Mini-Tower test results

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM15 PSR, Oct. 14, 2005 GLAST LAT Tracker Tower15 Pre-Ship Review INFN-Pisa.
Advertisements

Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Sci-Fi tracker for IT replacement 1 Lausanne 9. December 2010.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
May 14, 2015Pavel Řezníček, IPNP Charles University, Prague1 Tests of ATLAS strip detector modules: beam, source, G4 simulations.
2005 LAT-COLLABORATION MEETING Gamma-ray Large Area Space Telescope A walk through the LAT Tracker towers alignment Nicola Omodei INFN-Pisa.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT Silicon Tracker Marcus ZieglerAPS April Meeting The GLAST Silicon Tracker Marcus Ziegler Santa Cruz Institute for Particle Physics University.
GLAST LAT Project Instrument Analysis Meeting– May 27, 2005 Hiro Tajima, TKR Bad Strips 1 GLAST Large Area Telescope: TKR Bad strips analysis update Hiro.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
GLAST LAT Project Instrument Analysis Workshop 5 – 05/08/29 F. Piron & E. Nuss (IN2P3/LPTA – Montpellier) 1 Comprehensive review of CAL calibrations Gamma-ray.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: On-Orbit Calibration and.
GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 1 GLAST Large Area Telescope: TKR Efficiency Trending.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
Tracker Subsystem1 GLAST LAT Project FM-B PSR, 10 Feb, 2005 GLAST LAT Tracker Tower-B Pre-Ship Review Luca Latronico INFN-Pisa
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
Tracker Subsystem1 GLAST LAT Project Production Readiness Review, 25 August, 2004 GLAST LAT Tracker TOWER-A PRR TKR Tower Electrical Test Plan Luca Latronico.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
Beam Tests of 3D Vertically Interconnected Prototypes Matthew Jones (Purdue University) Grzegorz Deptuch, Scott Holm, Ryan Rivera, Lorenzo Uplegger (FNAL)
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
GLAST LAT Project Instrument Analysis Meeting– Feb 28, 2006 Tsunefumi Mizuno TowerTrend_ ppt 1 Tracker Parameters Trending Monitor GLAST I and.
Gamma-ray Large Area Space Telescope Tower 1 TVAC tests Bad ladders issues.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
GLAST LAT ProjectMRB 09/14/2005 L. Latronico1 Tower 14 – Layer Y0 malfunction MRB Meeting – 14 September 2005.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
GLAST Large Area Telescope:
GLAST LAT tracker signal simulation and trigger timing study
Investigation on tray MID 063 Back
GLAST Large Area Telescope:
FNAL Production Experience
Gamma-ray Large Area Space Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Lessons Learned and Earned Value Management System Assessment
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
The encapsulation problem of the LAT heavy trays
GLAST Large Area Telescope:
Mini Tower Preliminary Results
GLAST LAT System Engineering
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

Mini-Tower test results Gamma-ray Large Area Space Telescope Mini-Tower test results Luca Latronico INFN Pisa for the TKR subsystem GLAST International Collaboration Meeting Accademia Nazionale dei Lincei Roma 15-18 September 2003

Motivations First complete working prototype of flight-like hardware 6 Si-layers – 5 trays – minimal configuration for L1T Test specific TKR hardware components and assembly strategies: flight Si-Ladders assembly and test mechanical Trays assembly MCMs (GTFE/GTRC tests), assembly onto trays, bonding flex cables tower sidewalls and assembly tools Test ELX/DAQ components Develop EGSE TKR test suite to test, qualify, operate a tower before delivery to I&T Develop documentation templates for efficient hands-off to I&T Support I&T during integration with CAL Data taking with CR and 17MeV VdG gamma

History First version of minitower built last february/march Main problems to be addressed MCM: instabilities in the GTFE chip required fine-tuning of the low voltage bad pitch adapter (too small pads, not flat surface) bad bias HV insulation Flex cables and connectors to MCM Trays were shipped back to INFN and refurbished with new electronics: MCM: new GTFE chip (G3) improved pitch adapter HV insulation improved with insertion of a Kapton layer New flex cables and connectors

Preliminary tests on MCMs Functional tests from UCSC repeated in Pisa on all bare MCMs GTFE /GTRC register testing Load all possible layer configurations and read few events Inject charge in all channels and look for noisy or dead channels (1 dead ch found) occupancy scan vs threshold Gain is threshold giving 50% occupancy divided injected charge Noise is width of curve

Gain and noise measurement with strips connected gain does not change strip noise dominated by capacitive load – reliable tool for disconnected strip search

Still missing channels for pitch adapter problems left side right side tracks shift Bad gluing and planarity

Still missing channels for pitch adapter problems The HV, GND and some channels lines are wrapped around the PCB edge, preventing bonding Wrong pitch 191 missing wire-bonds to strips had to give up redundancy of bias HV connections on border ladders

Minitower construction Stacking the trays - sidewalls are reference and support Complete the stack Complete open structure Cabling each side after opening its sidewall

Just 2 hours later real cosmic events start flowing tracks hitmaps Hit multiplicity Time Over Threshold

Noisy strip search Strip Occupancy low statistics Occupancy < 10 –4 (LAT-SS-17-5 TKR Level III specs) 13 strips masked Noisy strip search 22M evts threshold DAC = 30 Strip Occupancy

Layer noise occupancy Residual occupancy dominated by CR  1/4 MIP Layer noise occupancy Residual occupancy dominated by CR CR occupancy = CR accidental rate <ToT><cluster-size><CR trigger rate> = 10ms * 2 * 30Hz  6 10-4

Spatial resolution Alignment Exp STDEV (um) Meas STDEV (um) layer Exp STDEV (um) Meas STDEV (um) Meas AVG (um) X1 250 225 -185 X2 115 105 85 X3 210 195 -160 Y1 240 -64 Y2 135 35 Y3 275 -75 Alignment Ratio Expected value Measured value mean(X2)/mean(X1) 0.46 mean(X2)/mean(X3) 0.54 0.53 mean(Y2)/mean(Y1) 0.55 mean(Y2)/mean(Y3) 0.48

Detection efficiency Full efficiency plateau up to  ½ MIP Occupancy @ beginning of efficiency plateau is already as low as 10 –7 (mainly cosmics) Occupancy @ DAC Threshold = 10 60% 1MIP

Light leak from the top Y1 internal layer X3 top layer Charge injection Sidewall could not be tightened for a thermistor out of place on a cable efficiency Pulse height

Light leak and leakage current CC with top layer see non-negligible current decrease

Bad HV connection on border ladder Border HV line not bonded for pitch adapter and bias circuit inconsistency Inner line interrupted on MCM side Repaired with drop of coductive gloue

Cosmics - hitmaps Threshold = 30 DAC, range 0, 13 strips masked. ~ 15000 events collected. Y1 and Y2: “shadow” of Y3. X2: “ladder 4” issue. Y3: 157 wire bonds missing (due to problems with pitch adapter). X3: 7 wire bonds removed.

Real CR events from the integrated system

Conclusions TKR Minitower refurbished in one week TKR Minitower completely characterized before delivery Met specs in terms of efficiency, occupancy TKR Minitower delivered to I&T according to schedule Integration with CAL at SLAC Still problems in mechanics of pitch-adapter (2% channels could not be bonded) Residual problems in pitch adapter alignment and MCMs bias lines + inconsistencies with older bias circuit induced bias problems in 2 border ladders Still read-out problems (time-out errors) in few events (1/1000) find more at http://glastserver.pi.infn.it/glast