Supervisor: Jonathan Emery Labview control BWS Calibration Bench.
Advertisements

PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
BWS electronics design status J.Emery & Luca, Pierre-Jean, Emiliano, Jose, Alexander and all past contributors!
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
Anonymous | Secure | User friendly
LIU Wire Scanner Project
Jan 2016 Solar Lunar Data.
Power and control electronics for the new fast wire scanners
Brief Status SPS Prototype PSB Prototype Installed in LS1
LIU Wire Scanner Milestones June 2017

BI seminar agenda “Project context and Introduction to the collaboration with the HES-SO”, 10 min, Jonathan Emery, CERN “A Generic and Modular Protocol.
Investigation on the digital controller for the BWS
LIU Beam Wire Scanners: Status and plans for new SPS and PSB BWS
BE-BI Software for LINAC4
The ELENA BPM System. Status and Plans.
Status of the BI Work Package in the LIU-PSB frame
PS wire scanner failures
Electronics status September 2017
LHC wire scanners status
LIU Wire Scanner Series Costs
Beam Wire Scanners (PS prototype and LIU series)

Average Monthly Temperature and Rainfall

2017 Safety Group 1 – 5 Year Program Timeline Guide

May Jun Jul Aug Sep Oct Nov Dec 2017 Milestone 1 May 10



Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Office Timeline Template



2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March

TSF Upgrade Project Overview Resources Plans and Timetable
2019 Safety Group 1 – 5 Year Program Timeline Guide



Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE

2017 Advantage Program Timeline Guide
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
2016 Safety Group 1 – 5 Year Program Timeline Guide
Text for section 1 1 Text for section 2 2 Text for section 3 3
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
2012 Safety Group 1 – 5 Year Program Timeline Guide

2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
TEL031 ODL Analytics Main Activities
LIU BWS Firmware status
LIU Wirescanners software
Presentation transcript:

Working plan for 2017 Acquisition and Control Electronics BE-BI Beam Wire Scanner Working plan for 2017 Acquisition and Control Electronics J. Emery for the wire-scanner Inputs from Federico, Patrik & Jose

Work plan for the electronics BE-BI Beam Wire Scanner May Jun July Aug Sep Oct Nov Dec Power boards Inverter v1 test Power bench Inverter firmware Tests and validations Tests new drive Control board VFC mezzanine design BWS firmware VFC Intelligent drive Design office Assembly and tests Production 3 units Acquisition sensor PMT SPS 4xPMT PSB Review New sensor investigation? Tests new acquisition Acquisition electronics Investigations Design Control design & prototypes tests New brake New resolver FPGA based

Electronics system usage for 2017 BE-BI Beam Wire Scanner Ready for mid-June to be installed when machine TS FPGA control As needed for MD FPGA control DSPACE control FPGA control Power unit Acquisition proto + oscilloscope Power unit Power unit oscilloscope SPS prototype LSS5 PSB prototype Calibration & mechanical bench 867 Wire-scanner electronics lab 865

Motor Inverter and Cap.charger board status BE-BI Beam Wire Scanner Motor Inverter and Cap.charger board status Motor Inverter Board Recived and under test. Will need 1 week more for basic functional test. - 2 week’s of firmware test. - Second stage is to build up a labview test system. Which is needed because no access to the Dspace system. Is around 2 weeks programming and then 1 week test. But the board need to be tested with Dspace and the motor, as soon as possibly( August maybe?). This is needed for to be able to do a stress test. Cap.charger. Under production, could be ready end of next week 19/05. The it will need 1-2 week’s of testing. Slide from Patrik Andersson

Intelligent drive integration BE-BI Beam Wire Scanner Intelligent drive integration The integration will start in July 2017. Missing mechanically part’s is following. - Support Motor inverter board Baseplate for the 19” box. VFC & Meazzine mechanic unit. Front panel and back panel, first design done but need to be update for the VFC & Meazzine unit. All this need to be designed and manufactured under May and June. Slide from Patrik Andersson

Current situation and main 2017 milestones BE-BI Beam Wire Scanner Slide from Jose Sirvent