Transmission Outage Coordination

Slides:



Advertisements
Similar presentations
11 OASIS Subcommittee - Notification Task Force UPDATE May
Advertisements

© 2009 The Williams Companies, Inc. All rights reserved. ______________ WECC November 12, 2012.
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
PER
FRCC Fall Compliance Workshop October , 2013
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
NV Energy Energy Imbalance Market (EIM) Presentation to ISAS
[ENTITY NAME] [FUNCTION CERTIFYING] Certification Review for [RELATED ENTITIES] [LOCATION] – [DATES OF ON-SITE VISIT] [Presenter Name, Title] Closing Presentation.
GOP and QSE Relationship Jeff Whitmer Manager, Compliance Assessments Talk with Texas RE June 25, 2012.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Transmission Customer Meeting May 28, :00 – 10:00 Lake Natoma Inn 1.
2013 Calendar Year Customer Survey Results
NPRR 365 Change in Resource Outage Approvals from 8 to 45 or 90 Days Woody Rickerson Director Grid Coordination
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
NPRR514, Seasonal Generation Resource Wholesale Market Subcommittee April 12, 2013 Amanda Frazier.
ISO Comparison – CAISO Alex Lee (ERCOT)
Energy Imbalance Market Presented at: The Governor’s Utah Energy Development Summit 2015 Caitlin Liotiris Energy Strategies Power Through Ideas.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Transmission Customer Forum Operating Agreement Update Cheryl Johnson 9/21/06.
How could the Tampere Convention on the Provision of Telecommunication Resources for Disaster Mitigation and Relief Operations facilitate operations?
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com MOD GENERATOR TESTING REQUIREMENTS RESOURCE PLANNERS LeeAnne Uhler, Regulatory.
Model load frequency Discussion John Adams January 5, 2010 Nodal Advisory Task Force.
Outages. We have not been able to consolidate our outage postings to one OASIS site as planned We are working to address posting accuracy and outage path.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
FRCC Voice Communications OBJECTIVES FRCC Regional Voice Communications Procedure – Review the New FRCC Handbook Document Review Voice Comm. Requirements.
Path Operator Implementation Task Force Vic Howell, Vice Chair Report to OC March 22, 2016.
Fraud Procedures Tips for Mitigation Fraud Case Process.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR.
Bert Peters Chair, Path Operator Task Force
Northwest University International Student Services OPT & Employment Workshop February 13th, 2017.
Protocol Revision Subcommittee
NERC Lessons Learned Summary
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
PLWG Review 6.9 and the Interconnection process
Path Operator Implementation Task Force
Western Electricity Coordinating Council
Bereavement Best Practice.
Pseudo-tie business procedure
Community Aids Reporting System (CARS): Federal Reporting Requirements
David W. Hutchison, SC December 7, 2017
Solar Eclipse Overview August 2017
Pacific Power Seismic Preparedness Update
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
[ENTITY NAME] [FUNCTION CERTIFYING] Certification
Rates & Regulatory Updates
“TOP-010-1: Data Quality, Analysis Quality, and Alarm Process Monitor”
[ENTITY NAME] [FUNCTION CERTIFYING] Certification Review
Jason Ausmus, Jason Smith and Akshay Shivaram Peak Operations Planning
How to Access and Use Famis
Coordinate Operations Standard
After-the-Fact Workgroup Update Sheryl Welch
Larry Bugh ECAR Standard Drafting Team Chair June 1, 2005
Validus Program Updates
Program Design Addendum Process
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
RC Certification Timelines
County Wide Safety Program
Bert Peters Chair, Path Operator Task Force
WIAB WECC Interchange Authority Backup
Public Safety Power Shutoff (PSPS)
Pseudo-tie business procedure
CR-GR-HSE-302 Management of change
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
SPP West Shadow Operations
Presentation transcript:

Transmission Outage Coordination

Transmission Outages Outage Coordination Group Outage Timelines Outage Requestors COMPASS Reliability Assessment Notifications

Outage Department Part of PacifiCorp Transmission and Balancing Authority real time operations group Part of the Reliability Entity for the PacifiCorp BAA footprint Responsible for coordinating the reliability assessment of outages within the PacifiCorp BAA footprint and with adjacent BAA’s and the Peak RC Facilitates communication of outages, reliability path de- rates, and scheduling path de-rates as requested by any entities and as appropriate Operates week days, and is supported by real time operations during other hours

Outage Timelines Certain lines identified in the Northwest Power Pool planned outage coordination process require scheduling 45 days prior to the start of the Outage Month 10 working days for lines and equipment 150 kV and above 5 working days for lines and equipment 34.5 kV to 150 kV 3 working days for distribution outages These are minimums and we encourage scheduling outages as early as possible Unplanned/Emergency outages are entered and communicated as soon as practical

Outage Requestors Transmission Operators (including but not limited to Pacific Power and Rocky Mountain Power) Balancing Authority Areas Generator Operators Others working in proximity to energized equipment

COMPASS Coordinated Outage Management, Planning And Scheduling System Used to create, post and communicate outages Identifies which equipment and what type of outage is occurring Can be used to identify transmission or scheduling limitations associated with the outage Can be used to identify potential mitigations or additional notes pertaining to an outage Can be set up to auto-notify via e-mail specific persons for specific equipment outages

Reliability Assessment Each outage request is considered by outage coordinators, accounting for the time of the outage and any other outages scheduled at that time, as the outage requests are received Requestors are contacted by outage coordination for follow up questions as appropriate Transmission and scheduling limitations associated with the outage are identified prior to posting As necessary, further studies or coordination with other departments or companies is performed For outages that present an elevated level of reliability risk, the requestor is contacted to discuss shortening, moving the outage or doing work on nights/weekends, etc.

Reliability Assessment (continued) Outages are posted as soon as practical to allow field and operations personnel, Transmission Services departments, and others as much time as possible to prepare for or comment on the outage Further assessments are carried out on month ahead, week ahead, day ahead, and a real time basis. A new assessment of an outage or combination of overlapping outages can be initiated by any party at any time

Outage Notifications COMPASS has the ability to associate any piece of equipment with any e-mail recipient. Once a request is made to associate an e-mail list with a piece of equipment, that party shall be contacted for all future outages as soon as they are posted. This feature can not be used for Market affiliates, but is available to Customer Account Managers In addition to specific requests, notification to the PEAK RC, CAISO, affected TOP’s, GOP’s and BAA’s are made upon all outage postings or updates COMPASS can submit outage information including generic notes sections or specific TTC information to Transmission Service providers per their request so they can post on their OASIS sites

Questions?