AWAKE e-spectro update

Slides:



Advertisements
Similar presentations
General X-Ray System Presentation
Advertisements

Up Small Window Bed Room 6 m 4 m 2 m 1 m 4 m Path Room Hallway 2.6m.
Table Table Table Table Table Table Table Table
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Compressor status AWAKE Technical Board meeting 19 May 2015.
Home & Family Safety. Things to Think About… Would you what to do if a fire started in your home? Have you practiced what to do in case of a fire? Do.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
Drawing and Painting Fun (3rd) - Castles. Far and near -
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
CEDAR Support Structure and PMT Test Peter Sutcliffe 13 th July 2011 CERN via EVO.
LEA 27 August 2008D.LACARRERE1 BUFFER AREA FOR SLIGHTLY RADIOACTIVE COMPONENTS Underground - UXA Zone (protected area) Under DELPHI Barrel UXAUXB.
November 24, 2004 Rolf Nahnhauer1 PROJECT : IceCube Digital Optical Module Production at DESY Zeuthen.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
Update on Laser Beam Lines Christoph Hessler, Mikhail Martyanov, Valentin Fedosseev (CERN laser team)‎ Thanks to M. Battistin, N. Chritin, F. Galleazzi,
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
Compressor status AWAKE Technical Board meeting 19 August 2015.
CAMPESTRE ELEMENTARY P.E..  "All that we ask is try your best"
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
1 J.Byrne  Take sketches of the room showing as much information as possible.  Take lots of measurements at both ground level and floor level.
CEDAR Support Structure Peter Sutcliffe 24 th January 2011.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
Update on Module Mounting on Staves and Stavelets 25/8/11 1.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
Update on the Laser Beam Line
GM sensor tests and installation A.Jeremie K.Artoos, D. Kudryavtsev, Y.Renier, R.Tomas-Garcia, D.Schulte.
Left side Right side Couch Fireplace T.V Christmas Tree Christmas Tree Door Stairs Window Table Act 1 (people)
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
INSTALLATION DETAILS. Installation Details for Code Compliance Must be installed per manufacturer’s instructions Architects can provide construction details.
October 5th 2006Jacques Lefrancois1 Cable Repair ADC side: Problems Miniature connector neededMiniature connector needed Nicomatic or ATI previously used.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 02.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Status of AWAKE Installation and Integration Presented 9/3/2016 at the AWAKE Collaboration Meeting Ans Pardons, for the AWAKE CP4 team.
The reading is 7.38 mm. The reading is 7.72 mm.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Identifying Information: Building Exterior - 1 You observe damage to the frame on this exterior entry door. The door cannot be locked. LEVEL 3.
September 7th, 2017.
8 people per table, 10 tables in room plus head table
Prezentacii.com Welcome to the lesson.
LS1 planning meeting
ATLAS Clean Room Area : Maintenance work (already paid) Cleaning
Preparation for Station Acceptance Test
1. Open any Office 2016 app, such as Word, and create a new document.
SR1 cleanroom extension
EHN1 Neutrino Installation Plans
Status with crucial LSS5 kicker transmission line cables
8 people per table, 10 tables in room plus head table
Fire Fire drill.
Boulevard PROFESSIONAL CENTER
8 people per table, 10 tables in room plus head table
Value of contract: Length of contract: Contract start date:
8 people per table, 10 tables in room plus head table
3rd Grade Word Wall Words
8 people per table, 10 tables in room plus head table
Annette M. Wells Associate Business Administrator January 29, 2015
September 2016 Mrs. Burchette.
Technical Updates Gábor László NSS Lead Instrument Engineer
TELL ME ABOUT KAT UPVC DOORS & WINDOWS ALUMINIUM DOORS & WINDOWS
TEMPO Instrument Update
Presentation transcript:

AWAKE e-spectro update 3/8/2017

Calibration light mask

More on the calibration source Calibration light ordered, should arrive end of August. Control electronics is also ordered (CERN Vmod VME card) V. Clerc is now working on blinders compatible with light source.

Orders & more Supports are now ordered and should arrive mid-September. Ground drilling will be performed in August (possibly with calibration light holder) Optical table (600x900 mm) should arrive mid August Dark room should be installed on week 37 (4-10 Sept) Access door (yellow fence) and wall on the side of fire door should be dismantled in September, the exact date depending on the supports installation. Fire door window: a frame needs to be produced. Details to be discussed with integration team (M. Arnaud)