35kV Assessment SWEDE 2007 May 10, 2007.

Slides:



Advertisements
Similar presentations
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Advertisements

Sistan & Balouchestan Electric Power Distribution Company
© Southwest Electrical Distribution Exchange (SWEDE) May 2, 2008 Materials and Equipment John Macek Application Director, S&C Electric.
Building A Smarter Grid Through Distribution Automation DOE Projects OE & OE April 2013 Copyright © 2012 Consolidated Edison Company of New.
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
Lecture 26 Distribution Systems Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
Feeder Maintenance Program. The purpose of the Cooperative is to provide safe, reliable, low-cost energy services in fiscally responsible partnership.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
IMPACTS OF LARGE DISTRIBUTED GENERATORS ON CENTERPOINT ENERGY’S DISTRIBUTION SYSTEM 1 Presented by Ed Briggs, P.E. Manager of Electric Distribution Planning.
© ABB Group June 10, 2015 | Slide 1 1MRS A self healing power system for the accurate fault location and zone concept T&D Smart Grids Europe 2012.
CITY OF LAKE WORTH, FLORIDA UTILITIES DEPARTMENT A Look at our Electric Utility A Plan For The Future.
Metropolitan Planning Council Roundtable Discussion November 17, 2011 ComEd J. Tyler Anthony Senior Vice President, Distribution Operations.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
APPA Engineering and Operations Technical Conference Atlanta, Georgia April 13-18, 2007 “Nailing the Basics” Earns Princeton, IL RP3 Diamond Award.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
Preliminary Studies of the Electric Power Distribution for CLIC
ELG4125 Transmission and Distribution Systems
SWEDE - April 26 th, Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator Applications.
Distribution Automation: Fault Detection, Isolation, and Restoration
SDG&E Electric Reliability Reporting CPUC Workshops May 26-27, 2015.
SWEDE Tulsa May 8 th, 2009 Dennis Keilbarth Overhead Distribution Arc Flash at PSO.
Module 5, Unit A Vocabulary Review Game. 2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt.
SWER New Zealand & Australian Experience
Frankfurt (Germany), 6-9 June 2011 ROSA – PT – S3 – 0249 EDP DISTRIBUTION AUTOMATION (r)EVOLUTION.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Planning and Analysis Tools to Evaluate Distribution Automation Implementation and Benefits Anil Pahwa Kansas State University Power Systems Conference.
1 Distribution System Expansion Planning Using a GA-Based Algorithm Shiqiong Tong, Yiming Mao, Karen Miu Center for Electric Power Engineer Drexel University.
© ABB PTMV - 1, ABB Overhead Distribution Systems.
Assumption University Thailand EE4503 Electrical Systems Design Main Circuit 1.
2. Terms and definitions1 # Voltage Sags and Interruptions.
SWEDE 2014 Remote Monitoring of Faults – Frank Daniel (Oncor)
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Frankfurt (Germany), 6-9 June 2011 CELLI – IT – Main Session 2 – Paper 700 Extending Switching Reclosing Time to Reduce Interruptions in Distribution Networks.
Dr. W. H. Wellssow, © i d s GmbH EttlingenMai 2003 CIRED Round Table 5 Fault Statistics in Distribution Networks Dr. W.H. Wellssow IDS GmbH Ettlingen,
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
Jesus A. Guerra, P.E. Distribution System Reliability CenterPoint Energy SWEDE 2011.
Distribution Systems-General
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Bywater Reliability Update Gary Huntley Entergy New Orleans, Inc. Regional Manager Entergy New Orleans, Inc. July 28, 2010.
ECE 498HZ: Power Distribution System Analysis
PG&E’s Distribution Resources Planning READ AND DELETE For best results with this template, use PowerPoint 2003 Planning the “Networked Grid“ Integrated.
Distribution systems basic techniques and radial networks.
Interconnected Generation Preliminary Engineering Work Related to Fees.
Development of CAD concept model of package transformer substation (PTS) Aleksandra Seledkova Perm National Research Polytechnic University.
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
Protection of Power Systems
Project Costs 2016 Transmission & Distribution Benchmarking
Sub Station.
Utility Needs and Smart Grid for Major Storm Events
SUB-STATIONS.
Overhead Distribution Systems
Advanced Fuse-Saving Techniques
Power Generation and Distribution
Transmission and Distribution Loss Study
Oliver SCHROEDEL, Michael SCHWAN, Sven KOEPPE, Robert ROSENBERGER
Distributed Generation (DG) Modeling Criteria
Protective Relaying Conference
Distribution Circuit Automation Scheme Design
Distribution network reliability optimisation modelling and the development of appropriate network performance targets and improvement strategies Theo.
CURRENT LIMITING FUSES FOR OVERHEAD TRANSFORMERS
ECE 476 POWER SYSTEM ANALYSIS
Puerto Rico Electric System Challenges Ahead
Presentation transcript:

35kV Assessment SWEDE 2007 May 10, 2007

Mission/Objective Review original decisions to utilize 35kV Review Oren E. Park Report from 1971 Understand the comparison of 13 & 35kV Performance, reliability & costs Review Navigant Findings from 2003 Review CPS Planning Guidelines for 35kV Formulate an approach going forward to maximize performance and reliability to 35kV system Align with EDS strategy

Team Members Les Barrow – Planning & Reliability Engineering Albert Lara – Reliability Planning Dwain Duke – Reliability Planning Rick Maldonado – Substation & Dist Planning Sam Le - Substation & Distribution Planning George Tamez – Overhead Engineering Blake Williams – Underground Engineering Joe Rodriguez – Substation Design

Major Items Past system costs & expansion Reliability Linear capacity optimization Automation Backbone philosophy Progress and performance measurement

Parks’ Assertions Reduce number of substations Reduce number & size of feeders Reduced transmission right-of-way needs Lower reliability with higher voltage “Standards of safety and reliability enter into the comparison, and they will temper to some degree the attractiveness of the higher voltage resulting from the economic gain.”

Substation Statistics Voltage # of Substations # of Transformers # of Circuits 2004 Loads Avg. # of Customers 35kV 25 40 119 1851 MW 2401 13kV 51 105 379 1980 MW 817 Ratio 35/13 0.49 0.38 0.31 0.93 2.94

Estimated Costs Substation & Transmission savings 25 substations at $2M = $50M 10.6 mile/substation at $500k = $132.5M Distribution added costs Overhead: 2435 miles at $6,500/mi = $15.8M Underground: 2435 mi at $12,000/mi = $29.2M Net $50M + $132.5M - $45M = $137.5M

Reliability Statistics Voltage Average SAIDI SAIFI Total # of Operations Avg. # of Interruptions 35kV 0.2669 .01673 752 6.32 13kV .0442 .00253 965 2.55 Ratio 35/13 6.0385 6.6130 0.78 2.48

Reliability Drivers Number of Customers Protection Philosophy Construction Standards Others – length, equipment, procurement, conductor size, construction to engineering feedback

Number of Customers 35kV feeder approximately three times number of customers as 13kV 35kV feeder approx. twice 13kV length No significant protection differences 3 times customer * 2 times length = 6 times Reliability Indices concur

Protection Philosophy Breaker, fuses & sectionalizers Limited use of reclosers Large fuses for URD loops Limited breaker reclosing

Construction Standards BIL of structures Grounding Topology Stress due to faults

Conceptual Feeder

Conceptual Performance Example Number of Interruptions Customer Hours Interrupted Feeder SAIDI SAIFI CAIDI 1 3 2400 3.0 1.0 2 6 14400 6.0 10800 4.5 4 9600 4.0

Capacity, Automation, Backbone Linear capacity optimization - relationships of all physical components need to be reviewed for optimum utilization Automation - utilize intelligent reclosers, switches & schemes Backbone philosophy – required foundation Progress and performance measurement

Recommendations Distribution Planning to review customer number/circuit Protection changes Aggressive recloser installation project Smaller fuses on smaller URD loops Review all sectionalizers Concurs with multi-shot approach Construction design standards review Investigation of linear capacity optimization by Distribution Planning Implement backbone philosophy with automation Progress and performance measurement by Reliability Planning