SUMMARY Of project of deep processing of rice with production capacity 2700 tons / year * *resume has familiarization and approximated character, preserving.

Slides:



Advertisements
Similar presentations
The Global Food Crisis: Creating an Opportunity for Fairer and More Sustainable Food and Agriculture Systems Worldwide Daniel G. De La Torre Ugarte and.
Advertisements

Post-harvest Losses, Technology, and Value Addition Rosa Rolle Senior Agro-Industries and Post- harvest Officer.
Identifying Manure and Compost Export Markets in Montana: to Improve Nutrient Balance on Animal Feeding Operations Background: The current model of animal.
2014 POWER PLANT DYNAMIC BUSINESS MODEL. COMPANY’S PRODUCT 2 Innovation power plant for processing of rice husk PILOT PROJECT STARTED In stanitsa Khlomskaya.
The Business Plan.
POINT CZ, s.r.o. Expansion of production capacities of POINT CZ for offset printing Speakers: Barbora Hrdinova, Lubor Valek Consulting Agency.
Trade and Environmentally Sustainable Economic Growth By Rae Kwon Chung Director, Environment and Sustainable Development Division, UNESCAP Regional Workshop.
INDUSTRIAL BIOTECHNOLOGY: NEW CATALYST FOR RUSSIA AGRI DEVELOPMENT PRELIMINARY INFORMATION NOVEMBER 2011.
Improvement competitiveness of Vietnam’s Agriculture
What kind of demands does a new real estate market growth make on real estate quality in Estonia? Ene Kolbre Angelika Kallakmaa-Kapsta Tallinn University.
Lakeview Energy Jim Galvin CEO Agripreneur Conference Kampala April 21 st /22 nd 2015.
Import, production, sales of agricultural machinery
The Business Plan : Creating and Starting The Venture
Salimov A.H. Chairman of the Association of Food Industry enterprises Investment potential of Food Industry of the Republic of Uzbekistan.
Joint Stock Company “Uzbuildmaterials” Tashkent, May 2012.
HFT 2401 Chapter 11 Property, Equipment and Other Assets.
Threats and opportunities in milk and dairy products trade
Current & Long-term Prospects for US Dairy Trade Cooperative Network Dairy Policy Conference April 3, 2012 Jim Sleper Land O’Lakes, Inc.
Organization and efficiency of implementation of leasing services.
Investment project of ONIKS Joint Stock Company Mr. Abubakir Uskenbaev Deputy Director General.
Organization of the Petroleum Exporting Countries
WHY?SECTORSSUPPORTERS economic and geographic position high profitability investment attractiveness impact to other sectors Tourism Power industry Agricultural.
Project Management DHSS To set up and run a New Technology Unit for the South East Region, to support Local Office Managers during the pilot trials for.
1 Pavlodar Region The region is located in the north of the country. As of January 1, 2012, the area is thousand square kilometers, the region's.
BZUPAGES.COM. Presentation Chapter#7 The Business plan: Creating & Starting the Venture Presented to: Sir Ghulam Abbas.
ENTREPRENEURSHIP Chapter # 07 The Business Plan: Creating and Starting the Venture.
Recycling plant with a sorting line and area for temporary waste storage Project idea: utilization and processing of waste Place of realization: near treatment.
GROSS DOMESTIC PRODUCT. Definition GDP refers to the market value of final goods and services produced in an economy in a given period of time.
Scheme of location of objects of the Dehkanabad plant
Innovation Division. Innovation Its embedded novelty, providing qualitative increase in the efficiency of processes or products demanded by the market.
Land improvement and preparations for programming period Marko Gorban 17 May 2012.
FOOD ENGINEERING DESIGN AND ECONOMICS
DNIPROPETROVS ALFRED NOBEL UNIVERSITY ECONOMY OF ENTERPRISE DEPARTMENT DIRECTIONS FOR IMPROVING STATE REGULATION OF SOCI0-ECONOMIC DEVELOPMENT OF THE TERRITORY.
Credit Administrative Work 1 1. Items to be verified in credit handling (1) Why we need credit consultation? (2) Basic items to be verified in credit consultation.
Economic Geography People earning a living Economic Systems 4 money making activities: primary, secondary, tertiary & quaternary activities. 4 money.
1 Experience from Finland Christian Llull, Ho Chi Minh City, 23rd November 2015 ? Cooperation & Partnership in Wind Project Development.
1 CONFIDENTIAL Acquisition and greenfield investment opportunities in pharmaceutical and medical equipment industries in Kazakhstan November 2015 This.
Substantiative data on the Russian Energy Strategy 2030: expert views on the potential export of energy resources Vladimir Feygin, Vitaly Protasov Institute.
SAARC Seed Bank and Food Bank Yet to be enough to meet food insecurity of mass people
RUSOLIVA LTD. VORONEZH Organizing Production Facilities for Deep Processing of Amaranth.
DIVERSITY IN THE CONVERGENCE PROCESS OF ACCESSION COUNTRIES Urmas Varblane University of Tartu ASIAN CENTURY? – THE GROWING ROLE OF ASIA Urmas Varblane,
«FINANCIER» Brief presentation of the investment project.
Preparation and Analysis of Project Report. What is a Project Report?  A Project Report is a detailed description of the Project  The Project Report.
Construction of plant for production of farm machinery and aggregates
With support from:.
Opportunities for Michigan Agricultural Exports Titus Awokuse Department of Agricultural, Food and Resource Economics Michigan State University Presentation.
SPECTR (LLC) Creation of an enterprise for the collection and processing of Sphagnum (peat) moss Project manager: Vladislav L. Malugin.
The Business Plan : Creating and Starting The Venture
Summary of the project of deep processing of wheat in Kostanay
Iran feed Industry Association presents:
THE RICE PROCESSING PLANT
The Business Plan : Creating and Starting The Venture
SUMMARY Of project of deep processing of red pepper seeds to give water soluble oil with capsaicin 2700 tons capacity / year * *resume has familiarization.
Process of conversion from inputs to outputs
Chapter 5 :The Business Plan (Creating and Starting The) Venture
Starter -The Business Cycle:
Results of the European Chemical Industry 2015
Chapter 5 :The Business Plan (Creating and Starting The) Venture
Korean Experience with Skills for Economic Growth
Construction of Balkhashskaya TPS
Financial Appraisal of Project
PROJECT REPORT PREPARATION
Siberian Agrarian Group.
VIETNAM – AN ATTRACTIVE DESTINATION FOR INVESTORS
Crop Situation and Outlook
TGC-1 9М 2018 IFRS Results 9 November, 2018.
DEVELOPMENT AND MANAGEMENT
Financial Management Budget = financial plan used to forecast needs, allocate resources, and track progress set goals and objectives record what is accomplished.
Economic Growth & Productivity
Presentation transcript:

SUMMARY Of project of deep processing of rice with production capacity 2700 tons / year * *resume has familiarization and approximated character, preserving the order of digits

Deep processing of rice In the context of contemporary realities of raw material crisis, search for stable income opportunities associates with the implementation of projects on the territory of the Republic of Kazakhstan in the sphere of processing of agricultural products. The project represents the purchase of know-how and the complete cycle of production and sale of rice on export, particularly: Rice starch of highest purification Rice starch – standard Rice protein of highest purification. Manufacturing will be located in the southern regions near the rice-growing enterprises. On the basis of the preliminary contract for the purpose of certification of manufactured products to the Asian market, the technological cycle of production will be controlled by the South Korean experts. The product is most in demand in the market of South Korea, China, Japan, Indonesia and India, due to traditional food and mass consumption. The project is fully export oriented on these countries. On the project implementation place is extensive resource base. (For reference: rice production in Kazakhstan in 2016 amounted 502 thousand tons).

Deep processing of rice In addition, the sales market is investigated; there are agreements with potential partners from South Korea, who are willing to sign a contract to purchase of all products for several years ahead, as the demand on environmentally friendly products on the background of the increased quality of consumption in the Asian market is extremely high. Also, the cost of production, produced in Kazakhstan, will be much lower than in South Korea, due to several factors: the availability and optimum cost of use of land resources; low cost of labor resources; a new progressive production technology is protected by patents in South Korea; All of the above will allow to realize the project with payback in the short term and to obtain a high and stable income.

Scope of Business The total area of enterprise 0,7 hectares Built-up area 0,3 hectares The volume of raw material processing (rice, rice chaff is possible) 7200 tons/year Production output: ** Rice starch of highest purification (97-99%) 300 tons/year Rice starch (90-95%) 6000 tons/year Rice protein (90-95%) 350 tons/year - consumption of clean water about 2 t/day - consumption of recuperation water 40 t/day ** depending on the variety of rice

Scope of Business Major capital expenditures: - design and estimate documentation - architectural and construction part - main equipment - supporting equipment - installation supervision and commissioning - coordination and management of the project   Income from the sale of finished products $ US per year: - Rice starch of highest purification (97-99%) 300*7000 = 2 100 000 - Rice starch (90-95%) 6000*2500= 15 000 000 - Rice protein (90-95%) 350*6000= 2 100 000 (Prices FOB Qingdao port) TOTAL 19 200 000$ US

Scope of Business Expenditure part Products Expenditures Total Raw material Additional and unexpected Management Amortization Rice starch (97-99%) 4 320 000 2 160 000 960 000 780 000 8 220 000 Rice starch (90-95%) - Rice protein (90-95%)

Scope of Business Operating profit ( p.6-p.7) 10 980 000$ US Required capital for the execution of this project: – main production area 800 sq.m. – laboratory, weighting room, office 200 sq.m. – buildings for raw material acceptance 600 sq.m. – storage space for finished products 400 sq.m. – supporting equipment 150 sq.m. 1 180 000$ US*** – main complete equipment (+ know-how) 8 000 000$ US – working capital (3 months) 960 000$ US TOTAL 10 140 000$ US Construction time is 10 months Payback period of total investment ( p.10/p.8)+10 months is 23 months. *** for existing buildings, the cost is formed on the basis of TOR (terms of reference).

Thank you for your attention!