LCG Grid Deployment Board, March 2003 Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Status of GridKa for LCG-1 Forschungszentrum Karlsruhe.

Slides:



Advertisements
Similar presentations
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Tier 1/2 Meeting and 47. Session GridKa TAB, March 2006 Forschungszentrum Karlsruhe GmbH.
Advertisements

TAB, 03. March 2006 Bruno Hoeft German LHC – WAN present state – future concept Forschungszentrum Karlsruhe GmbH Institute for Scientific Computing P.O.
EU DataGrid progress Fabrizio Gagliardi EDG Project Leader
S.L.LloydATSE e-Science Visit April 2004Slide 1 GridPP – A UK Computing Grid for Particle Physics GridPP 19 UK Universities, CCLRC (RAL & Daresbury) and.
Tony Doyle - University of Glasgow GridPP EDG - UK Contributions Architecture Testbed-1 Network Monitoring Certificates & Security Storage Element R-GMA.
Partner Logo Tier1/A and Tier2 in GridPP2 John Gordon GridPP6 31 January 2003.
1Oxford eSc – 1 st July03 GridPP2: Application Requirement & Developments Nick Brook University of Bristol ALICE Hardware Projections Applications Programme.
Level 1 Components of the Project. Level 0 Goal or Aim of GridPP. Level 2 Elements of the components. Level 2 Milestones for the elements.
GridKa May 2004 Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Installing dCache into an existing Storage environment at GridKa Forschungszentrum.
Manchester HEP Desktop/ Laptop 30 Desktop running RH Laptop Windows XP & RH Home server AFS using openafs 3 DB servers. Web server AFS Mail Server.
05/07/00LHCb Computing Model Meeting (CERN) LHCb(UK) Computing Status Glenn Patrick Prototype (Tier 1) UK national computing centre Bid to Joint.
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft LCG-POB, , Reinhard Maschuw1 Grid Computing Centre Karlsruhe - GridKa Regional/Tier.
Forschungszentrum Karlsruhe Technik und Umwelt LHCC Meeting Bologna, 15 June Planning a Regional Data and Computing Center in Germany Peter Mickel.
GridKa January 2005 Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Doris Ressmann 1 Mass Storage at GridKa Forschungszentrum Karlsruhe GmbH.
Service Data Challenge Meeting, Karlsruhe, Dec 2, 2004 Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Plans and outlook at GridKa Forschungszentrum.
T0/T1 – Network Meeting Bruno Hoeft T0/T1 – GridKa/CERN Network Forschungszentrum Karlsruhe GmbH Institute for Scientific Computing P.O. Box.
1 Forschungszentrum Karlsruhe in der Helmholtz - Gemeinschaft Pre-GDB, Prague, Apr. 3rd 2007 Holger Marten Holger. Marten at iwr. fzk. de
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Torsten Antoni – LCG Operations Workshop, CERN 02-04/11/04 Global Grid User Support - GGUS -
Forschungszentrum Karlsruhe Technik und Umwelt Regional Data and Computing Centre Germany (RDCCG) RDCCG – Regional Computing and Data Center Germany software.
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Helmut Dres, Institute For Scientific Computing – GDB Meeting Global Grid User Support.
1 Forschungszentrum Karlsruhe in der Helmholtz - Gemeinschaft WLCG Collaboration Workshop, Jan. 24th 2007 Report Tier-1 + associated Tier-2s Andreas Heiss.
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft gridKa Forschungszentrum Karlsruhe GmbH Institute for Scientific Computing P.O.
STEINBUCH CENTRE FOR COMPUTING - SCC KIT – University of the State of Baden-Württemberg and National Laboratory of the Helmholtz Association.
S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's.
German Site Report Rainer Mankel DESY Hamburg HTASC Meeting 13/14-Mar-2003.
12. March 2003Bernd Panzer-Steindel, CERN/IT1 LCG Fabric status
Polish Tier-2 Andrzej Olszewski Institute of Nuclear Physics Kraków, Poland October 2005 – February 2006.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
ScotGrid: a Prototype Tier-2 Centre – Steve Thorn, Edinburgh University SCOTGRID: A PROTOTYPE TIER-2 CENTRE Steve Thorn Authors: A. Earl, P. Clark, S.
April 2001HEPix/HEPNT1 RAL Site Report John Gordon CLRC, UK.
Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration.
Computing for HEP in the Czech Republic Jiří Chudoba Institute of Physics, AS CR, Prague.
12th November 2003LHCb Software Week1 UK Computing Glenn Patrick Rutherford Appleton Laboratory.
2 nd Large Scale Cluster Computing Workshop, FermiLab, October 21-22, 2002 Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft The GridKa Installation.
LCG Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete 1 Service Challenge Phase 4: Piano di attività e impatto sulla.
March 2003 CERN 1 EDG and AliEn in Prague Dagmar Adamova INP Rez near Prague.
Andrew McNabNorthGrid, GridPP8, 23 Sept 2003Slide 1 NorthGrid Status Andrew McNab High Energy Physics University of Manchester.
Service Challenge Meeting - ISGC_2005, 26. Apr Bruno Hoeft 10Gbit between GridKa and openlab (and their obstacles) Forschungszentrum Karlsruhe GmbH.
LHC Computing Review Recommendations John Harvey CERN/EP March 28 th, th LHCb Software Week.
SouthGrid SouthGrid SouthGrid is a distributed Tier 2 centre, one of four setup in the UK as part of the GridPP project. SouthGrid.
Manchester HEP Desktop/ Laptop 30 Desktop running RH Laptop Windows XP & RH OS X Home server AFS using openafs 3 DB servers Kerberos 4 we will move.
RAL Site Report John Gordon IT Department, CLRC/RAL HEPiX Meeting, JLAB, October 2000.
CSCS Status Peter Kunszt Manager Swiss Grid Initiative CHIPP, 21 April, 2006.
GridPP Building a UK Computing Grid for Particle Physics Professor Steve Lloyd, Queen Mary, University of London Chair of the GridPP Collaboration Board.
Tier2 Centre in Prague Jiří Chudoba FZU AV ČR - Institute of Physics of the Academy of Sciences of the Czech Republic.
GGUS at PEB – –- page 1 LCG Klaus-Peter Mickel, GridKa Karlsruhe LCG-PEB-Meeting ( ) The Global Grid User Support Model (Report of GDB.
Tony Doyle - University of Glasgow 8 July 2005Collaboration Board Meeting GridPP Report Tony Doyle.
US ATLAS Tier 1 Facility Rich Baker Brookhaven National Laboratory Review of U.S. LHC Software and Computing Projects Fermi National Laboratory November.
Les Les Robertson LCG Project Leader High Energy Physics using a worldwide computing grid Torino December 2005.
Site Report --- Andrzej Olszewski CYFRONET, Kraków, Poland WLCG GridKa+T2s Workshop.
Tier1 Andrew Sansum GRIDPP 10 June GRIDPP10 June 2004Tier1A2 Production Service for HEP (PPARC) GRIDPP ( ). –“ GridPP will enable testing.
CERN IT Department CH-1211 Genève 23 Switzerland t Frédéric Hemmer IT Department Head - CERN 23 rd August 2010 Status of LHC Computing from.
CDF computing in the GRID framework in Santander
Partner Logo A Tier1 Centre at RAL and more John Gordon eScience Centre CLRC-RAL HEPiX/HEPNT - Catania 19th April 2002.
GUS Web portal page 1 LCG Klaus-Peter Mickel, GridKa Karlsruhe Grid User Support — Web portal Time scale:  :WG5 Draft paper Vers.
IAG – Israel Academic Grid, EGEE and HEP in Israel Prof. David Horn Tel Aviv University.
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 The EU DataGrid Project Three years.
Enabling Grids for E-sciencE INFSO-RI Enabling Grids for E-sciencE Gavin McCance GDB – 6 June 2007 FTS 2.0 deployment and testing.
Dominique Boutigny December 12, 2006 CC-IN2P3 a Tier-1 for W-LCG 1 st Chinese – French Workshop on LHC Physics and associated Grid Computing IHEP - Beijing.
KIT – Universität des Landes Baden-Württemberg und nationales Forschungszentrum in der Helmholtz-Gemeinschaft Steinbuch Centre for Computing
Enabling Grids for E-sciencE INFSO-RI Dr. Rüdiger Berlich Forschungszentrum Karslruhe Introduction to Grid Computing Christopher.
 Prospective Nationale sur les Grilles de Production, Paris, L'état d'avancement des grilles.
Grid activities in Czech Republic Jiri Kosina Institute of Physics of the Academy of Sciences of the Czech Republic
Grid Operations in Germany T1-T2 workshop 2015 Torino, Italy Kilian Schwarz WooJin Park Christopher Jung.
13 January 2004GDB Geneva, Milos Lokajicek Institute of Physics AS CR, Prague LCG regional centre in Prague
ISGC_2005, 27. Apr Bruno Hoeft 10Gbit between GridKa and openlab (and their obstacles) Forschungszentrum Karlsruhe GmbH Institute for Scientific.
The INFN TIER1 Regional Centre
UK Testbed Status Testbed 0 GridPP project Experiments’ tests started
Bernd Panzer-Steindel CERN/IT
Grid Application Programming Environment
Presentation transcript:

LCG Grid Deployment Board, March 2003 Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Status of GridKa for LCG-1 Forschungszentrum Karlsruhe GmbH Hauptabteilung Informations- und Kommunikationstechnik Hermann-von-Helmholtz-Platz 1 D Eggenstein-Leopoldshafen K.-P. Mickel, H. Marten

LCG Grid Deployment Board, March 2003 Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft GridKa Today production environment for BaBar, CDF, D0, Compass test environment for Alice, Atlas, CMS, LHCb All experiments are up and running ! BaBar upgrades to Tier-A in Karlsruhe D0 established Regional Analysis Centre (RAC) in Karlsruhe

LCG Grid Deployment Board, March 2003 Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Latest statistics: LHCb running production GridKa Feb-2003

LCG Grid Deployment Board, March 2003 Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Hardware in Production Environment for HEP dedicated software server for each experiment dedicated Gbit-LAN backbone 360 processors, mixed PIII & PIV (equiv. > 21 kSI95) - OpenPBS; fair share between all experiments dedicated 45 TB disk dedicated 110 TB tape Gbit-test over DFN/Géant with Cern resource distribution acc. to table communicated to GDB

LCG Grid Deployment Board, March 2003 Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Planned Hardware Upgrades LAN backbone to 190 ports, 256 Gbit/s ordered for April/May processors PIV ordered forApril/May + 2x 10 TB disk ordered forApril/May running European call for tenders for + 60 TB disk in 2003July/Oct tape to be purchased on demand hardware upgrades might interfere with LCG-1 implementation

LCG Grid Deployment Board, March 2003 Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft LCG-1 Testbed ~ 10 nodes available for LCG-1 testbed; currently RH 7.2 tests for RH 7.3 under development person for LCG testbed maintenance hired (starts on April 1st) experience from DataGrid & CrossGrid available (2 CrossGrid testbeds in Karlsruhe up and running) German-Grid CA running & widely accepted LCG-1 to be ported to GridKa production environment after operation, stability & security has been demonstrated !

LCG Grid Deployment Board, March 2003 Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft LCG-1 Summary April 30: GridKa TAB is aware of the date Waiting for technical specifications & software prototype