WG1 status report to TP#15 Group Name: oneM2M TP15

Slides:



Advertisements
Similar presentations
TC SCP REQ STATUS REPORT TO PLENARY #63 Davide Pratone, Chairman, Telecom Italia SCP(14)
Advertisements

Release 2: Work Items best practices Group Name: TP15 Source: Scarrone Enrico, Telecom Italia Meeting Date:
WG 3 Progress Report at TP12 Group Name: oneM2M TP12 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
Methods Of Work Ad hoc Report TP#11 Source: Enrico Scarrone, Telecom Italia, Meeting Date:
WG5 - MAS Progress Report at TP #16 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG5 - MAS Progress Report at TP #12 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG5 - MAS Progress Report at TP #17 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
TST WG Progress Report at TP 15 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Miami, USA Agenda.
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
TST WG Progress Report at TP 18 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18,
TST WG Progress Report at TP 17 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Sapporo, Japan Agenda.
Requirements Overview Group Name: Technical Plenary (TP19) Source: Shelby Kiewel, iconectiv, Meeting Date: Agenda Item:
Status of Active New Work Items Group Name: WPM Source: Karen Hughes, ETSI Updated:
Status of Active New Work Items Group Name: WPM Source: Karen Hughes, ETSI Meeting Date:
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
WG-2 - ARC TP #16 Status Report Group Name: oneM2M TP #16 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
HGI activities transfer to oneM2M Group Name: MAS Source: Patricia MARTIGNE (Orange), Deutsche Telekom, Telecom Italia Meeting Date: Agenda.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP9 Source: Convenor WPM Joachim Koss, Gemalto M2M,
WG 2 Progress Report at TP #8 Group Name: oneM2M TP #8 Source: WG2 leadership Meeting Date: /13 Agenda Item: WG Reports.
WG1 status report to TP#17 Group Name: oneM2M TP17 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#17, Item 10.3,
WG5 - MAS Progress Report at TP #9 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: to
WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
WG 3 Progress Report at TP15 Group Name: oneM2M TP15 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
TP WG1 status report to TP#16 Group Name: oneM2M TP16 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#16,
1 HGI MESSAGE TO ONEM2M TECHNICAL PLENARY HANS WERNER BITZER, DEUTSCHE TELEKOM VICE CHAIR, HGI ONEM2M TP#19, SOPHIA ANTIPOLS, FRANCE.
TST WG Progress Report at TP 19 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP19, Item.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
Discussion for the next oneM2M release Group Name: TP Source: JaeSeung Song, KETI, Jaeho Kim, KETI,
MoW&M&P Report Group Name: TP18 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
ARC ordinary F2F meeting Seoul, June 2013 WG2 MEETING NOTES.
WG-2 - ARC TP #18 Status Report Group Name: oneM2M TP #18 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date:
TST WG Progress Report at TP #20 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP20, Item.
WG5 – MAS#19 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG1 status report to TP#21 Group Name: oneM2M TP21 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#21, Item 10.4,
WG5 – MAS#21 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
Status of Active Work Items Level of Completeness Group Name: WPM Source: Roland Hechwartner, WPM Convenor Updated:
Introduction to oneM2M OMA - oneM2M Meeting, San Diego, Jan. 19th 2016
WG 3 Progress Report at TP10 Group Name: oneM2M TP10 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
WG2 - ARC TP #20 Status Report Group Name: oneM2M TP #20 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
WG2 PRO Status Report at TP19 Group Name: oneM2M TP19 Source: Peter Niblett, IBM Meeting Date: to Agenda Item: TP19, Item 10.3, Reports.
WG1 status report to TP#20 Group Name: oneM2M TP20 Source: Joerg Swetina (NEC) Meeting Date: to Agenda Item: TP#19, Item 10.4, Reports.
TST WG Status Report to TP #21 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP21, Item.
TP WG1 - REQ Progress Report at TP #14 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chair (Joerg Swetina, NEC), Secretary Changho RYOO,
WG5 – MAS#22 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Tim Carey(Alcatel-Lucent, WG5 Vice Chair) Meeting Date:
Status of Active Work Items Summary Group Name: TP Source: Roland Hechwartner, WPM Convenor Updated: source: TP_WPM R08-New_Work_Item_Status_Report.
WPM ad-hoc group report TP#20 Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
WG1 - REQ Progress Report at TP #11 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chairs Meeting Date: to Agenda Item: TP#11,
Methods of Work Report Group Name: TP#10 Source: Enrico Scarrone, Telecom Italia, Meeting.
WG5 – MAS#23 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG5 – MAS#24 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Report of oneM2M MARCOM subcommittee
Welcome to oneM2M! Group Name: oneM2M Welcome Session Source: Mitch Tseng, ARC WG Vice Chair, Roland Hechwartner, TP Vice Chair & oneM2M Secretariat.
Overview of oneM2M Home Appliances Information Model
Status of Active Work Items Level of Completeness
Welcome to oneM2M! Group Name: Newbies Session Source: Roland Hechwartner, TP Vice Chair & Karen Hughes, ETSI Meeting Date:
WG2 - ARC TP#29 Status Report
WPM ad-hoc group report TP#24
Release Timeline Discussion R2 and beyond
WPM ad-hoc group report TP#25
WG5 – MAS#27 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Report of oneM2M MARCOM subcommittee
Status of Active New Work Items
ETSI EE status of activities in 2013
ETSI Standardization Activities on M2M Communications
ETSI Standardization Activities on M2M Communications
Current standardization activities – oneM2m
NWM New Working Methods
Presentation transcript:

WG1 status report to TP#15 Group Name: oneM2M TP15 Source: Joerg Swetina (NEC), Shelby Kiewel (iconectiv) Meeting Date: 2015-01-19 to 2015-01-23 Agenda Item: TP#15, Item 10, Reports from Working Groups

Issues for DECISION in TP CR Packs for Technical Specifations TS-0002 (Requirements) Rel-1 Rapporteur: Yu Qi see TP-2015-0591-CR_pack_for_TS-0002_(Requirements) Progress at 100% For TP.15 approval => implemented in TS-0002 V.1.0.0 TS-0011 (Definitions) Rel-1 Rapporteur: Roland Hechwartner see TP-2015-0592-CR_pack_for_TS-0011_(Definitions) Progress at 100% For TP.15 approval => implemented in TS-0011 V.1.2.0 Release 1 TSs: TS-0002 V 1.0.0 see TP-2015-0598 TS-0011 V 1.2.0 see TP-2015-0600 WG1 to check via email CR implementation till next Friday (30. 1.)

Action Items for alignment in TP none

_all definitions _ from TSs should be moved into TS-0011 Items for INFORMATION WG1 agreed on future handling of oneM2M definitions: At latest at the end of a release _all definitions _ from TSs should be moved into TS-0011

Highlights Baselines available TS-0002 (Requirements) V 1.0.0 => Note: V.2.0.0 will be created when the first CR for Rel-2 is agreed TS-0011 (Definitions) V 1.2.0 => Note: V.2.0.0 will be created when the first CR for Rel-2 is agreed TR-0001 (Use Cases Collection) V 1.4.0 => Note: V 1.5.0 will include agreed changes from this meeting (1 week) TR-0013 (Home Domain Enablement) V 0.2.1 => Note: V 0.3.0 will include agreed changes from this meeting (1 week) TR-0005 (Roles and Focus Areas) V 0.0.5 (no progress at this meeting) WG1 has finalized all outstanding work on Rel-1 Requirements coverage in rel-1 and external comments Non-normative Rel-2 work is ongoing (Home Domain) New work on industrial use cases proposed.

Issues for INFORMATION to TP TP-2015-0591-CR_pack_for_TS-0002_(Requirements)  Short doc nb  Shortname  Source REQ-2015- 0003R03 CR_to_TS-0002_Security_Requirements Francois Ennesser (Gemalto) REQ-2015- 0506R02 CR_to_TS- 0002_Agreed_part_of_Overall_System_Requirements Joerg Swetina (NEC) REQ vice chair REQ-2015- 0001R03 CR_to_TS-0002_Overall_System_Requirements REQ-2015- 0004R02 CR_to_TS- 0002_Charging_Operational_CommRequest_NonFunc tional_Requirements REQ-2015- 0002R02 CR_to_TS- 0002_Management_Abstraction_Semantics_Requirem ents REQ-2015- 0514R01 CR_to_TS-0002_OSR_041 Enrico Scarrone, Telecom Italia REQ-2015- 0511R01 TS-0002_cleanup Yu Qi (Rapporteur)

Issues for INFORMATION to TP TP-2015-0592-CR_pack_for_TS-0011_(Definitions)  Short doc nb  Shortname  Source REQ-2015- 0507R03 TS-0011 CR Security Definitions Qualcomm Inc. (TIA), Alcatel Lucent REQ-2015- 0512 CR to TS-0011 editorial cleanup incl ETSI EditHelp comments Roland Hechwartner, Deutsche Telekom

Issues for INFORMATION to TP Agreed contributions to TR-0013 (Home Domain enablement)  Short doc nb  Shortname  Source REQ-2015- 0502R01 Moving Field Domain Triggering use case Haier REQ-2015- 0505R01 Use case for automatically switching between remote access and local access 5REQ-2014- 0471R06 Use case for Conflict Management in Home Automation System KETI REQ-2014- 0470R06 Use case for Device Caching in Home Domain REQ-2014- 0488R03 Use Case of Message Profile in Home Domain LG Electronics Inviting people to work on new use cases for TR-0013 Extracted from HGI, Raising the Floor Consortium, IETF Authentication and Authorization for Constrained Environments (ACE) Working Group, BBF REQ-2015-0508 Potential Use Cases for Home Domain KETI

Issues for INFORMATION to TP Agreed contributions to TR-0001 (use cases) This contribution moves a use case to TR-0013 REQ-2015- 0503 Reference of Field Domain Triggering use case Haier

Next Steps Work on Home Domain enablement, Discuss new WI on industry support

Next Meetings / Calls Conference Calls Face to Face 2 conference calls till TP16 requested Face to Face TP16 Sophia-Antipolis 23-27 March 2015 Expect at least 6-7 regular timeslots TP17 Sapporo, Japan 18 – 22 May 2015