Milestone A to Milestone B Requirements Management Activities

Slides:



Advertisements
Similar presentations
Lesson Objectives Review Capabilities Development documents and processes for Information Technology and Information Systems IT Box – (current JCIDS manual)
Advertisements

Overview of Acquisition Policy Changes
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
Phase B Exit Criteria Issues Resolved or Addressed Technical Reviews / Readiness Reviews, Audits Initiate Milestone C Program Review Planning Process Initiate.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Life Cycle Logistics.
1 1 Nunn-McCurdy Legislation/Program Impacts Della McPhail Chief Financial Officer 308 ARSW DISTRIBUTION STATEMENT A: Approved for public release; distribution.
System Integration Exit Criteria Issues Resolved or Addressed Preliminary Design Review/Critical Design Review, Audits Initiate Design Readiness Review.
1 3 Dec 2008 Changes from the May 2003 DoDI Policy Flowing from Numerous New/Revised sections of Public Law since 2003 (some with Multiple Requirements)
PEO C4I and SPACE FULL-RATE PRODUCTION REVIEW TIMELINE
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
Materiel Development Decision (MDD) Information Requirements
Business, Cost Estimating & Financial Management Considerations
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
DoD Template for Application of TLCSM and PBL
Contracting (Product) Considerations
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Supportability Design Considerations
System Engineering Considerations (See Chapters 3 and 9)
Technology Readiness Assessment (TRA)
Life Cycle Logistics.
MNS - Mission need statement
Competitive Prototyping – the New Reality
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
MDD to Milestone A Requirements Management Activities
NSS SMC/XR Template SMC April 2008; rev19 Program Management
ISA 201 Intermediate Information Systems Acquisition
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Production Considerations
JTAMS MILESTONE A ANALYSIS
Milestone A to Milestone B Requirements Management Activities
New Space Systems Acquisition Policy
DAG CH 3 Figure 11: Weapon System Development Life Cycle
ISA 201 Intermediate Information Systems Acquisition
Milestone B to Full Operational Capability (FOC) Requirements Management Activities RQM-310, December 2016.
Test and Evaluation Considerations
DAG CH 3 Figure 17: Weapon System Development Life Cycle
DAG CH 3 Figure 23: Weapon System Development Life Cycle
Milestone A to Milestone B Requirements Management Activities
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
Information Required for Milestone and Decision Reviews
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
DAG CH 3 Figure 13: Weapon System Development Life Cycle
DAG CH 3 Figure 19: Weapon System Development Life Cycle
Product Support Considerations
DAG CH 3 Figure 18: Weapon System Development Life Cycle
DAG CH 3 Figure 28: Weapon System Development Life Cycle
DAG CH 3 Figure 15: Weapon System Development Life Cycle
The Department of Defense Acquisition Process
DAG CH 3 Figure 21: Weapon System Development Life Cycle
JTAMS PRE-MILESTONE B ANALYSIS
DAG CH 3 Figure 27: Weapon System Development Life Cycle
DAG CH 3 Figure 22: Weapon System Development Life Cycle
JTAMS PRE-MILESTONE B ANALYSIS
DAG CH 3 Figure 25: Weapon System Development Life Cycle
Presentation transcript:

Milestone A to Milestone B Requirements Management Activities

Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Analyze the purpose and major activities of the Technology Development phase and the links between those activities Describe the decisions the Milestone Decision Authority (MDA) makes and the items the MDA approves at Milestone B

Milestone A to Milestone B Technology Development Full Rate Prod Decision Review Joint Concepts Capabilities - Based Assessment MS C MS B FCB Strategic Guidance Incremental Development MS A Technology Development Engineering & Manufacturing Development Production & Deployment AoA Materiel Solution Analysis Technology Opportunities & Resources ICD O&S User Needs MDD CDD CPD

Milestone A to Milestone B Requirements Management Activities Purpose: Reduce technology risk Major activity: Competitive prototyping Technology Development A B CDD Draft SRR SFR PDR TRA Requirements Management Activities Develop Final CDD Participate in IPTs and Technical Reviews Program and Milestone Reviews Monitor/provide input Acquisition Strategy Acquisition Program Baseline (APB) Test & Evaluation Master Plan (TEMP) Cost Estimate PPBE Process Technology Readiness Assessment (TRA) Life Cycle Sustainment Plan (LCSP) AoA Update

Preliminary Design Review (PDR) PDR is a technical assessment to ensure that the system under review has a reasonable expectation of being judged operationally effective and suitable. PDRs before Milestone B are mandatory for MDAPs. “A successful PDR will inform requirements trades; improve cost estimation; and identify remaining design, integration, and manufacturing risks. The PDR shall be conducted at the system level and include user representatives and associated certification authorities. The PDR Report shall be provided to the MDA at Milestone B and include recommended requirements trades based upon an assessment of cost, schedule, and performance risk.” (DoDI 5000.02)

Technology Readiness Assessment (TRA) TRA is a formal, systematic, metrics based process that assesses maturity of Critical Technology Elements (CTEs) Conducted by an Independent Review Team Required for all programs to support Milestones B and C For ships, a preliminary assessment is required at program initiation (may be Milestone A) TRA results are included in CDD/CPD Director, Defense Research and Engineering (DDR&E) is required to conduct an independent TRA of MDAPs to support Milestone B Technology Readiness Levels (TRLs) are metrics to assess CTE maturity A technology element is “critical” if the system depends on it to meet operational requirements and the technology element or its application is either new or novel or in an area that poses major technological risk

Technology Maturity Technology Readiness Levels (TRL) Actual system “flight proven” through successful mission operations Actual system completed and “flight qualified” through test and demonstration (Full-Rate Production Decision) System prototype demonstration in a operational environment (Milestone C) System/subsystem model or prototype demonstration in a relevant environment (Milestone B) Component and/or breadboard validation in relevant environment Component and/or breadboard validation in laboratory environment (Milestone A) Analytical and experimental critical function and/or characteristic proof-of-concept Technology concept and/or application formulated Basic principles observed and reported System Test, Launch & Operations System/Subsystem Development Technology Demonstration Technology Development Research to Prove Feasibility Basic Technology Research TRL 9 TRL 8 TRL 7 TRL 6 TRL 5 TRL 4 TRL 3 TRL 2 TRL 1 Public law requires MDAPs be at TRL 6 for Milestone B

The Information Technology (IT) Box Purpose: Describe overall bounds of an IT program to facilitate program initiation and reduce subsequent return trips to the JROC for approval of improved capabilities as the program is executed. Applies to systems where there is no need to develop hardware systems (i.e., commercial-off-the-shelf hardware is used)

The IT Box – Four Major Areas Presents the complete program for JCB and JROC members on one chart Flag-level oversight Chair & Members Total program cost Plan & cost for hardware & system integration Plan & cost for tech refresh per FY KPPs that represent initial level of performance for entire IT program FY funding for software development Total program costs for application and system software development/integration How often new releases will be delivered

Milestone B MDA approves: Program Initiation (for most programs) Entry into Engineering and Manufacturing Development (EMD) Acquisition Strategy APB LRIP quantities Exit criteria for next phase Type of Contract Milestone B Certification ADM Requires Approved CDD* Full Funding in the Future Years Defense Program (FYDP) *If first entering the acquisition process at MS B, JCIDS also requires an ICD

MDA Program Certification for MS B (Required by 10 USC 2366b for MDAPs) MEMORANDUM FOR THE RECORD SUBJECT: Milestone B Program Certification As required by Section 2366b of Title 10, United States Code, (1) I have received a business case analysis for the (name of program) and certify on the basis of the analysis that: (A) the program is affordable when considering the ability of the Department of Defense to accomplish the program's mission using alternative systems; (B) appropriate trade-offs among cost, schedule, and performance objectives have been made to ensure that the program is affordable when considering the per unit cost and the total acquisition cost in the context of the total resources available during the period covered by the future-years defense program submitted during the fiscal year in which the certification is made; (C) reasonable cost and schedule estimates have been developed to execute, with the concurrence of the Director of Cost Assessment and Program Evaluation, the product development and production plan under the program; (D) funding is available to execute the product development and production plan under the program, through the period covered by the future-years defense program submitted during the fiscal year in which the certification is made, consistent with the estimates described in paragraph (C) for the program; and Continued on next chart

MDA Program Certification for MS B, continued (2) I have received the results of the preliminary design review and conducted a formal post-preliminary design review assessment, and certify on the basis of such assessment that the program demonstrates a high likelihood of accomplishing its intended mission; and (3) I further certify that: (A) appropriate market research has been conducted prior to technology development to reduce duplication of existing technology and products; (B) the Department of Defense has completed an analysis of alternatives with respect to the program; (C) the Joint Requirements Oversight Council has accomplished its duties with respect to the program pursuant to section 181(b) of Title 10, including an analysis of the operational requirements for the program; (D) the technology in the program has been demonstrated in a relevant environment, as determined by the Milestone Decision Authority on the basis of an independent review and assessment by the Director of Defense Research and Engineering; and (E) the program complies with all relevant policies, regulations, and directives of the Department of Defense.

Technology Development Phase Linkage: CDD, APB, TEMP & Contract for Engineering and Manufacturing Development (EMD) Milestone A Milestone B Cost Estimate & $$ Competitive Designs & Prototypes DT TEMP COIs, MOEs, MOPs, CTPs Contract KPPs KSAs CDD AoA Update SPECs “design-to” PDR MOEs MOPs APB KPPs KSAs EMD Technology Development Phase 12