CMS gas systems meeting

Slides:



Advertisements
Similar presentations
WP6: Quality Assurance and Reliability Testing A. Honma, CERN PH/DT 30 April 2010DT Steering Board Meeting, A. Honma1  Mandate  Manpower and Resources.
Advertisements

ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. W. Zeuner, W. Riegler, R. Lindner, B. Di Girolamo, G. Corti, C. Schaeffer,
Server Virtualization: Navy Network Operations Centers
European Organization for Nuclear Research LHC Gas Control System Applications G.Thomas, J.Ortola Vidal, J.Rochez EN-ICE Workshop 23 April 2009.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
04/02/ FH Plans for 2005 PH-DT1-GS. 04/02/ FH Physicists: Stefan Haider, Serguei Morozov (PJAS), Ferdi Hahn, Mar Capeans Technicians: Andrea.
The Construction of the LHC Detector Gas Systems ? Ferdi Hahn PH-TA1-GS Detector Steering Meeting 4th of June 2004.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Technical Support Activities in PH-ADO-PO
19/02/2014A. D'Auria CERN/PH-DT-DI Maintenance ID flushing system:  Maintenance 2 dryers  Installation 2 flow meters  Maintenance of several hygrometers.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Gas Systems for Particle Detectors R.Guida on behalf of the PH-DT-DI/Gas Service Team PH-DT Seminar CERN September 4 th, 2014.
LHCbComputing Manpower requirements. Disclaimer m In the absence of a manpower planning officer, all FTE figures in the following slides are approximate.
LHCb upgrade cooling Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
GIF++ gas systems 11/07/2014Ernesto, Roberto PH-DT-DI gas service1.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
Detector Gas Systems Status Update Ferdi Hahn PH-TA1-GS Detector Steering Meeting November 2004.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
Atlas Gas Systems - CPC6 Upgrade and Re-Commissioning Infrastructure Meeting – 8th January 2014 Steve Pavis PH-DT-DI/Gas.
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
Upgrade week Apr10 AB CMS assembly & lab areas: future External constraints : entire 3000m 2 CMS area in ISR destined for rad material treatment entire.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
26/03/2014L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI New recuperation system for n-Pentane:  Installation of the module in parallel of the first.
PH-DT FLUIDIC SYSTEM 1 ST SECTION MEETING 19 NOVEMBER 2015.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
25/04/2014R. Guida, A. Wasem PH-DT-DI Gas1 Outline ALICE gas systems meeting Outline Introduction Review usage of ALICE gas M&O 2013 Review achievements.
25/03/2014P. Carrie, R. Guida, S. Pavis PH-DT-DI Gas1 Outline LHCb gas systems meeting Outline Introduction Review usage of LHCb gas M&O 2013 Review achievements.
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
Gas system for NA62 Straw detector Roberto Guida On behalf of Gas Service Team NA62 Straw working meeting, March 26, 2012 Outline: P&I Drawing Schedule.
TE-CRG Activities D. Delikaris, TE-CRG.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
GIF++ gas system Outline:  Beam and cosmic trigger  Gas distribution panels  Gas detection (present and final layout)  Conclusions 14/1/2015R. Guida,
CERN GS Department CH-1211 Genève 23 Switzerland cern.ch/gs-dep Internet Services GS AIS General Services Department GS Advanced Information Services EVM.
Thursday November 19 th, 15:00 Hrs, room 155-R-047 Agenda An introduction to the Project Office.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Section Meeting News and MARS 22/01/ FH1. General Activity and Staff Organigram for the DI Section 22/01/ FH2 TF+GlassAndre Braem Thomas Schneider.
1M. Battistin M. Battistin CERN EN/CV/DC 9 th July 2009 CO2 kick-off NIKHEF - Cooling activities organization at CERN 9 th July 2009.
Detector Gas Systems Status Update Ferdi Hahn PH-DT1-GS 3 rd Detector Steering Meeting on Gas Systems June 2005.
CO2 ON-CALL SERVICE ORGANISATION
ICE SECTION The coolest place to be! Elias Métral
Situation of the Static Var Compensators at CERN.
RD51 test facilities E. Oliveri (CERN) on behalf of RD51.
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
PH-DT Seasonal Group Meeting 21/1/14
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
LIU Consolidation project (INDICO ) E. Blanco BE/ICS
Gas system Commissioning procedures and status
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
Gas System Commissioning
June 22, 2017 Burkhard Schmidt for the DT coordination team
White Paper Theme 3 - WP7 Facilities & component analysis for detector r&d WP7 Meeting #1 Mar CAPEANS CERN PH-DT.
CRG-TM: LS1 projects review
M. Battistin CERN EN/CV/DC 9th July 2009
4th FRC meeting, Antti Onnela, CERN-PH-DT
Savannah to Jira Migration
R. Guida PH-DT-DI Boston Students Program CERN, 16/1/2013
Current Status Future Progress Monitoring
Upgrade Strategy for the Experimental Vacuum Systems
Overview & baseline of LS2 and roadmap for CRG
Benoît DAUDIN (GS-AIS-PM – CERN) 22-March-2012
HL-LHC upgrade at IPHC news
Upgrade Phase 2 Mechanics meeting, 21 March 2013 Introduction
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Comments on the North Experimental Area Consolidation Request Form
Presentation transcript:

CMS gas systems meeting Outline Introduction Review achievements during 2013 Review usage of CMS gas M&O 2013 Review of 2013 upgrade projects Agree/Review activities and schedule for 2014 Outline 18/02/2014 R. Guida CERN/PH-DT-DI

PH-DT-DI Gas Service Team Gas Service Team mandate: M&O and upgrades of the gas systems for all the LHC experiments: preventive and corrective maintenance on 30 gas systems on-call service all along the year (24/24 7/7) – phone 162516 Construction of gas systems for other experiments at CERN (CLOUD, NA62, LINAC4, …) General support for test beam and equipment belonging to external users. ALICE Albin Wasem ATLAS Frederic Merlet (0.25) Louis-P. De Menezes (0.5) CMS-TOTEM Andrea D’Auria (0.5) LHCb Patrick Carrie (0.5) Steven Pavis (0.25) Coordination R. Guida FSU team Jonathan Dumollard Abdelmajid Laassiri Benjamin P. Marichy Herve Martinati Ace Ordanov (User) Cedric Landraud (also CMS-CO2) Guillaume Lacroix (also CERN Expo) Introduction – Working team 18/02/2014 R. Guida CERN/PH-DT-DI

PH-DT-DI Gas Service Team First contact person for all issues related to CMS gas systems during working hours is in charge of: -standard operation -standard maintenance/small modifications -daily check of all systems CMS-TOTEM Andrea D’Auria 16-0021 CMS experiment and Gas Service Team If Andrea is in holiday or busy: -during working hours  call directly Roberto (16-2146) -outside working hours  call directly on-call service (16-2516) Outside working hours  call directly on-call service (16-2516) 18/02/2014 R. Guida CERN/PH-DT-DI

Gas Service working team In order to cope with LS1 a significant reinforcement of the team during 2013 was needed: two new users with high experience in the workshop (mechanics and gas systems) many students for short and well defined projects Details: CERN FTE (and students > 1 year): 6.3 FTE: +1.3 wrt 2012  Ernesto: TTS 50% for gas project “FSU” (FSU + technical users): 5.5 FTE: +1.5 wrt 2012  Ace: user on ATLAS budget Andrei: user on ALICE budget Trainees (student < 1 year) 1.9 FTE: +1.8 wrt 2012  4 trainees (3 from Poland, 1 from Canada) 2 summer students 2 children of staff members Working team 18/02/2014 R. Guida CERN/PH-DT-DI

PH-DT-DI Gas Service Team 2013 activities can be divided into three main sectors: Standard maintenance of gas systems for the LHC experiments LS1 consolidation program for the LHC experiments Not LHC experiments/support to users Standard maintenance and LS1 consolidation program constitute the main field of activity Not LHC experiments and support to users represent about 20% of the activities LS1 – 2013: Overview 18/02/2014 R. Guida CERN/PH-DT-DI

Review usage of CMS gas M&O 2013 CMS contribution to M&O budget for gas systems: 157 kCHF On-call service: purifiers RPC, CSC IR RPC SGX5 Supply R134a CSC broken bubbler Distribution RPC, CSC, … Primary Gas Supply monitoring alarm SX5 and 904 mixers CMS gas M&O 2013: on-call 18/02/2014 R. Guida CERN/PH-DT-DI

Review usage of CMS gas M&O 2013 On-call service summary On average only 1.5 h/year/system of downtime (power-cuts and outside events excluded) Intervention triggered by: CMS gas M&O 2013: on-call Intervention are: Equally distributed between experiments Decreasing with time  18/02/2014 R. Guida CERN/PH-DT-DI

Review usage of CMS gas M&O 2013 CMS gas M&O 2013: material 18/02/2014 R. Guida CERN/PH-DT-DI

Review usage of CMS gas M&O 2013 CMS gas M&O 2013: material 18/02/2014 R. Guida CERN/PH-DT-DI

Review usage of CMS gas M&O 2013 CMS gas M&O 2013: material for gas workshop 18/02/2014 R. Guida CERN/PH-DT-DI

Review usage of CMS gas M&O 2013 CMS gas M&O 2013: FSU resources 18/02/2014 R. Guida CERN/PH-DT-DI

Review usage of CMS gas M&O 2013 Summary: CMS gas M&O 2013: summary about 13 kCHF overspending 18/02/2014 R. Guida CERN/PH-DT-DI

Review of 2013 upgrade projects Summary: Upgrade projects 2013: summary Others related to CMS: CMS-TIF lab186: Mixer and distribution for GEM detector Flushing distribution for CO2 cooling plant CMS-TIF CO2 cooling plant construction in gas workshop. 18/02/2014 R. Guida CERN/PH-DT-DI

LS1 – 2013 18/02/2014 R. Guida CERN/PH-DT-DI

More details available on the excel table in agenda LS1 – 2014 schedule 18/02/2014 R. Guida CERN/PH-DT-DI

Software upgrade Main responsible: Steven Pavis EN-ICE is preparing the migration to a new software version (CPC6 & more). The migration requires to (~) completely rewrite the code (PLC+PVSS): Preparation phase needed to define strategy and milestons Define modules, test logic, … Validation of one/two gas systems covering almost all functionalities Deployment on one experiment (all detectors) Deployment on all the experiments A complete commissioning will be required (same as it was done at the first start-up of the gas systems) About one-two week of stop/instability for each detector (CSC, DT, RPC, T1, T2, ID flushing, …) Activitiy scheduled from beg. March to June 2014 Software upgrade 18/02/2014 R. Guida CERN/PH-DT-DI

Software upgrade Main responsible: Steven Pavis Software upgrade 18/02/2014 R. Guida CERN/PH-DT-DI