCLUDE THIS SLIDE WITH SUBMISSION INSTRUCTIONS 2014 NKBA B.C. Design Competition Digital Entry Packet Questions? Contact
1. Entry Form. Entry Form Instructions In an effort to streamline the submission process and reduce paper use, the submission process will be entirely.
1 Addendum Fall 2006 Limited-Term RFP Detailed Instructions for Bidder Registration and Proposal Submission ENTERGY SERVICES, INC. September 11, 2006.
Member Show 2013 IAEA Member Show Artist Template for submissions and instructions Member Show.
GEtServices Contingent Staff Training For Suppliers.
Requirements 1.Your Subject Title shall state the category, project name and firm name only. Examples; Commercial - First Street Shopping Center.
Submission Instructions – Delete this slide This slide is designed to help you fill out the pro-forma for the 2012 Energy Chamber Exporting Energy Services.
British Photographic Exhibitions Crown Awards BPE.
2014 AIA San Diego Design Awards Submission Instructions Slide PowerPoint Template for the Foundation Categories Each project entry must submit a separate.
Project Name Date of Completion: Fill in Here Program Summary: Please type your program summary here. It should be 25 words or less. I'm just typing this.
Member Show 2014 IAEA Member Show Artist Template for submissions and instructions Member Show.
2014 AIA Jacksonville Design Awards (Test of Time Award) Instructions Slide Upon downloading file from your please save file as submittal number.ppt.
Project Name: Fill in Here. Project Location: Fill in Here. Architect(s): (names and addresses) Fill in Here. Masonry Contractor: Fill in Here. Owner of.
2014 AIA Jacksonville Design Awards ( Un-Built-General Category) Instructions Slide Upon downloading file from your please save file as submittal.
Your team name.
Member Show 2015 IAEA Member Show Artist’s Template for Submissions and Instructions Member Show.
CC Building Area: (sf) Fill in Here Building Type: (sf): Fill in Here Date of Completion: Fill in Here Awards Category: Fill in Here PROGRAM SUMMARY:
Project ID # Building Area Fill in Here Cost per Square Foot Fill in Here Construction Cost Fill in Here Date of Completion Fill in Here Program Summary.
T01.01 Building Area: (SM) Fill in Here Cost per Square Meter: Fill in Here Construction Cost Fill in Here Date of Completion: Fill in Here Program Summary:
Regulations for title slide: 1)title this power point slide with your assigned registration number, example: ppt 2)the intent of this title slide.
Select Category: Hotel Resort Restaurant Spa Vacation/Timeshare Cruise Ship Casino Retail (Erase all except one category) Description: Brief description.
2014 AIA Jacksonville Design Awards (Linda Mack Award) Instructions Slide Upon downloading file from your please save file as submittal number.ppt.
2015 NAIOP Northwest Florida Development Award Nomination Form Instructions Slide Slide 1 is for instruction purposes only and should not be included in.
2014 AIA Jacksonville Design Awards (Craftsmanship Category) Instructions Slide Upon downloading file from your please save file as submittal number.ppt.
2015 NAIOP Northwest Florida Broker Award Nomination Form Instructions Slide Slide 1 is for instruction purposes only and should not be included in the.
Sony Pictures Entertainment SPE IT Finance Payment of SPE IT Contractors.
Communication/Grade/ eChalk Session 2 of y Using Contacts in eChalk .
ULTIPRO RECRUITMENT: LISTS Prepared by Ordette Allen.
CALIFORNIA WINE CLUB WWW. JAVICELLARS.COM. CALIFORNIA WINE CLUB.
THE 19th BIENNIAL DISTINGUISHED BUILDING AWARDS PROGRAM
Project Name Program Summary:
AIA Jacksonville Design Awards (Test of Time Award) Instructions Slide
Remove this slide before submitting.
Student Name Here School Name Here.
Presenter Name, ASLA, Firm name
THE AMERICAN INSTITUTE OF ARCHITECTS
1. Entry Form.
Click to add name of firm
Click to add name of firm
Project Name Program Summary:
PowerPoint Submission Requirements & Instructions
Project Name Program Summary:
Tesla STEM TSA Meeting - September 28, 2017
CALL CAMPUS POLICE AT X4-2500
Click to add name of firm
PowerPoint Submission Requirements & Instructions
Remove this slide before submitting.
Instructions for the Annie Project Presentation Kitty Hutchcroft – Technical Consultant Michelle Grandinetti – Programs and Service Projects Committee.
Rucker Elementary School
Remove this slide before submitting.
THE 20th BIENNIAL DISTINGUISHED BUILDING AWARDS PROGRAM
ENTERGY SERVICES, INC. February 23, 2006
New Member Procedures Go to:
AIA Florida/Caribbean Magazine Project Submission Template
THE AMERICAN INSTITUTE OF ARCHITECTS
School Name Here District Here
AIA Silicon Valley | 2018 Design Awards
PowerPoint Submission Requirements & Instructions
Click to add name of firm
EPS Student Chapter Activity Reports
(Please Submit before September 7, 2019)
Connecticut Chapter of the American Society of Landscape Architects
Connecticut Chapter of the American Society of Landscape Architects
2019 SDGBC Sustainable Design Awards
Presentation transcript:

INSTRUCTIONS FOR PROJECT OF THE MONTH SUBMISSIONS USE ONLY THIS MASTER POWERPOINT FOR YOUR ENTRY. THE FOLLOWING SLIDES MUST BE FILLED OUT TO THE MOST COMPLETE POSSIBLE: THE INFORMATION SLIDE, AND THE PROJECT DESCRIPTION SLIDE . THERE IS A MAXIMUM SUBMITTAL OF 7 IMAGES OF YOUR PROJECT. THE PHOTOGRAPHS THAT ARE INCLUDED (NO RENDERINGS) MUST HAVE THE PERMISSION OF THE PHOTOGRAPHER OF RECORD. THE PROJECT OF THE MONTH WILL INCLUDE THE PROJECT NAME AND ALL PROJECT TEAM INFORMATION. PLEASE DOUBLE CHECK THAT ALL INFORMATION PROVIDED IS CORRECT. NO REPRINTS OR CORRECTIONS WILL BE AVAILABLE. THE ENTRY FEE MUST BE SENT IN TO THE FOLLOWING ADDRESS AND RECEIVED BY THE CHAPTER IN ORDER TO BE CONSIDERED FOR THE PROJECT OF THE MONTH. For members each entry is $25. For non-members each entry is $50. Make checks payable to AIACCC. SEND ENTRY FEE TO: AIACCC PO Box 12344 San Luis Obispo, CA 93406 EMAIL THIS COMPLETED POWERPOINT TO info@aiacentralcoast.org BY THE DEADLINE TO BE CONSIDERED INTO THE NEXT PROJECT OF THE MONTH COMPETITION.

INFORMATION NAME OF PROJECT: PROJECT TEAM: YOUR PROJECT NAME PROJECT TEAM: ARCHITECT: ENGINEERS: CONTRACTOR: OWNER: (IF NECESSARY) CONTACT INFORMATION: YOUR CONTACT INFORMATION 0#

PROJECT DESCRIPTION ADD 300 WORDS MAXIMUM 0#

0#

0#

0#

0#

0#

0#

0#