Proximity Cryogenics P&IDs meeting

Slides:



Advertisements
Similar presentations
LAPD Run 2 Results and Notes Terry Tope
Advertisements

LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
Cryogenic discussion and update 30 October 2014Neutrino platform.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
LAr1-ND Conceptual Design Review of Status June 25 Craig Thorn.
LAr1-ND David Montanari Fermi National Accelerator Laboratory CERN – Feb 16, 2014.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
1 Status of Hydrogen System Development MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov, Tom Bradshaw, Elwyn Baynham, Mike Courthold,
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Mucool cryo-design Christine Darve Fermilab/Beams Division/ Cryogenic Department 8/12/02.
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
LAr1-ND Cryogenics Concept David Montanari Neutrino Cryogenics Requirements Meeting 24 September 2014.
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
4/5/2005FLARE Cryogenics, RLSchmitt1 Argon Refrigeration Supply Purity.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans S. Pordes Argon Purity1Integrated R & D Plan Review.
WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Neutrino Cryogenics Requirements Meeting 25/09/2014 Day 1 review.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
GLA2011 The cryogenic systems of the LHC experiments Johan Bremer on behalf of TE/CRG, ATLAS collaboration and CMS collaboration.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Installation of the T600 at Fermilab CSN2, September 22,
Cryogenics Fabrication Plans & Constraints David Montanari (on behalf of the CERN Neutrino Cryogenic Group) ProtoDUNEs Meeting Feb 23, 2016.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
35ton and LAPD cryostats and future DUNE detector development.
Microboone Cryostat Mike Zuckerbrot Fermilab. Basic Overview of Microboone  Microboone’s 2 Phases of Operation  Phase 1 operations ran from about December.
35 Ton LAr Impurity Distribution Measurements and CFD simulation Erik Voirin – Fermilab – Thermal and Fluids Engineering Group / Engineering.
AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.
Installation of the T600 at Fermilab Fermilab, February 15,
Neutrino Platform Proximity Cryogenics Functional Design M.Chalifour 14/04/2016 M. Chalifour - TE/CRG-CI 2.
ProtoDUNEs Interface documents (NP-02, NP-04) David Montanari (on behalf of Redouan A, Mark A, Johan B, Michel C, Joaquim C, Aurelien D, Kevin H) Apr 14,
WA105 6x6x6 Cryogenics David Montanari / Johan Bremer Sep 21, 2015 Rev. 1.
ProtoDUNE Single Phase (NP-04) P&ID David Montanari (on behalf of Mark A, Johan B, Michel C, Joaquim C, Kevin H) CERN Neutrino Platform General Meeting.
SBND Cryostat Requirements David Montanari, Michael Geynisman, Dimitar Mladenov, Joe Howell 14 October 2015.
Neutrino Platform Proximity Cryogenics 68th EHN1 Cryogenics Integration TE-CRG
Final Design Cryogenic and mechanical configurations
Teleconf ACS – FREIA 28th March 2017
Installation of the T600 at Fermilab
Overview of the Long-Baseline Neutrino Facility Cryogenic System
Magnet cryogenic system update.
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
IT-4189 Supply and installation of a cryogenic distribution system
Proximity Cryogenics P&IDs Meeting
protoDUNE – single-phase Instrumentation - Gas Analyzers
HFM Test Station Main Cryostat
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Cryoplant Installation Scope
M. Chalifour - TE/CRG-CI
SPS cryogenic proximity equipment and SM18 validation
Cryostat design Mechanical design: Thermal screens: Specifications:
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Follow-up of the tests with the copper filter
CRYOGENICS OPERATIONS 2008 Organized by CERN
Low-Radioactivity Argon Transportation and Storage
ESS Target Cryogenic System European Cryogenic Days CERN
Status of Hydrogen System Development
ESS elliptical cryomodule
Schematic diagram of the cryogenic system
Cryogenics – The Basics
Presentation transcript:

Proximity Cryogenics P&IDs meeting Michel CHALIFOUR (on behalf of the CERN Neutrino Cryogenic Group and Mike Zuckerbrot) Neutrino Platform General Bi-weekly Meeting March 3, 2016 SBN-FD/NP01

Process and Instrument Diagram Operation modes Outline Project Requirements Process and Instrument Diagram Operation modes 03.3.16 Michel CHALIFOUR P&IDs Meeting SBN-FD/NP01

Physics Required Parameter Requirements for SBN-FD Cryostat/Cryogenic systems Physics Required Parameter Value LAr purity in cryostat >3 ms electron lifetime (<100 ppt O2 equivalent) Verifiable contamination levels for LAr delivery O2 < 1 ppm, H2O < 1 ppm, N2 < 2 ppm Max Design Over-Pressure 350 mbarg (~5 psig) Operating gas pressure 150 mbar (~2 psig) with +/- 5% (~0.1 psig) Vacuum tightness Localized leaks < 10-8 mbar x liters / s Global leak rate < 10-6 mbar x liters / s Minimum inner dimensions cryostat 3600 mm (Transv) x 19900 mm (Para) x 3900 mm (H) (-0 mm +10mm for all dimensions) Cool-down rate ≈ 2 K/hr (5 days to cool to LAr temperature) TPCs max gradients < 70 K < 50 K (vertically) LAr recirculation rate ≈2 m3/hr/T300 module (one volume / week) Purification Technique Pump down to vacuum and fill with purified LAr LAr flow speeds < 20 cm / sec Minimum depth of liquid argon 3783 mm (From the floor) Maximum static heat leak <10 W/m2 (Sides/Floor) 10 W/m2 (Roof) 03.3.16 Michel CHALIFOUR P&IDs Meeting SBN-FD/NP01

Cryogenic systems Internal Cryogenics (not part of Neutrino Cryogenic group scope): Internal piping. Temperature neasurement (detectors and cold vessel), level measurement, Safety devices (magnetic burst disc) Interface control document needs to be created in-between proximity and internal cryogenics for physical and functional parameters (eg: temperature sensors/quantity and location for operation, Larg and Garg mass flow rate to cool down, interlock on Temperature, etc...) Proximity Cryogenics: Circulate and purify LAr. Achieve and maintain LAr purity. Recondense and purify boil off GAr. Infrastructure/External Cryogenics (not part of Neutrino Cryogenic group scope): Store LAr/LN2. Transport GAr/LAr, GN2/LN2 to Proximity. Vents, analysers. Interface control document needs to be created in-between proximity and external cryogenics for physical and functional parameters (eg:Larg and Garg mass flow rate to cool down and in operation, etc...) In general ICDs need to be created with all the interfaces. Technical Specification/Tender will cover this part only 03.3.16 Michel CHALIFOUR P&IDs Meeting SBN-FD/NP01

Modes of operation Pumping down / Purge Cool down Filling Vacuum pumps (turbo molecular pumps) are connected to the cold vessels and the argon circuit up to the Larg tank, around 2 months is needed of pumping to achieve 10-4mb, then pressurization of the cold vessels @1100mba with GAr (from liquid phase). Cool down The thermal screen is cool down with LN2 circulating pump forced flow, the cold vessels and the detectors are cool down in free convection flow. The pressurization of the cold vessels are regulated with the LArg Tank. In addition at around 180K the filters and the condensers are cool down with the second LN2 circulating pump. Filling Once the cryostats and TPC are cold, LAr is introduced in the cryostat. Normal operations LAr is continuously purified by means of an external LAr pump (1 per module but inter-connected). Boil-off GAr is recondensed outside of the cryostat and purified before being reintroduced as LAr. Emptying At the end of the operations (or if/when maintenance on the tank is needed), the tank is emptied and the LAr removed. 03.3.16 Michel CHALIFOUR P&IDs Meeting SBN-FD/NP01

Current P&IDs 03.3.16 Michel CHALIFOUR P&IDs Meeting SBN-FD/NP01

Larg storage tank, Filling filters, Regeneration system Air compressed supply system Regeneration system Filling filters 03.3.16 Michel CHALIFOUR P&IDs Meeting SBN-FD/NP01

LN2 storage & LN2 distribution LN2 storage tank LN2 phases separator LN2 TS manifolds LN2 circulating pumps 2 running, 1 spare 03.3.16 Michel CHALIFOUR P&IDs Meeting SBN-FD/NP01

Cryostat, filters, condensers Emergency GArg condenser Boil off GArg condensers LArg Circulating filter Boil off GArg filters LArg Circulating pump 03.3.16 Michel CHALIFOUR P&IDs Meeting SBN-FD/NP01

Analysers system 03.3.16 Michel CHALIFOUR P&IDs Meeting SBN-FD/NP01

Operation modes 03.3.16 Michel CHALIFOUR P&IDs Meeting SBN-FD/NP01

Operation Mode PUMP DOWN Vacuum pumps 1-Helium leak test on all flanges and welds not previously tested during installation, 2-when OK opening valves on the filters, 3-when OK pressurization with gas from Tank and closing the Larg pump outlet valve to not by-pass the filter Vacuum pumps 03.3.16 Michel CHALIFOUR P&IDs Meeting SBN-FD/NP01

Operation Mode PUMP DOWN 03.3.16 Michel CHALIFOUR P&IDs Meeting SBN-FD/NP01

Operation Mode COOL DOWN 03.3.16 Michel CHALIFOUR P&IDs Meeting SBN-FD/NP01

Operation Mode COOL DOWN WHEN T>170K 03.3.16 Michel CHALIFOUR P&IDs Meeting SBN-FD/NP01

Operation Mode COOL DOWN WHEN T>170K 03.3.16 Michel CHALIFOUR P&IDs Meeting SBN-FD/NP01

Operation Mode COOL DOWN WHEN T<170K 03.3.16 Michel CHALIFOUR P&IDs Meeting SBN-FD/NP01

Operation Mode COOL DOWN WHEN T<170K & FILLING 03.3.16 Michel CHALIFOUR P&IDs Meeting SBN-FD/NP01

Operation Mode NORMAL OPERATION 03.3.16 Michel CHALIFOUR P&IDs Meeting SBN-FD/NP01

Operation Mode NORMAL OPERATION 03.3.16 Michel CHALIFOUR P&IDs Meeting SBN-FD/NP01

Operation Mode EMPTYING 03.3.16 Michel CHALIFOUR P&IDs Meeting SBN-FD/NP01