PMD Layout Unit Module Super Module Converter + Support Plate Total channels Preshower+Veto = 221,184 8 Supermodules in 2 planes 48 Nos. Total Unit module.

Slides:



Advertisements
Similar presentations
Status of PMD DCS. PMD Layout Unit Module Super Module Converter + Support Plate Total channels Preshower+Veto = 221,184 8 Supermodules in 2 planes 48.
Advertisements

ALICE DCS, Heidelberg 8 Sept G. De Cataldo, CERN CH and INFN Bari;A. Franco INFN Bari 1 Updating on the HV control systems in ALICE The DELPHI HV,
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
DCS workshop 13-14/6/2005G. De Cataldo, CERN-CH and INFN bari1 Common FSM’s updates An exercise to design the standard FSMs for the DCS, the HV and the.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Power Supplies Monitoring and control.
Alarms and interlocks handling in the FSM environment Hypernet 1.The standardization of the FSM state diagram; 2.The FSM error states and their recovering.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
Chamber PCB s, FEB s, Cooling, HV/LV Distribution 1)PCB designs-track widths, track to track distances … 2) Double sided and Multi layer, modular approach.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
MDT PS DCS for ATLAS Eleni Mountricha
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
Performance Tests and Control for the TRD-HV A. Markouizos, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE DCS Workshop CERN.
1 LV Power Supplies L.Jirden* u Detector solutions u Contracts u Tests u Outstanding issues *Presented by André Augustinus.
15/12/10FV 1 Common DCS hardware. General ideas Centralized system: o Common computers. Detector dedicated computers (with detector participation) only.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Responsibilities & Planning DCS WS L.Jirdén.
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
TPC Prototype III TPC module anode HV edge LV module analog digital Cool sensor Gas sensor Shift Expert DCS Ch Skirt.
DCS workshop July 2007 Overview Installed detectors Installed detectors FMD3 commissioning FMD3 commissioning FSM Hierarchy FSM Hierarchy LV+HV FSMs LV+HV.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
Bruno Belbute, October 2006 Presentation Rehearsal for the Follow-up meeting of the Protocol between AdI and CERN.
21/6/2004 Colmar, DCS Work. G. De Cataldo Cern-CH&INFN Ba,I; A. Franco INFN BA,I 1 The candidate STANDARD diagram for the HV FSM in ALICE TO WHAT AND WHY.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Running SPD OUTLINE VFE and CB overview Mapping CB panel: -Regulator board tab: how to switch ON/OFF the VFEs -Control tab: how to mask VFE -Test tab:
Controls EN-ICE FSM for dummies (…w/ all my respects) 15 th Jan 09.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
Muon Piquet Training V.0 W Baldini, E.Furfaro, O. Maev June 11-th 2015.
André Augustinus 16 September 2002 Muon tracker URD summary or, what we understand from the URD.
24th. February, 2003Supriya Das : Junior’s Day, STAR Collaboration Meeting, BNL1 The STAR Photon Multiplicity Detector Supriya Das, VECC Kolkata For The.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
ARCHITECTURE. PRR November x 32 PADs Up to 26 or 3 x 17 MANU BOARD. PATCH BUS Translator Board. FEE DETECTOR Up to 100 PATCH BUS per detector. MANU.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
Bedanga MohantyALICE offline meeting, CERN, Oct :3 rd – 7 th 1 Bedanga Mohanty, VECC, Kolkata ALICE PMD alignment issues  Align-able parts  Alignment.
S. K. PalDCS WORKSHOP 17 JUN 2002 FRONT VIEW PMD Layout and Design Two planes: Veto + PreShower Gas detector with hexagonal cells Cell cross section: 0.22.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
MCH(Muon Tracking) DCS Introduction Overview drawing High Voltage - hardware functional diagram Logical Diagrams Summary table of states and commands Commands.
CLAS12 ECAL PCAL DC FTOF... Region 2 DewPnt Region 3 Region 4 Region 1 Mod 1... Mod 2 HV TEMP LV Hierarchy of Slow Controls: Driven by Finite State Machine.
第 三 章 矿物在正交偏光镜下的 均质性、非均质性.
The new SVD Power Supplies o General requirements o Power supplies structure o Tender process o Test system 2/10/2014SVD Power Supplies1 F.Forti, INFN.
Cosmic Ray Tracker and Detector Control System at the GIF++
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
CSC DSS Status Report by Fred B.
Presentation transcript:

PMD Layout Unit Module Super Module Converter + Support Plate Total channels Preshower+Veto = 221,184 8 Supermodules in 2 planes 48 Nos. Total Unit module components Honeycomb (4608 cells) Top, bottom PCBs

PMD DCS SMI Control Unit SMI Device Unit Hardware Device Being done by CERN GWG GAS HV LV PMD DCS Tmon Crate Ctrl

HV System HV CAEN SY1527 From LVPS SMI Control Unit SMI Device Unit Hardware Device PREVETO HVPS UM2448 UM 023

LV SYSTEM LV LVPS CROCUS6 CAEN EASY CAEN 48V CROCUS CROCUS1 +3.3V To SY1527 SMI Control Unit SMI Device Unit Hardware Device PRE VETO UM24 48 UM24 UM 0 23

Tmon ELMB2ELMB1 ELMB Status SMI Control Unit SMI Device Unit Hardware Device Crocus UM 0 UM 48

OFF CONFIGURING CONFIGURED STANDBY PEDESTAL ON RAMP_UP_LORAMP_DOWN_LO RAMP_UP_HIGH RAMP_DOWN_HIGH RAMP_UP_FULL RAMP_DOWN_FULL GO_STANDBY GO_PEDESTAL GO_ON GO_OFF RESET GO_CONFIGURED RESET GO_STANDBY GO_PEDESTAL GO_CONFIGURED_OFF RESET

PMDDCS SMI Control Unit SMI Device Unit Hardware Device PREVETO HVPS UM2448 UM 023 LVPS Tmon HV 3.3 Detector oriented hierarchy CrateCtrl

Next SLIDE A proposed detector oriented hierarchy For PMD