Installation of an Instrument on a CERN machine

Slides:



Advertisements
Similar presentations
Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
Advertisements

K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Review on PSB 160 MeV H- Injection Nov 9-10, 2011 Closeout by P. Cruikshank, M. Giovannozzi, D. Johnson, B. Jones, B. Pine, M. Plum, D. Tommasini.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
G5 Beam Line Vacuum System. G5 Beamline Vacuum System Design  Bakeable and Particulate free to Class 100 Clean Room quality Require Clean room QA and.
The Stripping Foil Test Stand in the Linac4 Transfer Line
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
Outcome of HBW damper Review of W. Hofle LIU-SPS HBW damper review LIU SPS Coordination,
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
News and hot topics Impedance meeting 14/04/2014.
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
TE-CRG Activities D. Delikaris, TE-CRG.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
ESS Cryomodule Status Meeting – Elements of Safety | | Christine Darve Elements of Safety Applicable to the ESS 2013 January, 9 th Christine.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Workshop on cryogenic & vacuum sectorisation of the SPL Vacuum Sectorisation Paul Cruikshank, CERN Technology Department (TE) Vacuum Surfaces & Coatings.
Proposal for Microstation Prototype Jaak Lippmaa CERN 2005.
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
Lucio Rossi for the LARP Internal Project Review Via videlink, June 10, 2013.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Vacuum System P. Chiggiato TE-VSC
Crab Cavity Technical Coordination meeting:
Beam-Gas Curtain (BGC) profile monitor tests in the LHC
News and Introduction from CERN June 15th, 2005
CMS Luminosity Status Report
Instrumentation for Accelerators Technologies for the HL-LHC
Brief Status SPS Prototype PSB Prototype Installed in LS1
Equipment simplified model SMR UR safety
LIU Wire Scanner Milestones June 2017
LHC schedule.
Fast Wire Scanner Prototype Mechanical Design
Leak Detection Tutorial Work
on behalf of the RF group
SPS cryogenic proximity equipment and SM18 validation
LHC Experimental Vacuum Systems Status October ‘07
M. Alcaide Leon, Paolo Fessia
CMS November Upgrade Week
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
Renovation of the 45-year old PS magnets
XFEL Vacuum System Commissioning
Upgrade Strategy for the Experimental Vacuum Systems
CLIC-ILC BDS & MDI work.
Beam-Gas Jet profile monitor for the e-lens
Commissioning and Testing the LHC Beam Interlock System
Beam-Gas Curtain (BGC) profile monitor: Project Overview and Status
Mauro Morandin & Antoine Daël
Beam Gas Ionization Monitor (BGI)
Coldex disinstallation
HiRadMat Test Facility
Installation of Photon Beam Transport to FEH
Project management Ray Veness.
ThomX – Commissioning Meeting – 25/01/2018
Outsourcing for the BGC
Presentation transcript:

Installation of an Instrument on a CERN machine Ray VENESS

Context of the Cockcroft-CERN collaboration Our collaboration includes the design and production of a second gas- jet monitor by Cockcroft/Liverpool for installation in the LHC, with the following milestones: “Design report for a final gas-jet for the LHC” : Report, June 2018 “Full prototype adapted for testing in the LHC” : Hardware, June 2019 This date is consistent with an installation in the next long machine shutdown at CERN (LS2), which will be from early 2019, with LHC access upto summer 2020

Specific issues for integration in the LHC Fully-baked UHV vacuum system Design for (default 250 C) bakeout for all components on the beam vacuum ’Failure tolerant’ gas injection system – don’t vent the LHC with 10 bar N2/Ne! Pumping simulations to estimate the gas load on adjacent (cryogenic and/or RT) systems LHC beam impedance Design to avoid ‘cavity-like’ or ‘antenna-like’ structures that can cause local heating or contribute to beam instabilities Integration Space constraints: longitudinally, transversely, in service tunnels Cabling routes are long and need advance planning Access and environment Access to the tunnel is limited to shutdowns and short technical stops Interventions in the beam vacuum are more difficult and require ~2 weeks for bakeout Radiation damage and single-event failure to be considered for tunnel equipment

Recent example: Beam-Gas Vertex (BGV)

Proposed strategy Start now for any interface issues Integration, cabling, safety and operational scenarios Reserve Space Reservation and Engineering Change Request Start discussions with impedance and vacuum teams Phased approach to installation Phase I : Pull cables, create new vacuum sector (2 valves and associated vacuum instrumentation) Phase II : Install specific BGC beam vacuum chambers, with additional valves where necessary Phase III : Add gas injection and optical systems Phase IV : Commissioning and operations