Illinois Distributed generation Procurement program

Slides:



Advertisements
Similar presentations
Credit Card Option Announcement March 21, Exciting News! As of April 2, 2008 homeowners will be able to use Credit Cards with the current Version.
Advertisements

Innovations in Structured Products October 25, 2010 An Innovator’s Dilemma?
SRC Application Process Fall 2014 Version: November 12, 2014.
1 © 2013 WageWorks, Inc. All rights reserved. This document contains proprietary and/or confidential work product that belongs to WageWorks, Inc. and may.
Supplier Invoicing North America
ETutorial - Online TAN Registration and Request for Consolidated TDS/TCS file from TIN November 18, Tax Information Network of Income Tax Department.
CITY OF HALLANDALE BEACH PROCUREMENT PROCESS City Commission Workshop February 23, 2015.
Understanding and Complying with Audits I 2013 Schools and Libraries Fall Applicant Trainings 1 E-rate Program Understanding and Complying with Audits.
1 Implementation of the Solar RPS in New Jersey ABA Renewable Energy Panel November 16, 2005 Jan Pepper.
ONLINE FILING WORKSHOP Presented By: The Indiana Lobby Registration Commission 1.
ENTERING ELIGIBLE ENERGY RESOURCE APPLICATIONS IN DELAFILE Version 2.0 August 25, 2015.
Creating A Greener Energy Future For the Commonwealth Procurement of Renewable Energy on Landfills January 19, 2010 Courtney Feeley Karp, Esq.
NJ BTM REC Platform Transition Update Updated April 20, 2009 (This webinar is visual-only. To join the audio portion of the webinar, dial
Sourcing Event Guide Updated September 12, 2011 Sourcing Event Guide.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
Welcome to Greenville County’s Introduction of the new online Permitting System!
SCE Green Rate and Community Renewables Programs 2016.
Illinois Distributed generation Procurement program
and the Advantages of Going Solar in 2017
Filing the FCC Form 471 E-rate Program Applicant Training
Sunverge Energy – SGIP Overview
For help or more information, please contact the P&W SRM team at ;
Online Application Instructional Guide February 28, 2014
Payments Report Verification and Request March 2017
MULTIFAMILY PERFORMANCE PROGRAM
Journal of Mountain Science (JMS)
Carbon Free Energy with Storage 2017 JOINT REQUEST FOR OFFERS
GeM – User Enablement Supplier Module 2-Aug-17.
To the ETS – Accounts Setup and Preferences Online Training Course
Understanding and Complying with Audits
Massachusetts RPS Solar Credit Clearinghouse Auction 2017 Auction Bidder Webinar July 12, :00 – 3:00 PM ET.
Archiving and Document Transfer Utilities
Content of Tender Dossier - Instructions to Tenderers - Tenders
Step for Paper Registration and Payment, Copyright
Copyright © 2015 McGraw-Hill Education. All rights reserved
MyFloridaMarketPlace Vendor Meetings
To the ETS – PNG Continuation: Online Training Course
Inventory Transactions庫存交易
Grant Orientation Session
ERO Portal Overview & CFR Tool Training
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00008
2017 Spring Utility DG Procurement
Texas Instruments Supplier Portal- Web Invoice Overview
Budget Planning & Training
PEPCO Energy here Used there
Managing your take care® by WageWorks Plan
The LREC/ZREC PROGRAM and RFP Results
Microsoft Services Provider License Agreement Program reference card
MyFloridaMarketPlace
07 Master Data – Tools
Net Metering John McComb: P.E.
CRISIS 101 A LIHEAP Vendor’s Guide to Submitting Crisis Claims through PROMISe™ LIHEAP 2018/19 Season 1.
Course Title: BCM Crediting and Transfer of Feature Entitlements –
Manual for Supplier Registration
GroupBuy Training New Release – Version 3.0 Release Date: 04/25/2012.
Grant Orientation Session
Future Energy Jobs Act: Public Sector Impacts
Net Metering John McComb: P.E.
To the ETS – PNG Continuation: Online Training Course
To the ETS – Accounts Setup and Preferences Online Training Course
TOWN OF PALM BEACH ELECTRONIC SOLICITATION SYSTEM
CSS/Financial Aid PROFILE
Supplier Guide to Jaggaer Sourcing Director
Loan Submission Guide.
CFR Enhancement Session
TOWN OF PALM BEACH ELECTRONIC SOLICITATION SYSTEM
GSA eBuy Seller’s Tutorial
Building a healthy nation is what we do. Sidra Supplier Bid Submission.
Uploading A Complete Loan File
Presentation transcript:

Illinois Distributed generation Procurement program march 8, 2017

SRECTrade Registration and Bidding Process Summary and Q&A AGENDA Company Overview Program Overview SRECTrade Registration and Bidding Process Summary and Q&A This document is protected by copyright laws and contains material proprietary to SRECTrade, Inc. It or any components may not be reproduced, republished, distributed, transmitted, displayed, broadcast or otherwise exploited in any manner without the express prior written permission of SRECTrade, Inc. The receipt or possession of this document does not convey any rights to reproduce, disclose, or distribute its contents, or to manufacture, use, or sell anything that it may describe, in whole or in part. If consent to use these materials is granted, a link to the current version of this document on the SRECTrade website must be included for reference. 3

Transaction & Management platform Since 2008 280+ MW under management 20,000+ facilities under management 100% SREC focused Brokerage model Preferred ISEA vendor for IPA Procurement Successful participant in all 3 SPV Procurement Rounds New Facilities based on closed won 4

DG procurement PROGRAM OVERVIEW Two separate procurement events: April 2017 & November 2017 ($20 million each) Contract term is for five (5) years Systems over 25 kW must be IDENTIFIED at application (no speculative bids) 8

DG procurement PROGRAM OVERVIEW System eligibility Must be interconnected with Ameren Illinois, ComEd, MidAmerican (IL service territory only), Mount Carmel, a municipal utility in IL, or rural electric cooperative in IL Limited in nameplate capacity to no more than 2,000 kW (DC) No date restrictions/limitations on when the system was interconnected Meter requirements Under 10 kW: +/- 5% accuracy. Can be a production meter or inverter Over 10 kW: +/- 2% accuracy. Must be dedicated solar production meter Systems over 25 kW must be IDENTIFIED at application (no speculative bids) 8

DG procurement PROGRAM Requirements Credit requirements include a bid deposit and supplier fee Combined fee: $7/REC (~$44/kW) Bid deposit: $4/REC Supplier fee: $3/REC If bid unsuccessful, supplier fee AND bid deposit will be returned; if bid successful, ONLY bid deposit will be returned (with first SREC payment) Each system will submit a Minimum Bid (i.e., offer to sell) Systems will be grouped in blocks of at least 1 MW (DC) based on Minimum Bid price Winning bids will receive 5 year SREC contracts at or above their Minimum Bid price Example of 10kW system with first SREC Payment Supplier fee => utility company (NOT SRECTrade) Combined fee $7 (less than $50/kW) 10

SPV Round 3 (March 2016) and DG RFP (June 2016) Procurement Results Notes: 1. The total number of SRECs won for the term of the 5-year contract. Values provided by IPA Supplemental PV Procurement Results. 2. Approximated total capacity won in the procurement. Values estimated by SRECTrade. 3. Values estimated by SRECTrade; derived by dividing estimated total capacity by average winning system size (kW). 4. Values provided by IPA Supplemental PV and IPA Distributed Generation Procurement Results . Sum of total contract values may differ slightly from calculated value due to rounding. SPV (solar only) different from DG (total avg bid price) 8

EXAMPLE AGGREGATE GROUPS Note: System size and price are for illustrative purposes only. These figures are not representative of actual contract pricing. 14

Fees are charged per SREC transacted based on system size SRECTRADE FEES Fees are charged per SREC transacted based on system size These fees are deducted from each SREC payment (the client does not pay this) Fix table Fee charged when delivered 13

SRECTRADE APPLICATION REQUIRED DOCUMENTS AND INFORMATION Schedule A SRECTrade Client Contract If the system is operational and interconnected: Certificate of Completion Proof of Energized Date If the host is not the same entity as the system owner: Host Acknowledgement Utility Information Utility Company Utility Account Number (If the site does not have an account number yet, enter “00000”) 13

SRECTRADE APPLICATION PROCESS Click “Register a new facility” Complete required system information (page 1) Select the Completion Status (Energized or Identified) If the facility is speculative, please contact installers@srectrade.com 13

If the system is operational and interconnected SRECTRADE APPLICATION PROCESS If the system is operational and interconnected Enter the Energized Date and Interconnection Date Upload the Proof of Energized Date and Certificate of Completion If the facility is identified but is not yet operational or interconnected, leave the Energized Date and Interconnection Date blank and do not upload the Proof of Energized Date and Certificate of Completion Option to apply to PA Option to apply into PA (If interconnected) 13

SRECTRADE BID PROCESS – PAGE 1 Select the Host Relationship Enter the Bid Price (Price per SREC) Confirm the Interconnection Status and Utility Information Maybe explain Max SREC Quantity here – include capacity factor information Max SREC Quantity = Size (MW) X Capacity Factor X 8760 hours X Contract Term Capacity Factor. A predetermined capacity factor for each eligible technology and potentially varying by project size (or type, e.g., fixed or tracking solar systems) will be used to calculate the five-year quantity of RECs for each system. Maybe give example, but do not mention specifics (Fixed: 14.38%, Tracking: 17.00%) PLEASE emphasize the importance of entering the correct Utility Company and Utility Account Number If the UTILITY ACCOUNT NO. is unknown at the time of application, 00000 should be entered as the utility account number. This should ONLY be the case for NEW construction (new homes). An existing home that is having a solar array installed should have a known and identified utility account number, which must be included on the application. Entries listed as 00000 will be identified as “new construction” on the bid. Installers must carefully list the correct utility on each application. This was a VERY common error in previous rounds, where the installer listed the wrong utility on the initial which had to be rectified at the time of interconnection.

SRECTRADE BID PROCESS – PAGE 2 Upload the SRECTrade Client Contract If the System Owner and the Host are different entities or individuals, then upload the Host Acknowledgement Maybe explain Max SREC Quantity here – include capacity factor information Max SREC Quantity = Size (MW) X Capacity Factor X 8760 hours X Contract Term Capacity Factor. A predetermined capacity factor for each eligible technology and potentially varying by project size (or type, e.g., fixed or tracking solar systems) will be used to calculate the five-year quantity of RECs for each system. Maybe give example, but do not mention specifics (Fixed: 14.38%, Tracking: 17.00%) PLEASE emphasize the importance of entering the correct Utility Company and Utility Account Number If the UTILITY ACCOUNT NO. is unknown at the time of application, 00000 should be entered as the utility account number. This should ONLY be the case for NEW construction (new homes). An existing home that is having a solar array installed should have a known and identified utility account number, which must be included on the application. Entries listed as 00000 will be identified as “new construction” on the bid. Installers must carefully list the correct utility on each application. This was a VERY common error in previous rounds, where the installer listed the wrong utility on the initial which had to be rectified at the time of interconnection.

SRECTRADE BID PROCESS – PAGE 3 Payment Method Information SREC Fees Bid Deposit Return details 10 kW Example Additional Screen shot of supplier fee, bid deposit, and supplier fee Account number Routing number

SRECTRADE APPLICATION PROCESS

SRECTRADE APPLICATION PROCESS – IDENTIFIED SYSTEMS Navigate to Settings page Click “Submit Interconnection Document” Add the Interconnection Information

SRECTRADE APPLICATION PROCESS – FACILITY TRANSFERS

SRECTRADE TIMELINE Monday, April 3rd SRECTrade Application Closes Monday, March 20th SRECTrade Application Opens Monday, April 3rd SRECTrade Application Closes *Application must be 100% complete including bid deposit/supplier fee Thursday, May 4th Bid results announced Only applications that are complete and correct upon submission will be guaranteed inclusion in the bid

System Owners: clientservices@srectrade.com 415-763-7732 ext. 1 INQUIRIES? CONTACT US! System Owners: clientservices@srectrade.com 415-763-7732 ext. 1 Installers: installers@srectrade.com 415-763-7732 ext. 2 21