GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
Advertisements

GLAST LAT Project Managers F2F Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test April.
IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Safety Overview.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 1.1 Management 1 GLAST Large Area Telescope: Mechanical.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 5, 2007 Ken Fouts.
GLAST LAT Project Lessons Learned / Needed Procedures/ Documentation Control – October 23, 2003 B. Grist1 Lessons Learned / Needed Procedures / Documentation.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT Project Technical/Cost/Schedule Review 03/31/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT Project Technical/Cost/Schedule Review 09/01/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT Project Integration and Test IFCT Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test GLAST Large Area Telescope:
GLAST Large Area Telescope:
Peer Review Agenda (Suggested).
7E: Tower test plans GLAST Large Area Telescope: Tracker Subsystem
GLAST Large Area Telescope:
GLAST Large Area Telescope GLAST Large Area Telescope
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST Large Area Telescope: I&T Test Readiness Review
Introduction and Overview
GLAST Large Area Telescope:
Overview Cost to Complete
Design Integration and Analysis
GLAST Large Area Telescope:
GLAST Large Area Telescope: Deputy for Systems Engineering
GLAST Large Area Telescope:
Presentation transcript:

Mechanical Integration Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Mechanical Integration Ken Fouts kfouts@slac.stanford.edu

Key I&T Requirement Documents Released Revision LAT-MD-00408-04c LAT Instrument Performance Verification Plan 4/7/05 LAT-MD-02730-02d2 LAT Performance and Operations Test Plan 6/7/05 LAT-MD-00676-04 LAT Assembly Sequence 9/1/05 LAT-MD-00895-04 LAT Instrument Survey Plan 2/1/05 LAT-DS-05210-52 LAT Systems KIT, Cable Installation 11/2/05 LAT-DS-02563-02 LAT Instrument Assembly 10/28/05 LAT-DS-06721-02 External Cable Assembly Sign-off LAT-DS-06639-01 LAT Integration Config Assy LAT-DS-06958-02 ACD Lift Fixture 9/28/05 Requirements Definition Key to Successful I&T

I&T Process Procedures Document Released Revision LAT-PS-07240 ACD Integration Procedure 11/2/05 LAT-PS-04911 DSHP Installation Procedure Sign-off LAT-PS-07575-02 LAT Instrument Safe to Mate Procedure LAT-PS-07125-02 ACD Safe to Mate Procedure 10/28/05 Document Detailed Procedures for use in I&T

Roadmap to ACD Integration and Test Install Flight PDU LAT-DS-02563 Install EM GASU LAT-DS-02563 Safe to Mate Flight Cables for PDU/GASU/ACD LAT-PS-07575 Bond Downspout Heatpipes and Fitcheck X-LAT Plate LAT-PS-04911 Complete Grid Thermal Control Installation LAT-DS-01580 Install Instrumentation Accels and TC’s LAT-DS-02563 16 Tower CPT w/ACD ACD Integration LAT-PS-07240 16 Tower LAT Optical Survey LAT-MD-00895 16 Tower CPT Critical steps have been identified and are in the current I&T plan

LAT I&T ACD lift fixture fabrication and check-out complete. MGSE LAT-DS-6958 ACD Lift Fixture Fit-check complete with ACD simulator Proof tested per LAT I&T AIDS #1588 LAT I&T ACD lift fixture fabrication and check-out complete.

ACD Lift Fixture

ACD Lift Fixture w/ ACD

ACD Integration Procedure (1 of 2)

ACD Integration Procedure (2 of 2)

Hardware is in-place to support the current plan Hardware Summary Hardware is in-place to support the current plan

Risks have been anticipated and plans put in place to mitigate them

LAT I&T is ready to proceed with ACD integration Summary Current plan is to maintain two shift operation. Utilize weekends maintain schedule. Procedures, Drawings, MGSE and Flight Hardware in place to support current Phase 0 plan. Additional subsystem personnel have been identified to support LAT I&T Operations. LAT I&T is ready to proceed with ACD integration