02/24/2004
CONOPS
Major Design Constraints and Considerations No aircraft modification C-130 minimal mission interference C4ISR – Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance Multi-mission flexibility (Counter Drug, Environmental Impact Assessment, Counter Terrorism, HLS, Resource Surveys, Environmental Surveys) GOTS and COTS Ground-to-air deployment (< 2 hours)
Major Design Constraints and Considerations – cont. Upgrade flexibility In-flight deployable Adequate space for various sensor configuration Standardized mounting/ connection of systems Power usage supplied within limits of C-130 Platform Stability
Standardized C-130 Pallet
C-130 Fuselage Operator Station Sensor Platform
Sensor Platform
Sensor Platform
Sensor Platform Sensor Platform Rail System Major Components Linear Actuator (manual and automatic control) Rotational Gear Motor (manual and automatic control) Mechanical Arm/Pod System Proximity Sensors (linear and rotational control)
Sensor Platform Assembly
Securing Sensor Pallet Loading Sensor Pallet Securing Sensor Pallet
Deployment Process Linear Translation (18 inches) - 20 seconds Rotational Movement (237°) - 15 seconds Linear Retraction (12 inches) - 15 seconds Complete Deployment - < 60 seconds
Mechanical Arm and Pod – Incremental Articulation Deployment Process Mechanical Arm and Pod – Incremental Articulation
Leaving Stowed Position Closing Deployed Position - Deployment Process Leaving Stowed Position Closing Deployed Position -
Mechanical Arm and Pod FEA Analysis Restraints set along shaft supports Forces applied simulating drag Material type/thickness selection
Operator Station
Operator Station
Loading Operator Station Operator Station in Cargo-Hold
Operator Station Components 2 computer stations 3 electronic racks Climate control (Fan and vent unit, dehumidifier) Communication panels Power rectification Direct or indirect lighting 2 operator seats, 1 observer seat 2 operator doors Slingable/Stackable box
Powered Operator Station Controls
Operator Station Proposed Capabilities Sensor operation/control Data acquisition/interpretation Data storage Direct ground/ aircraft/ satellite communication Converter for power supply C4ISR – Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance
Operator Station Power Connection Sensor Connection
Power Controller (rack mounted) Operator Station Power Controller (rack mounted)
Sensor Pallet Electrical Layout
C-130 Power Distribution
Close-up: Power Distribution C-130 Power Distribution Close-up: Power Distribution
Sensor Pallet Control
Sensor Pallet Control Pendant
GPS Communication
Aerodynamic Test
Aerodynamic Test Pressure rake test Air Test conducted on 02/04/2004 based on developed test matrix Currently reducing data Will compare data with that of simulation
Year Two
Proposed Possible Tasks Evaluation & Certification – Standardizing the system System Modification – Enhance support capabilities Sealing Cargo Hold – Operate above 10,000 feet
As of 02/24/2004