FRIB PLC Testing & Verification Process

Slides:



Advertisements
Similar presentations
SOFTWARE TESTING. Software Testing Principles Types of software tests Test planning Test Development Test Execution and Reporting Test tools and Methods.
Advertisements

Ch-11 Project Execution and Termination. System Testing This involves two different phases with two different outputs First phase is system test planning.
Safety Software QA at BNL’s Collider-Accelerator Department (C-AD) Accelerator Safety Workshop E. Lessard Collider-Accelerator Department August 12-14,
EQUIPMENT VALIDATION.
MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
The Project AH Computing. Functional Requirements  What the product must do!  Examples attractive welcome screen all options available as clickable.
Hot Checkout System for Accelerator Operations at JLab Ken Baggett (Team Leader) Theo Larrieu Ron Lauzé Randy Michaud Ryan Slominski Paul Vasilauskis.
How To Apply Quality Management
Commercial Database Applications Testing. Test Plan Testing Strategy Testing Planning Testing Design (covered in other modules) Unit Testing (covered.
Product Quality, Testing, Reviews and Standards
LSST Workshop Bremerton, WA August, LSST Workshop Bremerton, WA August, 2015 Camera Protection System Martin Nordby Chief Mechanical Engineer LSST.
IT Service Delivery And Support Week Eleven – Auditing Application Control IT Auditing and Cyber Security Spring 2014 Instructor: Liang Yao (MBA MS CIA.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Fundamentals of Information Systems, Third Edition1 Systems Design Answers the question “How will the information system do what it must do to solve a.
Turbine Crane CRANES TURBINE NEA39. Turbine Crane PLANT STATUS! PV Daily Status Report.
Design Documentation Clint Kehres, Brian Krouse, Jenn Shafner.
Joel Gerber Zachary Reaver Kurt Schilling.  Provides physical proof of development  Maintains product design knowledge base  Meets government and corporate.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
1 Enzo Carrone 1 NEH Safety Systems NEH ARR 2009 NEH Safety Systems Enzo Carrone June 30 th, 2009.
Product development Engineering & Regulatory Raj Agrawal InnAccel.
60kW Thermosiphon control system
Oman College of Management and Technology Course – MM Topic 7 Production and Distribution of Multimedia Titles CS/MIS Department.
InstantGMP MD/PRO Electronic Device History File Software for Manufacturing Medical Devices in compliance with 21 CFR Part 820 (Quality System Regulation)
A2 Agreement Trial ICT November Key Points from Moderation  Majority of centres applied the assessment criteria successfully  Tasks selected and.
Advantech IPC-6608BP Desktop/ Wall mount Chassis -1 ISA, 4/ 6 PCI, 1 PCIMG, 1 PCI/ISA slot -Advantech PCA-6194VG Core 2 Duo SBC Board -Intel Core2 Duo.
Non-Tenure Track (NTT) Appointment Process (Preparer Edition) Version 1.0 Presented by the Office of Organizational Research and Data Management School.
Lesson 1 PLC BASICS. PLC Definition  Programmable Logic Controllers are industrial computers that control machine and other applications.  PLC have.
Lesson 1.C PLC PROGRAMMING.
Principles of Information Systems Eighth Edition
Accelerator Readiness Review October 31, 2006
PREPARED BY G.VIJAYA KUMAR ASST.PROFESSOR
How To Apply Quality Management
System Design, Implementation and Review
Raechel Huebner Ruthanne Sherer
8.3 Control Quality The process of monitoring and recording results of executing quality activities to assess performance and recommend necessary change.
Accelerator Operations Department Readiness (Part 2)
Instructions for Submitting MIPPA 2017 State Plans
Facility for Rare Isotope Beam (FRIB) PLC Control Systems Introduction
Evaluation of Suppliers of Critical Consumables, Supplies and Services Section February 2016.
Southeastern Louisiana University
The Programmable Logic Controller
Overview of the PLC.
IDEAL CLINIC PROGRAMME
Software and System Delivery
0v1.
HAPS Controls Glen White ATF2 Software Review Workshop, LAL, June 2008
Session III Architecture of PLC
Test Administration & The TA Sites.
Introduction to Internal Audits
CHAPTER 2 Testing Throughout the Software Life Cycle
Applied Software Implementation & Testing
Programmable Logic Controllers (PLCs) An Overview.
PLC Hardware Components.
Engineering Processes
Division of Air AirCom DARM’s New Compliance and Enforcement Database and Field Inspection Tool.
You’ve got the decoder installed, now to program it.
PLC Hardware Components.
Testing Plan and Status
ACOE347 – Data Acquisition and Automation Systems
PSS verification and validation
Configuration Management
PSS0 Configuration Management,
Overview Activities from additional UP disciplines are needed to bring a system into being Implementation Testing Deployment Configuration and change management.
DOE Review of the LCLS Project October 2006
Machine Protection PLC Based System Verification and Validation Plan
PSS verification and validation
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Presentation transcript:

FRIB PLC Testing & Verification Process Kelly Davidson Controls Department Deputy Manager

FRIB Controls Testing and Verification Process Bench Test/ ACL Hardware for major procurements tested with Bench Test Acceptance Criterial List (ACL) Testing Once PLC installation is complete, we perform several levels of testing Installation tests Interface tests Component/Connection including Interlock Tests Integration/Commissioning Tests include test with beam – Controls role is just support Test records are filed with a number and title in our Document Control Center (DCC) Installation Test Testing the PLC installation using traveler procedure/checklist system Interface Test Test our outputs and inputs at the point of interface to hardware devices Verify hardware devices have expected interface, i.e. Closed/open contact, 4-20 mA, etc Component/Connection Test Connect to device hardware and verify I/O interface is working as expected, i.e. On/Off Control, readbacks, interlocks, limit status Verify channels in control screens work as expected Test Interlocks per Interlock and Alarm Document Device Readiness Review (DRR) reviews that testing and documentation completed, as well as safety and operational concerns before final integrated testing is performed Installation/ Interface Test Component/ Connection Test DRR Fully Integrated Testing K. Davidson, ICALEPCS 2017 Workshop: PLC Based Control Systems, FRIB Testing & Verification

Acceptance Testing Plans Developed for PLC Hardware New hardware tested against ACL verification plan The Standard Operating Procedure is referenced by ACL plan and details how the ACL inspections are to be carried out The results of the tests are recorded in a separate tab of the ACL verification report document The results summary for the lot of modules is entered into the ACL Results section by the verifier and filed into our DCC system K. Davidson, ICALEPCS 2017 Workshop: PLC Based Control Systems, FRIB Testing & Verification

FRIB Controls Installation/Interface Tests Installation testing uses online traveler system or spreadsheet Combination of procedure and checklist Tracks user & history K. Davidson, ICALEPCS 2017 Workshop: PLC Based Control Systems, FRIB Testing & Verification

FRIB Controls Component/Connection Tests[1] Component/Connection testing is tracked in spreadsheet and filed in DCC Testing verified installation/interface wiring and control connections through control screens Tracked by each hardwired I/O point and filed in Document Control Center K. Davidson, ICALEPCS 2017 Workshop: PLC Based Control Systems, FRIB Testing & Verification

FRIB Controls Component/Connection Tests[2] Checklists for component/connection test filed in DCC Alarms and Interlocks documented and signed off in DCC Interlocks tested per area’s Alarm and Interlocks document and results filed in Document Control Center K. Davidson, ICALEPCS 2017 Workshop: PLC Based Control Systems, FRIB Testing & Verification

Summary Testing completed at each level ensures quality installation and reduces engineers time troubleshooting at the final level Beamline performs as intended on first commissioning/integration tests – reducing calls for support K. Davidson, ICALEPCS 2017 Workshop: PLC Based Control Systems, FRIB Testing & Verification

Backup Slides K. Davidson, ICALEPCS 2017 Workshop: PLC Based Control Systems, FRIB Testing & Verification

Quality Assurance - Acceptance Testing Plans Developed for PLC Hardware Acceptance and SOP Test documents developed for PLC components and Interface Modules (IFMs), Allen Bradley Hardware ACL Plan (T31207-VP-000354) FRIB Allen Bradley Hardware Acceptance Standard Operating Procedure (T31207-PR- 000322) Programmable Logic Controller (PLC) Interface Modules Acceptance Criteria Listing (ACL) Plan (T313207-VP-000378) Interface Module Acceptance Standard Operating Procedure (T3107-PR-000338) Acceptance testing is performed once parts are received and documented in a verification report (VR) K. Davidson, ICALEPCS 2017 Workshop: PLC Based Control Systems, FRIB Testing & Verification