CM at Risk v. Design-Bid-Build

Slides:



Advertisements
Similar presentations
Construction Project Coordination Presented by: Philip H
Advertisements

Construction Contracting
Delivering Successful Facility Projects It Starts and Ends with You!
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Program Controls Systems & Processes Board of Trustees Workshop October 11, 2005.
Lessons Learned: CM at Risk & Design Build
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Building Success Stories: A Survey of Construction Delivery Methods PRESENTED BY: BLAKE G. POWELL.
Multi-Stage Bidding.
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
Capital Improvement Program Overview November 3, 2011.
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Marcy Mealy Procurement Specialist CDBG Program
Delivery of Multiple Small Projects—Now! Task Order Construction Agreements.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
DESIGN PART 1 SELECTING THE DESIGNER AGREEMENT FOR PROFESSIONAL SERVICES.
ESTIMATING By Laith Jacob.
THE EVALUATION PROCESS FOR RFP’S: THE DIFFERENCE BETWEEN THE ARCHITECTURAL RFP AND A GENERAL SERVICE RFP TREENA BRADLEY, ROOSEVELT ELEMENTARY SCHOOL DISTRICT.
The Importance of the Qualifications Based Selection (QBS) Process
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
CMR Contract Documents Jon Walden Manager of Contracts & Compliance Ohio School Facilities Commission Lisa Conomy Construction Counsel The Ohio State University.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
January 24, …a delivery method which entails a commitment by the Construction Manager to deliver the project within a Guaranteed Maximum Price (GMP).
1 Procurement. 2 Overview Every municipality should keep procurement records that allow an auditor or other interested party to track the specific nature.
January 31, …a delivery method in which the construction team is known as the design-builder…and is responsible for taking a concept developed by.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
January 14, The NAMC LCDP Will Provide A Proven Contractor Capacity Building Program For The Public and Private Sector.
Business Inclusion and Development Program Overview Business Development and Procurement Services Budget, Finance and Audit Committee Monday October 5,
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
Request for Proposals Notification When to use?. When to use….. Federal funds to be used as reimbursement for PE, R/W, CE. 100% local funds for PE and/or.
Coordination of Right of Way on Design-Build Contracts By- Richard Bennett State Right of Way Director Virginia DOT.
© 2011 Orbach Huff & Suarez 1 Lease Leaseback Project Delivery Method Kimble Cook Orbach, Huff & Suarez.
Richland Creek Water Supply Program Contract for WTP and Pump Stations CMAR Services and Program Update Paulding County, Georgia Board of Commission Work.
Public Works Department Presentation to: Consolidation of Services Study Commission, Purchasing Subcommittee September 19, 2005.
Construction Management At Risk Process
Capital Facilities Program Update San Rafael City Schools 10 May 2016.
Introduction to Procurement for Public Housing Authorities Procurement Planning: Choosing a Contracting Method Unit 2.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Designer selection procedures. Legal framework Article 3D. Procurement of Architectural, Engineering, Surveying Services, and Construction Manager at.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Ensuring Good Quality PPP Projects Martin Darcy Regional Workshop.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
Overview of MSBA Building Process and Project Timeline
2016 SAME Small Business Conference - Atlanta
Lease-Leaseback Project Delivery Method
Overview of MSBA Building Process and Project Timeline
PRESENTER Jose A. Galan ▸ Division Director, Internal Services Department, Real Estate Development Division ▸ Current Chair of the Florida Council For.
Light Rail Transit Project
Procurement Management
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
QBS: The Process Selecting a Design Firm
Community Bond Committee
Enterprise Content Management Owners Representative Contract Approval
Consultant Selection Training
Request for Proposal & Proposal
Architectural Services RFQ
Design-Bid-Build (Ch. 149) vs. Construction Manager at Risk (Ch. 149A)
PROJECT DELIVERY METHODS
Procurement.
Procurement Planning Mani Ram Gelal
OCPS CCNA SELECTION COMMITTEE TRAINING
Presentation transcript:

CM at Risk v. Design-Bid-Build Alternate delivery methods for Fuller-Farley School Project December 1, 2016

Overview Design-Bid-Build CM at Risk OIG Approval Process for CMR CMR Selection Process Advantages/Disadvantages

Design Bid Build Program by Designer & District Program & Schematic Design (+) approved by MSBA Project Budget Fixed with MSBA Design Development with Dual Estimates Construction Documents with Dual Estimates 60% 90% Pre-qualify GCs Pre-qualify Filed Sub- Bidders 18 Categories of Work Consider E-Bidding Advertise Receive Filed Sub-Bids Receive GC Bids Award Contract Temporary Facilities Relocation of existing students & programs 18 – 24 Month Construction Schedule Possible Multi-phase Project Commissioning by MSBA MEP CxA Enclosure CxA Training Close-out

CM at Risk Approval by OIG Required Select CMR Phase 1 – Qualifications Phase 2 – Fee Proposal Probably on-board at beginning of Design Development Phase Support for Designer & District During Design and Bidding Scheduling Estimating Constructability Review Phasing Plans Temporary Facilities Trade Contractor Pre-Qualification (same categories as Filed Sub-Bidders) Approval of subcontractor pool by District is required Cost Pre-construction fee ~$150 - $200K General Conditions ~6-7% Contingency ~2% Fee ~2.25% - 2.75%

OIG Approval Submit Application to OIG 60-day Approval Period District has authorization from governing body to contract with CMR District has capacity, plan & procedures in place to procure and manage CMR Retained services of qualified OPM Procedures to ensure fairness in competition, evaluation and reporting throughout procurement process Building project >$5,000,000 District has determined CMR is appropriate and states in writing reasons for determination 60-day Approval Period 130 Applications to Date $6.4 Billion project costs

CMR Selection Process 2-Phase Selection Probable CMRs Qualifications Phase Issue RFQ Receive SOQs from respondents Rate respondents by Prequalification Committee Qualified Not-Qualified Proposal Phase Issue RFP to Qualified CMR firms Evaluate Proposals on multiple factors Cost Team Approach Rate CMR firms on composite ratings – including fee proposal Negotiate contract with highest ranked firm Agostini Bond Brothers Consigli Dimeo Gilbane W.T. Rich Shawmut Design & Construction Skanska Turner

Sophisticated OPM required Advantages of CMR Disadvantages of CMR Constructability review during design Document review during design Front-end specification support Realistic phasing analysis Estimate support during design Existing condition Open book accounting Trade contractor prequalification support Participation in subcontractor procurement MBE/WBE compliance Designer/District partnership with contactor OIG approval required Sophisticated OPM required District participation requires District effort

MSBA Process from Feasibility Study to Project Funding Agreement Schematic Design

Participants School Building Committee Owner’s Project Manager (OPM) Architect MSBA

Module 3 Feasibility Study 3.1 Preliminary Design Program (POP) 3.2 MSBA review (approval) of Preliminary Design program 3.3 Preferred Schematic Report (PSR) 3.4 MSBA staff and Board Approval

Module 4 Schematic Design DESE approval Construction delivery method Schematic Design document Total project budget Form Project Scope and Budget review with MSBA MSBA board approval

Module 5 Project Funding Town approval of Project Funding agreement