TCSPM Prototype Coating feasibility

Slides:



Advertisements
Similar presentations
Ferrite outgassing results G
Advertisements

BISMV & H 0 -H - PSB INJECTION VACUUM REQUIREMENTS LIU - PSB meeting 29th October 2012 C. Pasquino, P. Chiggiato, J. Hansen.
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
Engineering Department ENEN Choice of the material for TCTP ferrite supports Collimation Working Group F. Carra, G. Cattenoz, A. Bertarelli,
Status of R&D and Beam Plans for Low-Impedance Collimators F. Carra 1,2 A. Bertarelli, R. Bruce, A. Dallocchio, M. Garlasché, L. Gentini, P. Gradassi,
LNGS Scanning Station Nicola D’Ambrosio (LNGS group) Maiori, 4-6 June 2007.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
External examiner induction Alison Coates QA Manager (Validation & Review)
Engineering Department ENEN R&D on Advanced Materials: Status and Future Outlook N. Mariani, A. Bertarelli, F. Carra, A. Dallocchio, E. Krzyzak 1 st Meeting.
Status of North Area Target (TCC2) & prospects EATM 28/07/2015D. Grenier1 Targets (T2, T4, T6 and T10) replaced in 2014 during LS1 (+ 4 spares) Previous.
Work required to have a proposal in June (for discussion) RA, CPM, 15/4/03.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
STATUS OF H0/H- DUMPS M. Delonca – LIU meeting 29/11/2012 Thanks to: C. Maglioni, A. Patapenka, C. Pasquino, A. Perez, N. Mariani.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
UPDATES OF IRRADIATION TESTS AT GSI ON LHC COLLIMATOR MATERIALS E. Quaranta, F. Carra, P. Hermes CollUSM August 1 st 2014 BE BEAM DEPARTMENT Many thanks.
LHC Crystal MD 22/09/2015 – LSWG #7 R. Rossi for the LHC Collimation team and the UA9 Collaboration.
AdColMat: Status of the Working Group and Recent Advancements Working Group on Advanced Materials for Collimators 4 th Meeting - 21/7/2014 A. Dallocchio.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
News and hot topics Impedance meeting 14/04/2014.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD2 ColMat HDED.
BSRT UPDATE LMC 02-OCT-2012 F.Roncarolo on behalf of the BSRT team W.Andreazza, E.Bravin, A.Boccardi, J-J.Gras, A.Goldblatt, M.Hamani, T.Lefevre, R.Jones,
Elias Métral, LHC collimation working group meeting, 17/07/061/26 E. Métral for the RLC team LATEST ESTIMATES OF COLLIMATOR IMPEDANCE EFFECTS u Reminder:
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
HiRadMat Experiments: Simulation, Design and Planning F. Carra 1,2 A. Bertarelli, E. Berthomé, M. Borg, R. Bruce, F. Cerutti, A. Dallocchio, M. Garlasché,
Feasibility of impedance measurements with beam N. Biancacci, N. Wang, E. Métral and B.Salvant COLUSM meeting 27/05/2016 Acknowledgements: A. Lafuente.
Vacuum System P. Chiggiato TE-VSC
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
on behalf of the Phase II Collimation Design team
STI test HRMT-35 and Collimator plans for 2017 Special ColUSM: Material and design readiness for LS2 productions 2th May 2017 I. Lamas Garcia,
Total quantity (spare parts)
TDI: to coat or not to coat?
Validation of “toile diamant” and “scotch-brite” to enhance adhesion
Motivations and Introduction to MultiMat Experiment in HiRadMat
Francois and Lau EATM 17 July 2012
Status of HRMT23 Activities F. Carra, E. Berthomé, G
Interpretation of resonant wire measurements on the TCSPM
LIU Wire Scanner Milestones June 2017
Status of material tests
Installation of an Instrument on a CERN machine
Outcome of recent impedance bench measurements on collimators
Review on collimator movement with stepping motors
Impact of TIDVG problem on LSS5 dump design schedule
Configuration Management and Layout Database ELENA Project
G.Bregliozzi - VSC-LBV Section Collimation working group 08/07/02013
10 MHz amplifier status G. Favia
Thermo-mechanical simulations jaws + tank
Review of the MQW and MBW lifetime taking into account results from the reading of the dosimeters collecting data in the 2016 RUN Dosimeter (installation,
TDI Coating test at HiRadMat Proposal 1605 HiRadMat Scientific Board Meeting 27th June 2016 I. Lamas Garcia, M. Calviani, R. Ferreire, A. Perillo-Marcone.
MD2490: Measurement of the TMCI Threshold at Flat-Top
2th EuCard Col/Mat WP Meeting
Beam Gas Ionization Monitor (BGI)
Review on collimator movement with stepping motors
Status from the collimator impedance MD in the LHC
Discussion on the TDI impedance specifications
Update on beam screen issues
TDIS simulations plan.
Phase II Collimators : design status
NEWS ABOUT COLLIMATOR IMPEDANCE
Update on beam screen with shielding and other vacuum issues
Collimation margins and *
LARP Rotatable Collimators for LHC Phase II Collimation
SPS-DQW HOM Measurements
Project management Ray Veness.
Presentation transcript:

TCSPM Prototype Coating feasibility J. Guardia Valenzuela, A. Lafuente EN/MME 10.05.2016

Background TCSPM prototype to be installed in the LHC end-2016 Blocks will be made from MoGR and possibly coated with several materials to reduce impedance Production of 6 blocks made of MG-6403-Fc ongoing. Remaining blocks + taperings grade to be decided after this meeting. In order to meet aggressive schedule, coated blocks needed by September 2016. Transversal mobility of the jaws by +/- 10mm, available to offer a fresh surface to the beam in case of damage In this framework there is a need to confirm: UHV compatibility of the chosen MoGR grade If and which coating materials can be used (Mo, Cu and TiN) J. Guardia - 27.05.2016

Mo Coatings Mo coating evaluation included: Validation for Mo on MoGR currently going on real block. Full surface coated on Mo to be able to measure impedance Comments CFC Graphite Roughness measurements Ra 6.4 Ra 1.6 CO2 blasting Small variations/Uncertainities Coating - Impedance measurements ~14MS/m Vacuum firing 1000°C @ 2 h Outgassing tests 3x reduction observed ~13MS/m ~8MS/m Adherence tests Good adherence for both scotch test and pat handy test J. Guardia - 27.05.2016

Cu Coating Cu characterization is mostly based on previous work done for TCDI/TCDQ Spare blocks from TE/ABT tested for impedance and compared with recently extracted ones Additional adherence tests conducted on 3-stripe trial showed results comparable to those of Mo J. Guardia - 27.05.2016

TiN Coating 0.03 MS/m 6.8 MS/m 0.13 MS/m 5.5 MS/m Trials done on CFC and graphite in collaboration with Danish Institute DTI Initial adherence issues observed CO2 blasting the surfaces prior to coating eliminated the problem Outgassing tests not conducted in due time. Still relevant? Impedance measurements reveal discrepancies with expect values Next steps? 0.03 MS/m 6.8 MS/m 0.13 MS/m 5.5 MS/m 2-2.5x lower than TiN theoretical [1] [1] Handbook of refractory compounds G.V. Samsonov 1980 TiN: 400nΩm / 2.5MS/m J. Guardia - 27.05.2016

Coatings current status Several coatings have been explored. Main candidates: TiN hardly compatible with prototype schedule Trial coatings of Cu and Mo have been done on graphite and CFC A thorough evaluation has been done for Mo Cu characterization based on previous work done for TCDI/TCDQ plus some adherence tests recently done Impedance measurements performed on 3-stripes coated CFC block Cu Mo TiN J. Guardia - 27.05.2016

Thanks for your attention J. Guardia - 27.05.2016

Backup slides J. Guardia - 27.05.2016

MoGR latest outgassing results Latest MoGR results evince an improvement RGA results for the last two analyses reveal a shift of the maximum outgassing contributor from N2 to H2 Two more test scheduled to start next week A dedicated student and test bench are envisaged for the near future MG-3110-P MG-6530Aa (1) MG-6530Aa (2) MG-6403X(3) MG-6403Fc (4) 950°C 2h vacuum 48h Vacuum As received 12h Relative (mbar.l/s/cm2) > 10-10 1.7 10-10 3.6 10-10 7.6 10-10 3.9 10-11 3.3 10-11 Total (mbar.l/s) > 5 10-7 7.8 10-7 1.7 10-6 3.5 10-6 1.6 10-7 1.5 10-7 EDMS 1547420 / (2) EDMS 1555116 / (3) EDMS 1605495 / (4) EDMS Under Approval Vacuum requirements (EDMS 428155, EDMS 1312756) < 10-12 mbar.l/s.cm2 < 10-7 mbar.l/s after 24h at 250°C Extrapolated results for the total absorber area are only marginally above limit for collimator Non-controlled MG6403Fc block Outgassing test under gas injection In the light of these results block production has been approved by TE-VSC J. Guardia - 27.05.2016

Preliminary Schedule Assumptions: Coated blocks are tested for vacuum conformance in batches of 6 as agreed with TE-VSC Blocks are coated with Cu and Mo 4 week stop in August J. Guardia - 27.05.2016