Type B Installation Plan

Slides:



Advertisements
Similar presentations
Vibration Isolation Group R. Takahashi (ICRR)Chief T. Uchiyama (ICRR)Payload design H. Ishizaki (NAOJ)Prototype test R. DeSalvo (Caltech)SAS design A.
Advertisements

Rigging and Rigging Practices Section G of the Logging Code.
Machining Two introductory projects 1.Support post for mirror mount 2.Vertical micro-rail mount.
QUAD Testing Outline, Phase 2B Fiber Lower “half” Build-up and Testing M. Barton, B. Bland, D. Cook, J. Kissel, N. Robertson, J. Romie, T. Sadecki, for.
WINDOWS An opening especially in the wall of a building for admission of light and air that is usually closed by casements or sashes containing transparent.
LIGO-G D Suspensions Update: the View from Caltech Phil Willems LIGO/Caltech Livingston LSC Meeting March 17-20, 2003.
Status of KEK production July 11, 2008 at SLAC KEK T. Higo et al., Accelerator div. T. Takatomi et al., Mech. Eng. Center.
Seismic attenuation chains concept, design and advancement status Riccardo DeSalvo for the KAGRA Seismic group JGW-G September 10, 20121JGW-G
LCGT seismic Attenuation System DRADF DRAFT DRAFT DRAFT.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Diamonds & R&D on Pigtails Howard Budd Sep
Copyright 2006 The National Association of Certified Home Inspectors
AdvantagesDisadvantages One former can last a life time and be used over and over again without damage to it. Can take a long time to manufacture a former.
LIGO-G D Suspensions Design for Advanced LIGO Phil Willems NSF Review, Oct , 2002 MIT.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Vibration Isolation R. Takahashi (ICRR), K. Yamamoto (ICRR), T. Uchiyama (ICRR), T. Sekiguchi (ICRR), H. Ishizaki (NAOJ), A. Takamori (ERI), R. DeSalvo.
Prototype Test of Vibration Isolation System Current Status & Schedule
Takanori Sekiguchi Anual Meeting of Physics Society of Japan Sep. 22nd, 2013) Prototype Test of Vibration Isolation System Current Status & Schedule 1.
Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Prototype Test of Type-B 1 Takanori Sekiguchi KAGRA F2F MEETING Feb
SUSPENSION DESIGN FOR ADVANCED LIGO: Update on GEO Activities Norna A Robertson University of Glasgow for the GEO 600 suspension team LSC Meeting, Louisiana,
Summary of Suspension Configurations Yuta Michimura Department of Physics, University of Tokyo March 18, 2015.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
Ryutaro Takahashi (National Astronomical Observatory of Japan) Vibrtion isolation system for KAGRA The 6th Korea-Japan workshop on KAGRA NAOJ, June,
Takanori Sekiguchi External Review Control and tuning of suspension 1 T. Sekiguchi KAGRA 4th External Review.
Installation Plan of VIS Ryutaro Takahashi (NAOJ) for the 4th external review on 30 June.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
QMUL 2/2/12 1  Current status of new alignment system.  Drawing status update.  Laser alignment.  Module removal from frames for new kit.  Stave(lets.
1 PAY & OSD Piero Rapagnani 26/02/ Fatal interference with current geometry: deep redesign of the payload needed Positioning another payload close.
Low frequency anti-vibration system of LCGT Vibration Isolation Group R. Takahashi (ICRR), K. Yamamoto (ICRR), T. Uchiyama (ICRR), T. Sekiguchi (ICRR),
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
Vibration Isolation Subsystem KAGRA face to face meeting (31 July, 2012) R. Takahashi (ICRR), K. Yamamoto (ICRR), T. Uchiyama (ICRR), T. Sekiguchi (ICRR),
21/5/2007Thomas S. Bauer - Nikhef1 Input Mode Cleaner Update LIGO-G Z.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Status of the cryogenic payload system for baseline KAGRA Rahul Kumar 1, K. Craig 2, K. Yamamoto 2, H. Tanaka 2, T. Miyamoto 2,T. Kajita 2, T. Suzuki 1,
Cryogenic Payload Modeling: Vibration via Heat Links Takanori Sekiguchi JGW- JGW-G Cryogenic Payload Meeting
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
BM&N STS ladders assembly in VLHEP
System Conversion.
Assembly of the KAGRA 4-fiber sapphire prototype suspension
ATLAS pixel module assembly flow
What is Stave Carrier Frame Required to Do?
Type-A SAS Local Control Simulation (Current Status)
HLTS Kickoff Presentation Derek Bridges Bobby Moore July 7, 2011
VELO-installation meeting CERN, January 17, 2006
Kazuhiro Yamamoto on behalf of KAGRA collaboration
KAGRA用防振装置の開発 VIII Configuration Sensors and Actuators
Yuta Michimura Department of Physics, University of Tokyo
LCGT Seismic Attenuation System LCGT-SAS
LARP Phase II Secondary Collimator RC1
Gingin Advisory Committee Meeting 08 Dec 2009
Control of the KAGRA Cryogenic Vibration Isolation System
DECam Filter/Shutter Installation and Filters Installation
Vibration Isolation Systems
Cryogenic Payload Modeling: Vibration via Heat Links
CHAPTER 14 MRP and ERP.
Type B Installation Plan
Mark Barton f2f Meeting 2/22/16
Mark Barton f2f Meeting 2/22/16
Unit 31- LA B Production Planning for Engineering
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Fishing Rod Design for KAGRA GAS Filters
BTEC Level 2 Engineering
Yuta Michimura Department of Physics, University of Tokyo
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
HAM-SAS Mechanics Status of modeling V.Boschi, V. Sannibale.
Development of vibration isolation systems for LCGT VII
Yuta Michimura Department of Physics, University of Tokyo
Cryogenic Payload Modeling: Vibration via Heat Links
Presentation transcript:

Type B Installation Plan Mark Barton KAGRA Extended Chiefs Meeting, 7/4/2016 JGW-G1605348-v2

Scope One BS suspension Three SR suspensions (SR2, SR3, SRM) Each has Preisolator (PI) with Inverted Pendulum table (IP) and GAS filter (F0) Standard Filter (SF) and damper ring Bottom Filter (BF) Intermediate Mass (IM) and Intermediate Recoil Mass (IRM) Optic (TM) and Recoil Mass (IM) Lower breadboard, blade springs, and damper rings. SRx payload (TM/RM/IM/IRM) is similar to PRx – BS payload is unique (BS)

Team Core team Additional help from Mark Barton – leader, NAOJ, physicist Fabian Peña-Arellano – NAOJ, physicist Naoatsu Hirata – NAOJ, engineer Additional help from Ryutaro Takahashi – NAOJ, large purchases Naohisa Sato – NAOJ, PI testing – to be confirmed

Installation Procedure Assembly frame based on versions for TAMA Type B test and PR3 test. Even more use of jacks to raise and lower sections independently (for hooking of maraging rods) without galling of screws in security structure. IM is now supported from main frame while BS and RM are hung from it – no separate hanging frame. Frame has extensions to hold cloth cover clear of PI. Frame will be constructed on the +Y side of the BS tank from today. SRx version will be near-identical – need to decide whether to save money (use BS frame) or time (make another).

Schedule

Current Status - BS Have essentially all parts and fasteners for BS except: A few in-vacuum cables (on order; should arrive in good time) Blades for lower breadboard (on order; should arrive in good time) Wide-mouthed OSEMs. RM, IM, IRM, BF and SF have been pre-assembled. Dummy BS was prepared (gluing of flags, prisms) but will need to be redone (problems with quantity of glue). Assembly frame for BS will be constructed this week Payload assembly procedure written (JGW-E1604817) Overall assembly procedure about half written (JGW-E1504235). BS test hang with dummy BS will begin ≈7/25.

Current Status - SRx Have parts for SR2 and SR3 payloads (i.e., the ones intended for iKAGRA). Need payload parts for SRM (as well as for PRM – Type Bp) Need fasteners for three SRx. Need additional in-vacuum cables and OSEMs. Need to modify some parts based on lessons learned from BS/PR3. Want to use sapphire prisms as for BS, but will need to modify RMs. Machining test in progress at NAOJ ATC to see if feasible. SF and BFs are pre-assembled, but need some (re-)testing. PI stages are on order from Nikhef but will need setup/testing – hope to get some help from Sato-san of Type A group or TBD.

Technical Issues BS flag/prism gluing Prisms Need to solve problem of correct amount of glue. Need to improve technique for using fixtures. Need to re-solve for glass optic. Prisms Sapphire prisms on PR3 failed. New prisms are larger, better polished and cut at a different angle to the optic axis of the sapphire, so should be stronger. Sapphire prisms are being used in the test hang, but might still have issues. SR recoil masses will need to be remachined to allow larger prisms – might warp – test in progress. OSEMs vs. OLs for optic position sensing. Flags with tips for OSEM shadow sensors are easy to break. VIRGO uses OLs that sense position (accuracy low, but good enough) Akutsu-san is designing a VIRGO-style OL; also wide-mouthed OSEMs. Plan is to attempt BS test hang with full flags. If OLs work well or full flags get broken, can use stub flags with magnets but no tips (impossible to break).

Schedule/Manpower Issues SR Procurement/Preassembly Lots of SR procurement still to do – extra payload, fasteners, cables Lots of SR preassembly still to do – PIs, RM, IM, IRM, optics Lots of SR documentation still to do May need to hold off on BS test hanging to get SRs in better shape. SR assembly frame Current schedule assumes one frame. A second frame would be expensive but could allow some parallel work, especially if issues/holdups arise. Filter remeasurement Hirata-san has been double-checking the load capacities of all the filters (including Type A). Takes one day per week at NAOJ, currently Wednesday – awkward for work at Kamioka. PI Preparation Schedule currently assumes significant help with PI setup from Type A group.