Testing of SC Magnets Status - November 2010

Slides:



Advertisements
Similar presentations
Cryogenic Experts Meeting (19 ~ ) Helium distribution system for Super-FRS dipoles and multiplets MT/FAIR – Cryogenics and Magnets Y. Xiang,
Advertisements

M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Sergey Kozub Institute for High Energy Physics Protvino, Russia SIS300 meeting 19 March, 2009 Sergey.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
Applied superconductivity group L. García-Tabarés, F. Toral, I. RodriguezCIEMAT, I/2008.
Prospects of SC Quadrupole Production at IHEP-Protvino The 2nd Institutes Meeting on International Construction of the FAIR Accelerator Complex Protvino,
Review of CIEMAT contributions to linear accelerators L. García-Tabarés, F. ToralCIEMAT, 7/9/2006.
IHEP participation in SIS300 production UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Institute for High Energy Physics Protvino, Russia FAIR meeting.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
Interlock System Equipments for Conventional Magnets PP a-ABT_interlock conv mag.ppt October 22, 2015 Anthony Beaumont Interlock System Equipments.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
LAUC Proposal: Feedboxes and System Engineering bnl - fnal - lbnl - slac US LHC Accelerator Research Program Michael Lamm LARP+LAUC DOE Review June 21,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Status of GSI-FAIR Project magnets - open issues - G. Moritz GSI CARE HHH AMT November
LHC Enhanced Quench Protection System Review 24 – 26 February 2009.
5 th Joint Hi-Lumi LHC-LARP Annual Meeting 2015 SC Link Protection A.Ballarino 28/10/2015.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
TE-CRG Activities D. Delikaris, TE-CRG.
Super Fragment Separator (Super-FRS) Machine and Magnets H. Leibrock, GSI Darmstadt Review on Cryogenics, February 27th, 2012, GSI Darmstadt.
O. Kester, NuSTAR annual meeting, 27/02/2013
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
Peter Spiller MAC meeting Time Schedule SIS100 1.
Tests on production cryomodules Bob Kephart Sept 30, 2006.
Common Systems – Holger Kollmus Holger Kollmus FAIR - Machine Advisory Committee Meeting Common Systems and Controls.
September 8, 2005M. Lamm HC and Install US Deliverables1 Installation and Commissioning Project Present Participation How we might participate.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Super-FRS multiplet field.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Super-FRS magnet configurations.
Closing Session Report
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
The Super-FRS Multiplet, Magnetic and Cryogenic requirements
CERN, 11th November 2011 Hi-lumi meeting
High energy beam transport.
PROTECTION SHELLS TE-VSC.
Oleksiy Dolinskyy December 1st, 2014
PANAGIOTIS FARANTATOS(TE/MSC-MNC)* WP3, ESR 4: New Magnet
Cold mass design, assembly plans and QA/QC at CERN
HL-LHC IT STRING and Series test of SC link
Status of HESR 18th March Gießen Dieter Prasuhn.
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Roadmap for triplet cryostats
11 T Dipole Integration & Plans M. Karppinen
Quench Simulation at GSI
Powering LHC magnets version 30/3/2007.
LHC Enhanced Quench Protection System Review
The HL-LHC Circuits: Global View and Open Questions
SIS100 quadrupoles Dubna: status
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
(Procurement, testing of magnets)
Powering the LHC Magnets
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
Powering from short circuit tests up to nominal
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
Status of the PANDA Solenoid Magnet Production in BINP
TEST PLANS for HL LHC IT STRING
Status of the CBM Experiment – Key Dates for CBM Magnet
Status of the PANDA Solenoid Magnet Production in BINP
US-LARP Task: IR Commissioning
as a prototype for Super c-tau factory
US-LARP Task: IR Commissioning
Budker Institute of Nuclear Physics,
MEIC Shifting Magnet Tim Michalski August 6, 2015.
Presentation transcript:

Testing of SC Magnets Status - November 2010 A.Stafiniak, C.H.Schroeder, C.Mühle MAC -4 1st December 2010 A.Stafiniak at el. 1.12.2010

100% SIS100 & 100% SuperFRS & String SIS100 tested at GSI Testing Options 100% SIS100 & 100% SuperFRS & String SIS100 tested at GSI 10-30% SIS100 & String SIS100 tested at GSI External testing 90-70% SIS100 & 100% SuperFRS CERN, KIT, … A.Stafiniak at el. 1.12.2010

Testing Strategy vs. Accepted Risk risk level to be considered outside support expensive 100% tested by FAIR/GSI/others/Responsible for Machine Commissioning @cold/working conditions X% tested by FAIR/GSI/others/Responsible for Machine Commissioning @cold/working conditions Risk Assessment 0% tested by Manufacture @cold/working conditions 100% tested by Manufacture @cold/working conditions not possible or more expensive A.Stafiniak at el. 1.12.2010

SC Magnets for Testing SC Magnets for FAIR Pre-Series Series Production SIS100 String Short: 2xD, 1xQD, 1xFiC, 1xFL, 1xFB,1xCLB Long: +1xD,+2xQD,+1xCL, +1xBVCh SuperFRS 1x pre-Triplet (+components) 1x pre-Dipole SuperFRS 31+(<6)x Multiplets 22 x Triplets 3Quad(2ShortQ+Oct, 1LongQ) 1…4correctors 9x ‘Special’ Multiplets 1xShort Quad+ Octupole; 1xSteerer; 1xHexapole =71xQuad+96correctors 24+(4)x Dipoles SIS100 1x pre-Quadrupole Doublet (+components) 1x pre-Dipole SIS100 109+(?)x Dipoles 86 +(?)x Quadrupole Doublets 2xQuad, 1…3xcorrectors =171xQuad+144(240)xcorrectors A.Stafiniak at el. 1.12.2010

SIS100 Roadmap Contradictions A.Stafiniak at el. 1.12.2010

String Test* – Goals proving of : stability of the local cryogenic systems (including current leads and current lead box) integration of systems (cryogenic, electrical, electronic, mechanic) interconnection design and assembly mechanical stability of all systems in the string power supply systems functionality of the safety interlock system proving of all control-loops behaviour demonstrating of : efficiency of the cryogenic system efficiency of quench detection and magnet protection system improving the quality assurance for : production and commissioning (technical specification and procedures) assembly techniques (tools and procedures) gain experience solving problems during commissioning A.Stafiniak at el. 1.12.2010 * ‘All systems which were not tested in LHC Strings failed!’

String SIS100 Current Leads Box Feed-box Short String Cold Link Feed Line Feed in Cryostat Beam Vacuum Chamber Dipole Quadrupole Doublet A.Stafiniak at el. 1.12.2010

SIS100 Testing Scenarios vs. Schedule B A.Stafiniak at el. 1.12.2010

Topics to be discussed Testing strategy in given conditions. Testing 100% or only 20-40% magnets (units) at cold. Testing 0…100% of components at cold. Recommended number of spare components vs. chosen strategy. String SIS100 as a Quality Assurance milestone. Recommended strategy for String SIS100. A.Stafiniak at el. 1.12.2010

Thank You for Your Attention A.Stafiniak at el. 1.12.2010