Overall Roadmap and Timeline

Slides:



Advertisements
Similar presentations
IEEE Education Partners Program 2008 Promotional Planning.
Advertisements

CIMS (ProMIS) Overview. Why CIMS Updated version of DDD ProMIS system Updated version of DDD ProMIS system Compliance with DHS contract policy Compliance.
® VisualPlex Exchange Project Definition Phase June 23, 2000 Prepared James M. Dutcher Oracle Consulting Services.
Catlyn Colson. Recap of Previously Completed Work Previously I had done the following: Built the Database, started basic layout of the webpage, connected.
Sprint 104 Review / Sprint 105 Planning April 8, 2013.
Follow us on: TAMU Jobs Online System Upgrade Presented to HR Liaison Network Fall Meeting 2012 October 31, 2012.
Website Project Development Presentation by APNARAJ.COM.
Protocol Lifecycles.  At their meeting in May, the GSA Board approved a new policy that establishes a well-defined three-year lifecycle for GSA protocols.
Sprint 110 Review / Sprint 111 Planning July 1 st, 2013.
NovaBACKUP xSP Technical Training By: Nathan Fouarge
Rick Conrad, Efrain Lopez III, Saeed Noori. What is Experience Sampling? Survey method People’s experiences Real-time Format Paper and Pencil Handheld.
Géant-TrustBroker Project Overview Daniela Pöhn 7 th FIM4R meeting Frascati, Italy April 24 th, 2014.
Proposal Processing Proposals, Staffing Profiles, Financial Summary Hewlett-Packard Project & Portfolio Management Project & Portfolio Management Slide.
Proposal Processing Proposals, Staffing Profiles, Financial Summary Hewlett-Packard Project & Portfolio Management Project & Portfolio Management Slide.
This tip sheet focuses on how to share client records and make client referrals using SMART. Total Pages: 6 Client Consent and Referral Consent Referral.
Module 2 National IEA Process Design and Organization Stakeholder’s consultative workshop/ Training on Integrated assessments methodology ECONOMIC VALUATION.
1 Transnational Partner Search Toolkit Transnationality Contact Points Meeting 30 September Warsaw.
Automatic manufacturing systems project I. KMAGP12ANC L: András Boráros-Bakucz.
Géant-TrustBroker Dynamic inter-federation identity management Daniela Pöhn TNC2014 Dublin, Ireland May 19 th, 2014.
Innovation through participation Data Protection Code of Conduct (DP CoC) TNC2013 conference, 4 June 2013 Mikael Linden, CSC – IT Center for Science
The next big thing from Boyum IT
eduroam-as-a-service
myWizard Metrics User Guide For Base Deployed Projects
STEP Systematic Tracking of Exchanges in Procurement.
EDUNAV Degree Planner.
How Can NRCS Clients Use the Conservation Client Gateway
Affiliate Menu – Gallery
SPS Donate Now VT.
eduroam Managed IdP - Roadmap
GMAS 2.0 Project Update April 2017
Guaranteed Issue Whole Life Insurance (GIWL) Presented by….
Performance Review Tool Updates College of Engineering
eduTEAMS Roadmap and Timeline,
Géant-TrustBroker Dynamic inter-federation identity management
Version control, using Git
ShareTheTraining TRR ARB Presentation Team 11
SuiteCRM – Magento Integration
Standard Operating Procedure
SITS EXPERTS MAP Content Creation
FUNCTIONALITIES ON iPAD
StratusLab Sustainability
GÉANT project update eduTEAMS - AAI as a Service for Collaborative organisations Introduction Status Pilots New Features – input requested InAcademia –
wal-mart-staples-clone-script/ Amazon Clone - Amazon Script | Wal-Mart Script | Wal-Mart Clone | Staples Script.
Staff Training Travel Authorization electronic approvals
Big Blue Button A Canvas Workshop
INPE, São José dos Campos (SP), Brazil
James SHANNON RA44 – BUD 15 Sept 2010
Orders & Shipment Tracking
Thursday pilot session: 7-minutes
Software for ambitious enterprises
ENTSO-E Transparency Platform Vision Project
Windows Summit /27/2018 © 2010 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may.
GMAS 2.0 Project Update April 2017
System Review – The Forgotten Implementation Step
Portfolio Management Process & Customer Request Management
Notefied (web publishing)
Björn Erik Abt :: Paul Scherrer Institut
RNG Implementation Release 1.
Draft Capacity & Connection Plan
Fei Huang Prof. Soon Chun ISI490 Spring 2018
GSICS Actions Tracker Live Demo
MyAPNIC Project Update
BEMS user Manual Fundación cartif.
PyWBEM Python WBEM Client: Overview #2
Port Back Data Collection & Transition
What is InAcademia? An affiliation validation service
Mobile Registration App Training Guide for OPO Staffers
President Search “the most important work that this Board Will Ever Do” Our Next Steps: Search Firm and interim President Report to the Clark College.
Project Name Here Kick-off Date
Presentation transcript:

Overall Roadmap and Timeline 2016 2017 2017 Q1 Q2 Q3 Q1 Q2 Q3 Q1 V3.1 V3.1 Production V4.0 V4.0 V4.0 Production V4.1 Production V5.0 V5.0 V5.0 V5.0 Production Feature A Feature B PLM Gate Feature C Feature D NIF Phase Service Design/Development Phase Feature E Service Transition Phase Feature F Feature G Feature H Pilot Phase Today Production Phase

Overall Roadmap and Timeline 2017 2018 2019 Q1 Q2 Q3 Q1 Q2 Q3 Q1 V3.1 V3.1 Production V4.0 V4.0 V4.0 Production V4.1 Production V5.0 V5.0 V5.0 V5.0 Production Feature A Feature B PLM Gate Feature C Feature D NIF Phase Service Design/Development Phase Feature E Service Transition Phase Feature F Feature G Feature H Pilot Phase Today Production Phase

Roadmap InAcademia 2017 / 2018 Release Feature Description Benefit Status 0.9 Improved consent screen Adjustment to privacy demands and user friendly Commit to privacy policy and be transparent to end users Planned - Ideas are complete, realisation in next version of InAcademia Add test IdP Univ. of Harderwijk Add virtual academy for test purposes Service Prov. Make testing possible for service providers Create institutional validation page GUI Stuff service Show details, modify text Improve service for end user and commit to privacy policy 1.0 Demo shop improvements Create validation for staff / member, test IdP Improved service for demo purposes and better performance Potential – Early stage of planning and work to be done Correct buttons Implement the final InA button Be recognizable now and in the future in all connected web shops Create registration client InAcademia plugins Wordpress/Magento Create possibilities of automatic sign-up of SPs Automatic connection to InA and be able to scale up fast

Roadmap future steps InAcademia Category Description Start Date End Date General Support for servers, basic support service, KPI’s, Release management, Feature lists in Trello, Test InAcademia Client registration 1 April 2017 1 May 2017 Documentation Connecting new service, DNS validation, Internal description procedures, documentation on Website Contracts Draft General Terms and Conditions for InAcademia Service and approval GÉANT Tech OTAP setup, setup Test IdP, Update Github, Create registration client and institutional validation, IdP blacklisting, IdP’s on website Procedures End-user support model, billing and pricing, Partner model (Q4 2017) GUI Design consent screen, update GUI and show technical details, WAYF redesign, text modification, state that university has nothing to do with the service of the SP Demo shop Tweak current demo shop, setup different affiliation profiles, add correct InAcademia buttons PR materials Produce various PR materials for TNC presentation and beyond