Smart Grid ad hoc Meeting Information - January 2010

Slides:



Advertisements
Similar presentations
Doc.: IEEE r0 Submission September 2009 Bruce Kraemer, MarvellSlide 1 Wireless Characterization for NIST PAP#2 Date: Authors:
Advertisements

Doc.: IEEE r2 Submission November 2009 Bruce Kraemer, MarvellSlide 1 Wireless Characterization for NIST PAP#2 Date: Authors:
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC Closing Report– January 2012 Date: 19 January 2012 Discussion topics.
Doc.: IEEE r0 SubmissionSlide 1 Smart Grid SC– March 2012 Date: 15 March 2012 Discussion topics during March Waikoloa Session NameCompanyAddressPhone .
Doc.: IEEE /0174r0 Submission January 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /0213r2 Submission March 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /0373r0 Submission March 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): Smart Grid Standardization Activities TIA TR-45.5 Input Smart.
PAR Comment Responses Date: Authors: November 2016
VHT SG Report to EC Date: Authors: November 2008 April 2007
Supplementary Plenary Information - July 2010
VHTL6 task group work plan proposal (VHTL < 6 GHz)
Smart Grid ad hoc Meeting Information - February 2010
Proposed basis for PAR discussion
Smart Grid ad hoc Meeting Information - February 2010
2111 NE 25th Ave, Hillsboro OR 97124, USA
Proposed response to 3GPP ED request
Vertical Applications TAG
Smart Grid ad hoc Meeting Information - January 2010
Below 6GHz 11vht PAR scope and purpose discussion
Below 6GHz 11vht PAR scope and purpose discussion
Smart Grid ad hoc Meeting Information - January 2010
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Preliminary Proposal for FHSS PHY for k]
Some propositions to progress towards the PAR definition
Wireless Characterization for NIST PAP#2
2111 NE 25th Ave, Hillsboro OR 97124, USA
General ad hoc- LB115- Comment Resolutions – Jan 08
Below 6GHz 11vht PAR scope and purpose discussion
Supplementary Plenary Information - July 2010
Some propositions to progress towards the PAR definition
Smart Grid SC– January – NIST PAP2 Name Company Address Phone
Submission Title: Link Budget for m
General ad hoc- LB115- Comment Resolutions – Jan 08
Project Management Process Groups
Energy STAR ad hoc Closing Report - January 2010
Smart Grid ad hoc Closing Report – May 2011
doc.: IEEE yy/xxxxr0 Date:
doc.: IEEE yy/xxxxr0 Date:
January 19 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4g-SUN Closing Report for Beijing May 2010.
January 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Technical Requirement sub-group report]
IMT-Advanced Closing Report
Smart Grid Closing Report – November 2010
Smart Grid Teleconferences – Jan-Mar 2011
February 19 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4g-SUN Closing Report for Vancouver, March.
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Intended IG Objectives] Date Submitted:
WG Concepts - Mar 12 ‘08 Date: 2008-Mar-12 Authors: Name Company
<month year> doc.: IEEE < e> January 2012
Wireless Characterization for NIST PAP#2
Smart Grid ad hoc Closing Report - March 2010
<month year> <doc.: IEEE doc> January 2013
<month year> <doc.: IEEE doc> January 2013
April 19 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4g-SUN Closing Report for Montreal, May 2009.
Smart Grid SC–Closing Report- September 2011
Smart Grid ad hoc Closing Report - May 2010
Smart Grid ad hoc – July – SGIP 2 - NIST PAP2 3- ITU Liaison
doc.: IEEE <doc#>
Smart Grid Update – January 2011
Supplementary Plenary Information - March 2010
Supplementary Plenary Information - May 2010
March 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Harmonization of The 15.4g Mandatory Data.
GEN ad hoc Summary - Sep 14 ‘07
Some propositions to progress towards the PAR definition
doc.: IEEE <doc#>
Smart Grid ad hoc Closing Report – January 2011
TGn Meeting Report - June 02 ‘09
Smart Grid ad hoc-Closing Report - July 2010
Plenary Information - September 2009
<month year> doc.: IEEE < e> January 2012
Wireless Characterization for NIST PAP#2
Proposed basis for PAR discussion
Presentation transcript:

Smart Grid ad hoc Meeting Information - January 2010 doc.: IEEE 802.11-10/0091r3 January 2010 Smart Grid ad hoc Meeting Information - January 2010 Date: 2010-1-17 Authors: Name Company Address Phone email 5488 Marvell Lane, Santa Clara, CA, 95054 +1 (321) 427-4098 Bruce Kraemer Marvell bkraemer@ marvell .com Abstract: Information on Smart Grid of interest to WG11 – January 2010 Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

Agenda High Level Questions National SmartGrid Perspective January 2010 Agenda High Level Questions National SmartGrid Perspective EPRI View What has previously transpired? NIST PAP#2 What is happening over the next two months Longer term goals, events, project plans. Observations/Assumptions/Conclusions/Discussion Steps 802.11 needs to take to fit into the Smart Grid plan Bruce Kraemer, Marvell

High Level Questions What is happening in Smart Grid arena? January 2010 High Level Questions What is happening in Smart Grid arena? Is 802.11 properly positioning its existing and pending standards and amendments for acceptance in SG? Participation in key Smart Grid activities Are there any identifiable additions or changes that should be considered to make 802.11 more useful in SG domains? Bruce Kraemer, Marvell

Observation/Assumption/Conclusion #1 January 2010 Observation/Assumption/Conclusion #1 Dozens of organizations are involved but our focus is primarily on: NIST SGIP http://collaborate.nist.gov/twiki-sggrid/bin/view/SmartGrid/PriorityActionPlans IEEE P2030 Discussion: Other 802 groups such as 802.15, 802.20, 802.16, 802.1, 802.3 Bruce Kraemer, Marvell

January 2010 Observation #2 There is a substantial amount of material already created by NIST and other long term SmartGrid participants that describe Application Domains and Use Cases. There is no need for 802.11 to duplicate this work. There is a need to make these data flow models more complete/quantitative . Task 1 of NIST PAP#2 intends to supply this information. Discussion: Bruce Kraemer, Marvell

January 2010 AMI Use Case Report to NIST on Smart Grid Interoperability Roadmap Source: Report to NIST on Smart Grid Interoperability Roadmap http://www.nist.gov/smartgrid/Report%20to%20NISTlAugust10%20(2).pdf Bruce Kraemer, Marvell

NIST Roadmap Description of a Domain January 2010 NIST Roadmap Description of a Domain Source: Report to NIST on Smart Grid Interoperability Roadmap http://www.nist.gov/smartgrid/Report%20to%20NISTlAugust10%20(2).pdf Bruce Kraemer, Marvell

Other examples of Requirements January 2010 Other examples of Requirements Example #1 - description of need for Home Area Network http://osgug.ucaiug.org/sgsystems/openhan/HAN%20Requirements/OpenHAN%20Specification%20Dec.ppt Bruce Kraemer, Marvell

Observation #3 The NIST PAP#2 Tasks deserve considerable attention January 2010 Observation #3 The NIST PAP#2 Tasks deserve considerable attention Discussion: Bruce Kraemer, Marvell

NIST PAP Overview (1) January 2010 Priority Action Plans (PAPs) Described PAPs arise from the analysis of the applicability of Standards to the Use Cases of the Smart Grid. PAPs include identified experts in relative SDOs, known as the PAP Working Group Management Team. Specifically, a PAP addresses either: A gap where a standard or standard extension is needed: The need for meter image-download requirements is an example of a non-existing standard needed to fill an identified gap. An overlap where two complementary standards address some information that is in common but different for the same scope of an Application: An example of this is metering information where CIM, 61850, ANSI C12.19, SEP 1&2 all have non-equivalent methods of representing revenue meter readings. PAPs should only be created when the SGIP determines there is a need for interoperability coordination on some urgent issue. The PAPs themselves are executed within the scope of the SDOs and Users Groups that sign up for tasks that implement the plans. The duty of the SGIP is to facilitate this process, ensure that all PAP materials are publicly available in real time on the TWiki (that is, not entirely within the domain of the SDOs which prevents all but membership access), and provides guidance when the participants in the PAP are at odds or unsure of its goals. Bruce Kraemer, Marvell

January 2010 NIST PAP Overview (2) It will often be the case that the SDOs that are executing the PAP tasks (as part of the PAP Working Group Execution Team) diverge from the original intent of the PAP. This is due to their natural, and correct, orientation towards their own specific goals and needs. The PAPs arise from the broader stakeholder involvement in the Smart Grid problem space and such has identified goals that come from this broader scope. In these cases, the parties are brought together under the auspices of the SGIP and an attempt to resolve the differences is pursued. The possibility could arise where this is not sufficient to move the PAP forward. In this case the PAP WG or the SGIP can: Revise the PAP to accommodate the concerns of the implementers, or, Can redistribute the tasks of the PAP to organizations more in line with the needs of the scope of the PAP. Rescind the PAP judging that it is no longer in the interest of the SGIP to pursue. Bruce Kraemer, Marvell

NIST PAP2 Wireless Communications for the Smart Grid (6.1.5) January 2010 NIST PAP2 Wireless Communications for the Smart Grid (6.1.5) http://collaborate.nist.gov/twiki-sggrid/bin/view/SmartGrid/PAP02Wireless Abstract: This work area investigates the strengths, weaknesses, capabilities, and constraints of existing and emerging standards-based physical media for wireless communications. The approach is to work with the appropriate standard development organizations (SDOs) to determine the characteristics of each technology for Smart Grid application areas and types. Results are used to assess the appropriateness of wireless communications technologies for meeting Smart Grid applications. Bruce Kraemer, Marvell

NIST PAP#2 Description: January 2010 NIST PAP#2 Description: Review existing documentation and ongoing work to assess the capabilities and weaknesses of wireless technologies operating in both licensed and unlicensed bands and to develop guidelines on their use for different Smart Grid application requirements. Bruce Kraemer, Marvell

January 2010 NIST PAP#2 Objectives: Identify requirements for use of wireless technologies for the Smart Grid. Identify guidelines for effectively, safely, and securely employing wireless technologies for the Smart Grid. Identify approaches to define the strengths and weaknesses of candidate wireless technologies to assist Smart Grid design decisions. Analyze co-channel interference issues and develop coexistence guidelines for operation in unlicensed bands. Identify key issues to be addressed in wireless assessments and development for the Smart Grid. Bruce Kraemer, Marvell

January 2010 NIST PAP#2 Why: Wireless technologies are one of many types of media that could meet many Smart Grid requirements by enabling access where other media are too costly or otherwise not workable. However, different types of wireless technologies also have different availability, time-sensitivity, and security characteristics that may constrain what applications they are suitable for. Therefore, different wireless technologies must be used with knowledge of their varying capabilities and weaknesses in all plausible conditions of operation. This work provides objective information on the appropriateness of use. Bruce Kraemer, Marvell

January 2010 NIST PAP#2 Where: Wireless can be used in field environments across the Smart Grid including generation plants, transmission systems, substations, distribution systems, and customer premises communications. The choice of wireless or non-wireless, as well as type of wireless must be made with knowledge of the appropriate use of the technology. Bruce Kraemer, Marvell

NIST PAP#2 – Next Meeting January 2010 NIST PAP#2 – Next Meeting PAP 2 session at OpenSG Users Group, San Fransisco, February 4, 2010: A face-to-face meeting will take place on February 4th, 2010, starting at 8am until 3:00pm. This meeting is collocated with the OpenSG User Group meetings in San Fransisco during the week of February 1, 2010. Information about registration and the hotel venue can be found at: http://osgug.ucaiug.org/sf2010/default.aspx Bruce Kraemer, Marvell

January 2010 NIST PAP#2 Tasks Task 1: Segment the smart grid and wireless environments into a minimal set of categories for which individual wireless requirements can be identified. Task 2: Develop Terminology and definitions. Task 3: Compile & communicate use cases and develop requirements for all smart grid domains in terms that all parties can understand Bruce Kraemer, Marvell

January 2010 NIST PAP#2 Tasks Task 4: Compile and communicate a list of capabilities, performance metrics, etc. in a way that all parties can understand. - Not quantifying any standard, just defining the set of metrics. Task 5: Create an inventory of wireless standards and their associated characteristics (defined in previous task) for the environments identified in task 1. Task 6:Perform the mapping and conduct an evaluation of the wireless technologies based on the criteria and metrics developed in task 4. Bruce Kraemer, Marvell

NIST PAP#2 -Network Information January 2010 NIST PAP#2 -Network Information Both IP and wireless communications priority action plans include as a first task the development of network requirements for Smart Grid applications. Identifying these requirements is key in order to develop guidelines for the use of IP and wireless communications in the context of the Smart Grid. Bruce Kraemer, Marvell

NIST PAP#2 Functional Requirements January 2010 NIST PAP#2 Functional Requirements http://collaborate.nist.gov/twiki-sggrid/pub/SmartGrid/PAP01InternetProfile/SG_Communications_funct-reqs_v1-draft.xls Bruce Kraemer, Marvell

NIST PAP#2 – Task 5 Guidance January 2010 NIST PAP#2 – Task 5 Guidance Task 5 calls for the collection of an inventory of wireless technologies, based on the parameters and metrics developed in Task 4, to be filled by each SDO. The purpose of the row entries in the wireless capability matrix NIST_PAP2-_Wireless_Characteristics-IEEE802-v_02.xls developed in Task 4 is to allow high level assessment of the suitability of particular wireless standard based technologies for use in various applications and domains of the Smart Grid. Since many of the parameters in the matrix have dependencies on each other, e.g. data throughput, range and mobility, the matrix should be filled out by providing a consistent set of parameter values, rather then best case values for each parameter. By a “consistent set” we mean that one picks some “operating point” for the technology and provides parameter values (for those that depend on operating point) that are consistent. For example, maximum data rate will not be delivered at maximum range. A column entry is expected to provide values for the error rate, range, throughput, mobility and other interrelated parameters consistent with the chosen operating point. It would be appropriate to complete more than one column for an individual technology to display the results for more than one operating point. Bruce Kraemer, Marvell

January 2010 NIST PAP#2 – Task 5 so far Bruce Kraemer, Marvell

January 2010 Observation #4 The Matrix rows were adequate for collecting information from SDOs. Discussion: The rows do/do not require further modification. Bruce Kraemer, Marvell

Observation #5 The operating points used were chosen by the SDOs. January 2010 Observation #5 The operating points used were chosen by the SDOs. This was adequate for collecting first response information. Discussion: The operating point should be “standardized” to allow useful comparisons. Bruce Kraemer, Marvell

January 2010 Observation #6 Within WG11, reporting on Smart Grid activities in an ad hoc forum once time block per session is adequate. Discussion: Bruce Kraemer, Marvell

Plans for Thursday One more session Thursday am1 January doc.: IEEE 802.11-10/0091r3 January 2010 Plans for Thursday One more session Thursday am1 Topics to be addressed: 1. Review the operating options /selections needed for Task 5. Process or completion. Process for moving on thru Task 6 2. OpenSG/PAP2 activity planning 3. 900 Mhz ISM reband for 802.11 (Halasz presentation) 4. Coordination mechanism with 15.4g? 5. Link to Emergency Services? 6. Plan for March…. Plan for ad hoc: Avoid overlap with 15.4g – coordinate with 15.4g Suggestion: Tuesday pm1 and Thursday am1 Cybersecurity EC SG Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

NIST PAP#2 – Next Meeting January 2010 NIST PAP#2 – Next Meeting PAP 2 session at OpenSG Users Group, San Fransisco, February 4, 2010: A face-to-face meeting will take place on February 4th, 2010, starting at 8am until 3:00pm. This meeting is collocated with the OpenSG User Group meetings in San Fransisco during the week of February 1, 2010. Information about registration and the hotel venue can be found at: http://osgug.ucaiug.org/sf2010/default.aspx Bruce Kraemer, Marvell

Planning for OpenSG venue January 2010 Planning for OpenSG venue PAP#2 face to face meeting February 4 at SFO Hilton How much data traffic flow characterization information will be available? Will there be any matrix row changes? How do we establish a common set of “operating points”? Bruce Kraemer, Marvell

January 2010 Operating Point How should operating points be described to ensure common understanding. How to choose “operating points” with some degree of commonality across a diverse set of radio technologies and operating scenarios to allow comparison without requiring full channel models and simulations? Bruce Kraemer, Marvell

Operating Point – Discussion starter January 2010 Operating Point – Discussion starter Maximize link margin, maximize range, accept low date rate BPSK, 1 Mbps, single antenna Medium range, moderate data rate Clause 20, 64QAM,single stream, single antenna, OFDM, 40 MHz channel, 120 Mbps Short range, maximum data rate Clause 20, four stream, four antenna OFDM, 40 MHz channel, 600 Mbps Bruce Kraemer, Marvell

Operating Point Group Discussion January 2010 Operating Point Group Discussion Harmonize operating point based upon: Operating environment 1.Inside a house Primary: Range, data rate, latency, noise environment Secondary (QoS): Reliability, availability (need to include additional layers) (bit, packet) 2. Sub-station & generating plant Range, data rate, latency, noise environment 3. Collection – back haul - long range Bruce Kraemer, Marvell

Operating Point Group Discussion January 2010 Operating Point Group Discussion Regarding request that operating point include Availability and Reliability, how to measure these parameters? Group conclusion: reuse terms from matrix E.g., Link availability is measured as failure rate per 1000 sessions Bruce Kraemer, Marvell

Consideration of NIST Link budget Method January 2010 Consideration of NIST Link budget Method http://www.antd.nist.gov/wctg/manet/prd_linkbudgetcalc.html GENERAL PURPOSE LINK BUDGET CALCULATOR For arbitrary wireless communication radio links, this calculator explains the terms in the link budget and gives the user the opportunity to enter or change the parameters.  Macros invoked by clicking on buttons guide the user through the various options for selecting and entering the parameters.  For definiteness, the calculator uses the Hata outdoor propagation loss model. The calculator was developed as an Excel spreadsheet application by Leonard Miller.   It uses a new method for calculating the link margin needed to achieve a desired reliability when there is both lognormal shadowing and Rayleigh fading. SOFTWARE DOWNLOAD FILE Excel spreadsheet: download request form Version 1.24, added reminder to recalculate noise power when rate is changed 1/17/06 (Complete revision history listed on page 1 of spreadsheet) Bruce Kraemer, Marvell

LinkCalc: NIST Link Budget Calculator January 2010 LinkCalc: NIST Link Budget Calculator The performance of a digital radio system, in terms of its bit error rate (BER) or probability of bit error (Pe), is related to the bit energy-to-noise density ratio (Eb/No) at the receiver, where "noise" may include interference in addition to the thermal noise generated in the receiver. Theoretical analysis of system performance is based on postulating a value for the signal-to-noise power ratio (SNR) at the receiver, which can be converted to received Eb/No. When assessing the actual system performance in a particular application, it is necessary to calculate the actual received SNR. This calculation requires a "link budget," which simply is a careful accounting of the various terms in the following equation for received SNR expressed in dB units: SNR(dB) = Received signal power(dBm) - receiver noise power(dBm) where, as illustrated in the diagram, the link gains include antenna gains and the link losses can be grouped into three cate- gories: transmission losses (Lt), propagation loss (Lp), and reception losses (Lr). http://www.antd.nist.gov/wctg/manet/prd_linkbudgetcalc.html Bruce Kraemer, Marvell

LinkCalc: NIST Link Budget Calculator January 2010 LinkCalc: NIST Link Budget Calculator Options FOR A POSITIVE SURPLUS, you can - decrease the transmitter power - use less directive antennas or a cheaper receiver - use lower antennas or a longer link distance FOR A NEGATIVE SURPLUS, you can - increase the transmitter power - use more directive antennas or a better receiver - use higher antennas or a shorter link distance http://www.antd.nist.gov/wctg/manet/prd_linkbudgetcalc.html Bruce Kraemer, Marvell

Teleconference suggestion January 2010 Teleconference suggestion There is 1 work weeks between this IEEE session and the OpenSG/PAP#2 meeting. IEEE 802 has an opportunity to further develop the matrix rows, explanations and operating points to enhance their utility in moving into task 6. When further details on the data flow characterisitics become available, there will be a need to map technology against application domain. Bruce Kraemer, Marvell

Establish Smart Grid ad hoc January doc.: IEEE 802.11-10/0091r3 January 2010 Establish Smart Grid ad hoc Provide a forum for on-going /timely review of Smart Grid topics Encourage participation from other 802 groups 1. Assist in the development & completion of PAP#2 2. Refine the 900 MHz project proposal 3. Coordination with 15.4g Indentify other projects that would serve Smart Grid requirements Other topics? Leadership? Conference calls? Wednesdays at 2pm Eastern starting on Feb 10 (no call on Feb 24) Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

Information sources NIST twiki January 2010 Information sources NIST twiki http://collaborate.nist.gov/twiki-sggrid/pub/SmartGrid/WebPreferences/TWiki_NIST.png NIST Link Budget Calculator http://www.antd.nist.gov/wctg/manet/prd_linkbudgetcalc.html Bruce Kraemer, Marvell