Do you believe in Operation Statistics

Slides:



Advertisements
Similar presentations
ESLS 04 Daresbury Laboratory
Advertisements

Cyclotron Refurbishing & Development Meeting March 6, 2008.
Manchester University and the Cockcroft Institute Roger Barlow Technologies manchester.ac.uk Accelerators for ADSRs An account of the requirements.
F. Fernandez 28/10/ Ferran Fernandez WAO2014 Operators training experience at the ALBA synchrotron light source.
CW neutron source Benjamin Cheymol, Angel Jesus Romero Serrano, Jesus Alonso, Lali Tchelidze 6/30/11 Benjamin Cheymol, Angel Jesus Romero Serrano, Jesus.
Wir schaffen Wissen – heute für morgen Do you believe in Operation Statistics? Presented at the Accelerator Reliability Workshop 2011 Andreas Lüdeke Paul.
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut Controls tools for operation management at the Swiss Light Source at the EPICS collaboration.
Muon Collider 2011 Workshop Jun 27-July 1 in Telluride, CO Gollwitzer & Nagaitsev presented Attending: Ankenbrandt, Lebedev, Pasquinelli, Popovic, and.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EnEfficient – a networking.
FFAG Fixed Field Alternating Gradient synchrotrons, FFAGs, combine some of the main advantages of both cyclotrons and synchrotrons:  Fixed magnetic field.
The High Intensity Proton Accelerator of the Paul Scherrer Institute.
WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.
8th ESLS RF Workshop Daresbury September 2004 SUPER-3HC - M.Svandrlik 1 G.Penco, M.Svandrlik Operation Uptime Maintenance Performance vs filling.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Training Advanced Photon Source Operators: From the Street to the MCR Joseph Sutton Assistant Chief of Operations Advanced Photon Source Argonne National.
Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Large Research Facilities Status SLS, Proton Facility, PROSCAN, PSI-XFEL.
PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach.
DESY: From High Energy Physics to Synchrotron Radiation Accelerator Operation in a changing Environment Michael Bieler DESY: From High Energy Physics to.
ISIS operational update David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC DL-RAL Joint Accelerator Workshop, RAL.
Converting PROSCAN CS to EPICS Status Damir Anicic, Paul Scherrer Institute, Villigen, Switzerland For EPICS collaboration meeting 2008, Shanghai,
3rd Libera Users Meeting
June 17, 2004 / Collab Meeting Strategy to reduce uncertainty on a  to < 0.25 ppm David Hertzog University of Illinois at Urbana-Champaign n Present data.
Machine Protection at the 1MW CEBAF Electron Accelerator and Free Electron Laser Facility Kelly Mahoney Presented at the Workshop for.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
February 2010 ALBA Synchrotron Light Source Francis Perez.
Wir schaffen Wissen – heute für morgen Electronic Logbooks Revisited Paul Scherrer Institute Andreas Lüdeke Presented at the ARW 2011.
Paul Scherrer Institut
THE DIGITAL REVOLUTION. Wir schaffen Wissen – heute für morgen 15. Apr. 2013PSI, Paul Scherrer Institut The fully digital PSI accelerator control room.
PEP-II Reliability and Uptime Roger Erickson 13 October 2003 With thanks to C.W. Allen, W. Colocho, P. Schuh, M. Stanek, and the Operations staff members.
Slide: 1 MORE THAN 50 SYNCHROTRON LIGHT SOURCES AROUND THE WORLD APS SPRING 8 ESRF AMMW2013 I. LECONTE – P. ROUSSELY – OPERATION Group.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
The machine status and operating mechanism of BEPCII CAO, Jianshe Institute of High Energy Physics, CAS April 16, 2013 The 4th Accelerator.
ARW 2013 Opening Melbourne, Australia, 15 April 2013 Dr Mark Boland Principal Scientist Accelerator Physics Australian Synchrotron ACAS Deputy Director.
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut Introduction du PSI Workshop Precision Particle Physics Prof. Dr Joël Mesot.
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut Synchrotron Light Sources at the Paul Scherrer Institute at the 20th ESLS workshop at BESSY.
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
Tailoring the ESS Reliability and Availability needs to satisfy the users Enric Bargalló WAO October 27, 2014.
Paul Scherrer Institut 5232 Villigen PSI EURISOL/BENE_2007, PSI /GF34 Joint High Power Target Meeting EURISOL/BENE , CERN Direct target irradiation.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
Failure analysis experience at TLS Yi Chih Liu 15 April ARW 2013.
Andreas Lüdeke, Trieste, 24. Sep., WAO '07 Operation Information Management at the Swiss Light Source Andreas Lüdeke of the Swiss Light Source at the Paul.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
Modeling SNS Availability Using BlockSim Geoffrey Milanovich Spallation Neutron Source.
Montse Pont ARW 2013 Operation and Reliability at ALBA Montse Pont.
ISIS operational update
LHC intervention scheduling with the Work Acceptance Tool
The LEP Superconducting RF system has reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons in In 2000, this system,
EPICS Collaboration Meeting Fall EPICS Training
PETRA III, Status and Upgrade
ACCELERATOR RELIABILITY
SOLEIL EXPERIENCE WITH HIGH POWER SOLID STATE AMPLIFIERS
SNS Status Report Karen S. White 10/15/08.
MPE-PE Section Meeting
Uppsala Commitment to ESS and FREIA Planning
Brief introduction to the Injector MD days
Jefferson Lab Reliability Task Force and Initiatives
LIPAc Control System Reliability improvements
DESY Test Beam Facilities - Status and Plan
SNS Operational History
Why Study Electron Clouds? Methods and Tools to Study Electron Clouds
PSI’s high intensity proton accelerator – an overview Mike Seidel, PSI
An lepton energy-recovery-linac scalable to TeV Vladimir N
Thoughts on Energy Reach
A Superconducting Proton/Electron Linac
WELCOME TO SOLEIL Amor Nadji On behalf of Synchrotron SOLEIL
4-6 GeV CEBAF Reliability Overview
BEPCII Background Issues: Collimators and Masks
Roger Ruber for the FREIA team 11 June 2013, Uppsala
IOT operation in the SPS Long term experience TWC 800 MHz
Presentation transcript:

Do you believe in Operation Statistics Do you believe in Operation Statistics? Presented at the Accelerator Reliability Workshop 2011 Paul Scherrer Institut Andreas Lüdeke

Paul Scherrer Institute (PSI), Switzerland PSI: Swiss national research center 1300 employees Proton facility: 1 MW cw beam Spallation neutron source Proscan SC cyclotron Cancer therapy Swiss Light Source (SLS) e- storage ring 400mA, 2.4 GeV PSI West: Large Research Facilities Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 1

Swiss Light Source Operation Swiss Light Source is In operation since 2001 A user facility with 19 beam-lines in operation Providing ~ 5000 hours beam to users per year Users need to apply for beam time Just 30% of the proposals are accepted Accepted users need to wait about 6 month for beam time One important metric to judge machine quality Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 2

3rd Generation Synchrotron Light Sources: Availability Year Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 3 3

Availability: "Concours des Alpes" Year Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 4 4

Availability: "Concours des Alpes" Year Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 5 5

Metrics of the Swiss Light Source (SLS) Availability definition: “Delivered_Beam_Time” = “Beam_for_Users” during “User_Time” “User_Time" = “Scheduled_User_Time" + "User_Reserve_Time” Example for 2005: Uncompensated Availability Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 6

Elettra Metrics for Availability Thunderstorms are excluded from failure statistics at Elettra Example from 2005: Availability including outages from thunderstorms: Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 7 7

Availability: "Concours des Alpes” corrected Bare Availability [%] Year Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 8 8

Special Events: ESRF 2005 and the Crotch Absorber In March 2005 A water-to-vacuum leak Five days of user operation lost 120 hours downtime ESRF statistics 2005 Availability 97.6%, Total User Operation 5496 hours 131 hours downtime How can that be? All users of 5 days re-scheduled Not counted as downtime Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 9 9

What can we learn from this? Availability statistics not proportional to system reliability But large effort spend to compile downtime statistics Accurate failure data exists, but kept internal. Why? If that would be public, what could it be used for? Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 10 10

RF arcing at the Swiss Light Source Background SLS has 60 to 100 beam outages per year About 20 outages were caused by RF arcs Inquiry Asking around at the EPAC’08: “What is your experience with arc detectors?” Answer: arc detectors are often unreliable! Action We are replacing detectors with arc-coincidence detectors Result No arc interlock from any upgraded detector! Single diodes still show arcs, but do not cause interlocks Conclusion We had in 10 years 200 unnecessary beam losses! Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 11

What can we do? What we do now What we should do How to do that? We do your own mistakes Sometimes we share selected insights during workshops What we should do Learn from the failures of others Create a database of all outages of many facilities! How to do that? Define a simple document format Provide a web-platform to publish downtime event data I’ll start, will you join? Participate in the Friday morning discussion! . Andreas Lüdeke, Paul Scherrer Institute at the ARW11 in Cape town, 11-Apr-2011 Slide 12