Stéphane Gabourin TE/MPE-EP 21 st March 2014 BIS & SMP changes for Run 2 SPS – Extractions – Injections – LHC.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
1 Commissioning ABT Equipment in the LHC Jan Uythoven ABT TCM 13/01/2015.
LHC Machine Interlocks & Beam Operation LHC Machine Interlocks & Beam Operation ARW2011Bruno PUCCIO (CERN) 13 th April v0 Thanks to Benjamin Todd.
Safe Machine Parameters General Machine Timing Cross-Check Safe Machine Parameters General Machine Timing Cross-Check 9 th May v3.
CERN Machine Protection – A Future Safety System? Introduction 1 SMP = Safe Machine Parameters System which receives accelerator.
The Architecture, Design and Realisation of the LHC Beam Interlock System Machine Protection Review – 12 th April 2005.
LHC Beam Dump System Technical Audit Trigger Synchronisation Unit.
January 2006Beam dump and injection inhibits / J.Wenninger1 Beam Dump and Injection Inhibits J. Wenninger AB-OP & D. Macina TS-LEA LHC experiments signals.
Machine Protection backbone: Upgrades Session 5: Machine Protection and availability 5 th Evian Workshop – 2-4 June 2014 I. Romera Ramírez Acknowledgments:
Daniela Macina (CERN) Workshop on Experimental Conditions and Beam Induced Detector Backgrounds, CERN 3-4 April 2008 Experiments protection from beam failures.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
RF voltage and frequency interlocks A. Butterworth MP review 17/6/2010.
B. Todd et al. 25 th August 2009 Observations Since v1.
The CERN LHC central timing A vertical slice Pablo Alvarez Jean-Claude Bau Stephane Deghaye Ioan Kozsar Julian Lewis Javier Serrano.
“we believe the reason why the first bunch is more intense than the following 3 is that it's on that one that the SPS RF loops are locked” Philippe & Django.
A.Dinius AB/PO/IEE - BIS Audit 18 th September 2006 Beam Interlock System Hardware Implementation.
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
V. Kain AB/OP1Sep 12, 2007 Summary of Discussion on Injection Protection Issues Injection Protection Issues – meeting 22 nd of June V. Kain, A. McPherson,
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
1 LTC Timing AB/CO/HT Central timing hardware layout Telegrams and events Postmortem, XPOC LHC Central Timing API Fill the LHC Use Case Julian Lewis.
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
Stéphane Gabourin TE/MPE-EP MPP – 23 th Oct 2015 CIBDS beam dump triggers due to glitches in BIS loop B1-A diagnosis and mitigation measures.
LMC 27 November 2013 Status of LBDS LS1 activities and plans for 2014 reliability run Jan Uythoven for the many, many people working on the mentioned equipment.
LHC Beam Dumping System Experience from reliability run and Re-commissioning procedures MPP Nicolas Magnin – TE/ABT/EC.
Machine Interlocks Upgrading MPE workshopChristophe MARTIN14 th Dec
Schedule IT General Schedule 9 th, September 09 Today.
LHC Machine Checkout & Dry Runs Strategy Acknowledgements: R.Alemany, R.Giachino M. Albert LHC Beam Operation Workshop June 2014.
Machine Interlocks in the Injectors IEFC workshopBruno PUCCIO (TE/MPE) 22 nd March v0.
BT/BP AB/CO/MI 17 th September 2008 Safe Machine Parameters Status & Update.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
Running scenario 2009/10 Run through components – and then synthesis.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
BCT’s for beam protection L. Søby On behalf of D. Belohrad, L. Jensen and P. Odier 6/12/15Internal workshop ON MPP readiness for MJ beams 1.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
MPP 4 th March - 1v0 CERN MPP CERN MPP SMP Team 3.
B. Todd et al. 19 th August 2009 The Beam Interlock System Thanks to: Machine Protection Panel, R. Schmidt, B. Puccio, M. Zerlauth and many more… 0v2.
1 Commissioning and Operation of the machine protection system L. Ponce Acknowledgements: M. Zerlauth, J. Wenninger, D. Wollmann, V. Chetvertkova, G. Valentino,
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
LBOCM. ZerlauthMarch 06 th 2012 Acknowledgements : B.Todd, C.Martin, I.Romera, E.Carlier, J.Wenninger, C.Zamantzas, S.Redaelli et al. 1v0 MPS Commissioning.
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
Emergency dump update 2. M. Solfaroli – 23/10/2015 Goal 2 GENERAL STRATEGY Force open the BIS loop Generate an internal fault in the LBDS Scrape the beam.
BIS main electronic modules - Oriented Linac4 - Stéphane Gabourin TE/MPE-EP Workshop on Beam Interlock Systems Jan 2015.
BT AB/CO/MI 18 th September 2007 Safe Machine Parameters Chassis.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
The TV Beam Observation system - BTV
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Overview of the Beam Interlock System
Realising the SMP 1. Safe Machine Parameters Overview
Overview of CERN BIS and Communication Hardware
Injectors BLM system: PS Ring installation at EYETS
LINAC4 50 MeV phase BIS STATUS
Jan Uythoven For discussion
ATLAS-AFP interlock validation
J. Uythoven for the MPE-MI & MS Teams
Commissioning and Testing the LHC Beam Interlock System
MPS Commissioning and Status
MPSC Procedures An update
M. Zerlauth, I. Romera 0v1.
Machine Protection System Commissioning plans
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
1v1.
Beam Interlocks for Detectors and Movable Devices
The LHC Beam Interlock System
SPS Injection BIS - Draft requirements
Presentation transcript:

Stéphane Gabourin TE/MPE-EP 21 st March 2014 BIS & SMP changes for Run 2 SPS – Extractions – Injections – LHC

S. Gabourin – 21 st Mar 2014 Outline BIS changes -New CPU MenA20 in VME chassis -New BIS board CIBDS to include in the BIS loop -New User system inputs (Point by Point…) -Miscellaneous Overview of BIS commissioning steps SMP changes -SPS: new input energies -SPS: From CNGS to AWAKE -LHC: New squeezing factor -LHC: Change Setup-Beam Flag equations Overview of SMP commissioning steps

S. Gabourin – 21 st Mar 2014 LHC BIC in UA63 CIBM BIS changes – New CPU MenA20 -LynxOS VME power PC replaced by Linux MenA20 -VME interface to modify in the BIS boards -Affect boards in operation (SPS to LHC): -7 CIBG (generator) -58 CIBM (manager) VME chassis with new MenA20

S. Gabourin – 21 st Mar 2014 BIS changes – New BIS board CIBDS -New CIBDS (Dumping System): -Included in the BIS Permit Loop -Direct link from BIS to Retriggering line -Triggers delayed/asynchronous dumps -2 VME boards (1 per beam) -Installed in point 6 (UA63 and UA67)

S. Gabourin – 21 st Mar 2014 BIS changes – New User systems SPS Ext 1 Ext 2 Inj 1 Inj 2

S. Gabourin – 21 st Mar 2014 BIS changes – New User systems -New WIC system in all SPS points, on unmaskable inputs -More in BA3 : -Input 8: SPS Eco Mode (maskable) -Input 13: WIC ring line (maskable) -(SPS Interlock Mode Ions finally not added) VME chassis almost full Future merge of the MPS and move the WIC ring line to a non-maskable input In total 8 new inputs in SPS :

S. Gabourin – 21 st Mar 2014 BIS changes – New User systems -Injection 1 : -Input 7: Alice ZDC -Input 10: BETS MSI/TDI Beam 1 -Injection 2 : -Input 10: BETS MSI/TDI Beam 2 In total 3 new inputs in Injectors :

S. Gabourin – 21 st Mar 2014 BIS changes – New User systems -Point 1 : -Input 8: Collimation motor merged with R1 -Point 4 : -New DIDT FBCT -Input 2: Unmaskable -Input 9: Maskable -Input 14: Test -Input 7: WIC disable but conserved -Input 7: LHCF detector disable but conserved In total 8 new inputs in LHC:

S. Gabourin – 21 st Mar 2014 BIS changes – New User systems -Point 5 : -Inputs 8 & 9: Collimation removed -Input 13: CMS Magnet disable but conserved -Point 6 : -Input 6: New CIBDS Beam 1 affects both beams -Input 14: TCDQ Beam 2 affects only Beam 2 -Input 6: New CIBDS Beam 2 affects both beams -Input 14: TCDQ Beam 1 affects only Beam 1

S. Gabourin – 21 st Mar 2014 BIS changes – New User systems -Point 7 : -Input 11: New Crystal Experiment Résumé: -8 new inputs in SPS: 6 un-maskable + 2 maskable -No change in extractions -3 new inputs in Injections: 1 un-maskable + 2 maskable -8 new inputs in LHC: 3 un-maskable + 5 maskable -Plus 3 disable, ready for future use

S. Gabourin – 21 st Mar 2014 BIS changes – Miscellaneous -CIBG Arming: 1 FESA command to arm A and B loops simultaneously to avoid the TSU or the CIBDS to arm only on 1 loop -R2E : BIC relocation (from UJ56 to USC55) -BIC Re-installation in TZ76 (due to works in the alcove) -Spare fiber needed in point 6 -…

S. Gabourin – 21 st Mar 2014 Overview of BIS commissioning -TODO: 1- Update BICs (CPU-CIBG-CIBM-CIBO). In all machines - April to Summer 2- Commission the Users (New tester). In all machines - May to Automn 3- Install CIBDS in BIS loop. In LHC - April -Moreover: -Organize LHC Local BIS loop in Point 6 - April -Measurement campaign of the optic fibres attenuation. In LHC - Summer -Set the disable jumper for the LHC sector test - November. -Other commissioning tests as described in the document MPS aspects of the Beam Interlock System Commissioning. This has to be slightly updated to consider the CIBDS.

S. Gabourin – 21 st Mar 2014 SMP changes – SPS -New redundant energies from BEM in BA1 -Increases the availability (1 oo 4 logic). -Optic fibres already pulled between BA1 and CCR -CNGS energy flag (~400GeV) replaced by AWAKE energy flag (~300GeV)

S. Gabourin – 21 st Mar 2014 SMP changes – LHC Courtesy V. Chetvertkova, 87 th MPP – 07/03/14 -Redefinition of the Setup Beam Flag equations -Nowadays 4 equations (Normal, Relaxed, Very Relaxed, Ions). -Need to redefine how many equations are needed. -Need to redefine the 64 couples (Energy, Intensity) to hardcode in the FPGA for each new equation. -2 additional squeezing factors (Beta*) transmitted via the SMP to the GMT Nowadays 4 Beta* (1 for each IP) used into the calculation of the Energy Flags

S. Gabourin – 21 st Mar 2014 Overview of SMP commissioning -Much simpler than the BIS only 2 crates in the CCR -A document explain already how to parameter the SMP (threshold values, force flags). -This will allow an easy definition of the commissioning tests. -It needs a refresh (only one Setup-Beam Flag equation is described, etc) -The procedure should be defined in a doc MPS aspects of the Safe Machine Parameters Commissioning To be created following the template