Concept of ADS-B via Satellite

Slides:



Advertisements
Similar presentations
By Andy Knill Head of Surveillance and Spectrum Management UK Civil Aviation Authority.
Advertisements

Paris Mar 2011 Preparations for WRC-12 WRC -12 AGENDA ITEM 1.3 ON UAS Presented by John Taylor EUR RPS for WRC-12 preparation.
Cairo Sept 2010 Preparations for WRC-12 WRC -12 AGENDA ITEM 1.3 ON UAS Presented by John Taylor MID RPS for WRC-12 preparation.
Aerospace Vehicle Systems Institute Update on WAIC Issues ITU-R Working Party 5B and Future Regulatory Considerations Joe Cramer December 16, 2009.
John Taylor Nairobi, Kenya Sept 3-4, 2013 Concept of ADS-B via Satellite 1.
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
To consider additional spectrum allocations to the mobile service on a primary basis and identification of additional frequency bands for International.
John Taylor Nairobi, Kenya Sept 3-4, 2013 WRC-15 Agenda Item
Meteorological Spectrum Issues- Outcome of the 2003 World Radiocommunication Conference Presented By: David Franc National Weather Service December 2,
Spectrum for UAS UAS at WRC-12 European WRC-12 preparation Martin Weber, Federal Network Agency, Germany EU UAS Panel Workshop Brussels,
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.3 – Unmanned aircraft systems Presenter: Bill McDonald.
Nairobi, Kenya September 2007 Preparations for WRC-07 Overview of Regional and National proposals as of 13 September 2007 Presented by Robert Witzen.
CEPT preparations status for WRC-15 Mr. Per Christensen (ECO Director) August 2015 The second Annual Middle East & North Africa Spectrum Management Conference,
John Taylor ICAO Preparatory Spectrum Seminar for WRC-15 Thailand March 11-12, 2014 WRC-15 Agenda Item
WRC–12 Industry Debrief 23 April 2012 Agenda item 8.2 – Future WRC Agendas.
International Telecommunication Union Document WRC-15-IRWSP-15/16-E 1 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION.
National Preparatory Working Group meeting for World Radio-communications Conference 2015 Aeronautical Agenda Item 1.7 Presented by Takalani Tshikalaha.
Agenda item Allocation to the Fixed- Satellite Service in the 7 ‑ 8 GHz range Presenter: Carol Wilson (Coordinator: Kevin Knights)
Decisions of RA-15 and WRC-15 with Special Relevance to Developing Countries Решения AR-15 и ВКР-15 в особенности касающиеся развивающихся стран Иштван.
International Telecommunication Union Document WRC-15-IRWSP-15/8-E 3 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION.
CEPT position on WRC-12 AI’s 1.3, 1.4, 1.7, 1.12 and 1.25
WRC-15 Agenda Item 1.5 Fixed Satellite Service spectrum to support the safe operation of Unmanned Aircraft Systems Aeronautical Spectrum Workshop Preparation.
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
WRC-19 – Agenda Items for Other Issues
Harvey Gabriel LEKAMISY
Workshop on preparations for ANConf/12 − ASBU methodology
Preparations for WRC-12 WRC -12 AGENDA ITEM 1.3 ON UAS
Agenda Item ITU WRC-15 Presented by Koos Pretorius, SACAA
ICAO Position for ITU WRC-15
UAS BLOS (satellite) Control and Non-Payload (CNPC) Communications
PROPOSED AMENDMENT TO THE DRAFT ICAO POSITION FOR THE INTERNATIONAL TELECOMMUNICATION UNION (ITU) WORLD RADIOCOMMUNICATION CONFERENCE 2015 (WRC-15) APAC.
Update on WAIC Issues ITU-R Working Party 5B and Future Regulatory Considerations Joe Cramer December 16, 2009.
Steering Group on Radio Frequency Coordination (SG-RFC)
Panel Session 2 WRC-15 Agenda items 1.16, 1.4, 1.15
ITU Working Party 8B Activities
Loftur Jónasson, ICAO 11 March 2013
RADIO SPECTRUM MANAGEMENT
ICAO Position for ITU WRC-15
Challenges and opportunities for CEPT
Satellite Communications
PRELIMINARY POSITION OF THE RCC CAs ON THE AGENDA ITEMS OF THE WORLD RADIOCOMMUNICATION CONFERENCE 2012.
Aeronautical Communications Global Needs Global Solutions
WRC Agenda Item 1.1 to consider additional spectrum allocations to the mobile service on a primary basis and identification of additional frequency bands.
Ground System implication for ASAS implementation
5G - IMT-2020 Technology.
SADC WRC-15 Preparatory Meeting
WRC-15 Agenda Item 1.7 John Taylor ICAO Preparatory Spectrum Seminar for WRC-15 Thailand March 11-12, 2014.
ITU Workshop on the Efficient Use of the Spectrum/Orbit Resource, April 2014 The Evolution of Mobile Satellite Applications.
ASSTAR Project Overview & User Forum Objectives
WRC-12 A.I. 1.3 Eric ALLAIX DGAC-DSNA.
John Taylor ICAO Spectrum Workshop for WRC-15 CAIRO Feb 16-17, 2015
NAVISAT Middle East & Africa.
New Entrants, Commercial Space and Changing Airspace Management
WRC-15 Agenda Item 1.5 Fixed Satellite Service spectrum to support the safe operation of Unmanned Aircraft Systems Aeronautical Spectrum Workshop Preparation.
Draft ICAO Position for ITU WRC-19
François Rancy Director, ITU Radiocommunication Bureau
COSPAR SA 2008, E110 IUCAF session
SADC WRC-15 Preparatory Meeting
François Rancy Director, ITU Radiocommunication Bureau
Update of ARIB Activities on IMT Standardization
Draft ICAO Position for ITU WRC-15
NİŞANTAŞI ÜNİVERSİTESİ
World Radiocommunications Conference
WRC-15 Agenda Item 1.5 Fixed Satellite Service spectrum to support the safe operation of Unmanned Aircraft Systems Aeronautical Spectrum Workshop Preparation.
John Taylor Nairobi, Kenya Sept 3-4, 2013
Possible Future Agenda Items
Draft ICAO Position for ITU WRC-15
Inmarsat Position on WRC-19 Agenda Item 9.1 Issue 9.1.1
GSC position on key WRC-19 AI 1.5 ESIMs
The role of spectrum in achieving interoperable governmental and commercial communications networks Enrico Vassallo, ESA Frequency Management Office Head.
Presentation transcript:

Concept of ADS-B via Satellite John Taylor Nairobi, Kenya Sept 3-4, 2013

Overview ADS-B as it is today (terrestrial limitations) ADS-B via satellite (as an extension to terrestrial) Operational benefits (remote, oceanic, polar areas) Some technical analysis already underway (ESA) Need for an allocation for the uplink to satellite No WRC-15 Agenda Item Bureau Directors Report to WRC-15

Overview of ADS-B as it is today A proven airborne surveillance technology Air-to-air and air to ground operation at 1090 MHz ADS-B data available to ATM where terrestrial infrastructure exists Coverage is limited when ground stations are not widely installed ADS-B data not available in oceanic, Polar, remote areas

The concept of ADS-B via satellite ADS-B via satellite is being actively investigated Existing ADS-B signals from aircraft available for reception by satellites Space-borne ADS-B receivers onboard a global satellite constellation could greatly expand coverage ADS-B coverage over oceanic, Polar and remote areas ADS-B data available to Air Traffic Management

Operational Benefits Expanded ADS-B coverage and data availability could, Lead to changes in airspace management Direct routings and increased altitude availability Cost benefits to airlines and commercial users

Preliminary technical analysis Stratospheric balloon experiments have been conducted Carrying 1090 MHz sensors to characterize and demonstrate detect ability of signals Detection above 100,000 feet achieved, plus from aircraft in excess of 500 kms range The DLR German Aerospace Center has contributed an ADS-B sensor for experimental evaluation onboard satellite ESA launched Proba V in May 2013 with ADS-B sensor Principle of detecting ADS-B signals from above, rather than below already proven by DLR using stratospheric balloons Proba V will assess detecting signals from 820 kms up in orbit

Allocation requirement at 1090 MHz uplink No allocation in the Radio Regulations exists at 1090 MHz to include the uplink to the satellite The only suitable allocation for the aircraft to satellite uplink would be aeronautical mobile satellite (route) service, AMS(R)S The band 960 – 1164 MHz is allocated to AMRS and ARNS ADS-B data contains navigation position information, velocity, aircraft ident, Mode A/C etc From a Radio Regulatory view, ADS-B data is a combination of AMRS and ARNS Satellite reception of ADS-B has not been done before

WRC-15 Considerations ITU WP 5B is developing a Preliminary Draft New Report on the concept of ADS-B via satellite PDNR will be mature and adopted by SG 5 prior to WRC-15. It will highlight the need for an uplink allocation at 1090 MHz for AMS(R)S The DNR needs to be referenced in the Bureau Directors Report to WRC-15 WRC-15 may be able to consider the allocation need for the satellite reception of ADS-B signals Consideration of an allocation requirement in the Radio Regulations at 1090 MHz was post WRC-12 No agenda item is available at WRC-15 to consider the 1090 MHz AMS(R)S requirement Need to consider possible alternative to highlight the allocation need during WRC-15

Conclusion Aviation community to work in support of the development of the ADS-B PDNR in WP 5B Where possible participate in the work of national and regional preparations to ensure specific mention of the AMS(R)S allocation uplink requirement is included in the Bureau Directors Report to WRC-15