Electric Vehicles Safety Global Technical Regulation

Slides:



Advertisements
Similar presentations
Task Force 3: Electrolyte leakage Last update- 12/05/
Advertisements

An illustration of EVS-GTR Battery System Test Project and Test Methods’ Adaption to Commercial Vehicles Peter Wu, BYD.
TF8 – OICA considerations for the draft annex for heavy vehicles.
TF8: Research IF EVS-GTR Battery System Test Project and Test Methods’ Adaption to heavy /commercial Vehicles.
REPORT TO GRPE 70 TH SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE th GRPE, January 2015 Agenda.
EVS-GTR TF5 Update Progress TF5 task force – thermal propagation 2015/6/4.
Progress report of TFG 7 “Fire resistance test” June 5, 2015 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute (KATRI)
Chen Chunmei MIIT, the People’s Republic of China Oct. 23, MIIT1 Status of EV Safety Standards in China.
REPORT TO GRPE 68 TH SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document No. GRPE (68 th GRPE, 9-10 January, 2014,
Hydrogen Fueled Vehicle Global Technical Regulation (GTR) Subgroup Safety (SGS) Nha Nguyen 49 th GRSP Session May Informal document GRSP (49th.
Report from IWG on Environmental and Propulsion Performance Requirements for Light vehicles (EPPR) 69 th GRPE 5-6 th June 2014 Geneva Chair Petter ÅSMAN.
Development of a Technique for HFCV Safey Assessment
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia.
Progress Report, EVS SOC-TF May 2014 U.S. DOT Head Quarter 1200 New Jersey Avenue, SE Washington, DC
ELECTRIC VEHICLE REGULATION IN JAPAN
Transposition of GTR No.13 “Hydrogen and fuel cell vehicles” into UN Regulation - Explanatory material - 20/September/2013 The European Commission and.
FRANCE1 Informal adhoc ELSA Working Group Geneva, December 9th, 2009 Proposal from France based on - Informal document GRSP n° ECE/TRANS/WP.29/GRSP/2009/16.
Volker Rothe, OICA October 23, 2012 Draft Global Technical Regulation Electric Vehicle Safety Outline of the OICA proposal.
Draft Proposal ECE-R 100 protection against electric shock
TF8 : Applicability for Commercial Vehicles EVS 7 th conference March 18 th , France.
9 th EVS GTR Meeting Task Force #9 Status Report Changchun, September 17th 2015.
Task Force 3: Electrolyte leakage Last update- 11/11/ EVS-06-19e.
Page June 2015 OICA position on venting EVSTF-04-11e.
TF8 work report for 9 th EVS-GTR conference Changchun.
EVPC1 Informal adhoc EVPC Working Group Geneva, may 18 th, 2010 Proposal from FRANCE based on EVPC informal group work Informal document No. GRSP
Task Force 3: Electrolyte leakage Last update- 01/06/
Progress report of TFG 7 “Fire resistance test” Mar 19, 2015 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute (KATRI)
Progress report about RESS activities Gerd Kellermann, Germany Informal document GRSP (50th GRSP, 6–9 December 2011, agenda item 15)
1 Warning requirement for the management system of the REESS May, 2014 U.S. DOT Head Quarter 1200 New Jersey Avenue, SE Washington, DG JASIC.
Task Force 3: Electrolyte leakage Last update- 19/03/
EVS-GTR TF5 Update Progress
1 TF8 : Applicability for Commercial Vehicles EVS 8th Meeting June 4th , Washington DC.
UN/ECE/WP29 Sessions Overall Status of Recent UN/ECE/WP29 Sessions MOCT / KOTSA(KATRI)
REPORT TO GRPE 69 TH SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE th GRPE, 5-6 June 2014 Agenda item.
Task Force 3: Electrolyte leakage Last update- 14/09/
Rechargeable Energy Storage systems (REESS) requirements Gerd Kellermann, Germany Informal document GRSP (51 st GRSP, May 2012,
Regulations of Crash Safety about HEV and EV MLIT, Japan December 2006 Informal Document No. GRSP th GRSP 12th- 15th December 2006 Agenda Item.
Progress report of TFG 7 “Fire resistance test” Mar. 3rd, 2016 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute.
Review of EVS 9 th Meeting 1> TF8 catch an agreement on the definition of heavy duty electric vehicles as below: heavy vehicles cover the vehicles belong.
TF#4 – Mechanical Integrity Approved Japanese proposal for addition of vehicle mechanical protection structure into mechanical integrity requirement. EVS-11-17e.
Task Force 8: Heavy Duty Vehicles
Electric Vehicles Safety Global Technical Regulation Phase 1
Task Force 3: Electrolyte leakage
Task Force 3: Electrolyte leakage
10th EVS-gtr IWG Progress Report TF6 - SOC 2nd March
Co-Sponsors: China, Japan, EU and US 59th Session GRSP May 9-13, 2016
Electric Vehicles and the Environment (EVE IWG)
Motorola Solutions Internal Information
Informal adhoc ELSA Working Group
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
Informal document GRE Rev.1
Note by the secretariat
Electric Vehicles and the Environment (EVE IWG)
JASIC Japan ______ 61st GRSP Session May 2017
Task Force Outline Submitted by an expert from the Republic of Korea
TF4 report (Tokyo, 2016/03/03) 1. Mechanical integrity test
Task Force 3: Electrolyte leakage
Note by the secretariat
VIAQ (Vehicle Interior Air Quality) Informal Working Group
VIAQ (Vehicle Interior Air Quality) Informal Working Group
New UN Regulation on electric vehicles of category L
Task Force 1: Protection against Water
Task Force 1: Protection against Water
EVS-06-10e Progress Report on TF5 Nov. 3rd, 2014.
Japan’s response to Action item 2 EVS-GTR IWG#17.
Note by the secretariat
TF9 Meeting: Warning Light Indicator
Action item 2 Japan EVS-GTR IWG#17.
Task Force 1: Protection against Water
UNECE IWG on EPPR for L-category vehicles
Presentation transcript:

Electric Vehicles Safety Global Technical Regulation Submitted by expert from France Informal document GRSP-60-20 (60th GRSP, 13-16 December 2016, agenda item 7) Electric Vehicles Safety Global Technical Regulation Nha Nguyen On behalf of the EVS-GTR IWG

Background In 2012, under the United Nations World Forum for Harmonization of Vehicle Regulations (WP.29) and the 1998 Agreement, China, Japan European Union and the United States are co-sponsoring to establish 2 working groups to address environmental and safety issues associated with electric vehicles (EVs) EV and Environment (EVE): focusing on the information exchange and joint research concerning the related impacts of the development of EVs to the environment such as CO2 emissions, energy consumption and efficiency, energy storage (batteries, capacitors, etc.) and infrastructure. EV Safety (EVS): establishing a Global Technical Regulation (GTR) for EVs ensuring high voltage electrical safety, safety of electrical components, and rechargeable electric energy storage systems (REESS) Some background information on the sponsors of the EV informal working groups EVE informal working group focuses on the environmental and fuel efficiency issues; The goal of the EVS GTR informal working group is establish a GTR to address the safety of EVs

EVS-IWG EVS-informal working group (IWG): comprised of over 50 members from government regulators, industry standard organizations and vehicle and battery manufacturers. IWG has conducted 13 meetings. The meetings and development process are transparent. Documents and reports are posted on the UN website: https://www2.unece.org/wiki/pages/viewpage.action?pageId=3178628 Goal: WP.29 vote to establish the GTR is November 2017 Documents and reports of each meeting are posted in the UN website: https://www2.unece.org/wiki/pages/viewpage.action?pageId=3178628

EVS-GTR Terms of Reference: To the extent possible, GTR will be science-based, data driven and performance based - avoiding design-specific requirements IWG will investigate, conduct research and establish provisions at vehicle and system levels to address vehicle safety issues for EVs: In-use: Occupant protection: protection against electric shock Performance and safety requirements for Li-Ion based rechargeable energy storage system (REESS) including battery management system for conditions of low and high temperature, over-charge, over current, over discharge, external short circuit, and environment conditions such as extreme temperature, vibration, mechanical shock and fire resistance Post crash: Electrical isolation; protection against electric shock Battery integrity: battery management system, robustness and survivability Battery discharge procedure End-of-life: Disposal of battery The informal working group established the terms of reference. Some of the highlights in the TOR: The group will stress on research to obtain the necessary technical and scientific data to establish requirements and test procedures the GTR will address safety requirements of EVs for in-use, post crash; and end of life for Li-ion batteries

2-Phase Approach Phase 1: near-term critical safety requirements Based on a proposal from OICA which is comprised of mostly requirements from R94, R95 and R100 Phase 2: safety requirements that require long-term research as well as further improvement of the GTR

Task Force Teams TF-1: Protection Against Water – China TF-2: Low Electrical Energy/Physical Barriers – OICA TF-3: Electrolyte Leakage – OICA TF-4: REESS Protocol BMS, environment exposure – OICA TF-5: Thermal Propagation – China TF-6: State of Charge (SOC) – Japan TF-7: Fire Resistance – Korea TF-8: Heavy Vehicles and Buses- China TF-9: Warning systems – U.S.

Functional safety and markings Draft GTR – Phase 1 Functional safety and markings BMS functionality at vehicle and pack levels Battery safety and Low charge warnings Water exposure Propagation Environmental exposure (In-use): Vibration; shock; extreme temperature Post-crash: Electric shock Battery integrity Prevention of electric shock Heavy trucks and buses

Performance Requirements 5. Performance requirements (light duty/passenger vehicles) 5.1. Requirements of a vehicle with regard to its electrical safety - in-use 5.1.1. Protection against electric shock 5.1.2. Functional safety 5.2. Requirements of a vehicle with regard to its electrical safety - post-crash 5.2.1. General principle 5.2.2. Protection against electric shock 5.3. Requirements with regard to installation and functionality of REESS in a vehicle 5.3.1. Installation of rechargeable energy storage system (REESS) on a vehicle 5.3.2. Warning in the event of operational failure of vehicle controls that manage REESS safe operation (e.g. BMS) 5.3.3. Warning in the case of a thermal event within the REESS 5.3.4. Warning in the event of low energy content of REESS

Performance requirements (cont.) 5.4. Requirements with regard to the safety of REESS - in-use 5.4.1 General principle. 5.4.2. Vibration 5.4.3. Thermal shock and cycling 5.4.4. Fire resistance 5.4.5. External short circuit protection 5.4.6. Overcharge protection 5.4.7. Over-discharge protection 5.4.8. Over-temperature protection 5.4.9. Overcurrent protection 5.4.10. Low-temperature protection 5.4.11. Management of gases emitted from REESS 5.4.12. Thermal propagation 5.5. Requirements with regard to the safety of REESS - post-crash 5.5.1. Vehicle based test 5.5.2. REESS-component based test

Performance Requirements (cont.) Based on the requirements of the light duty vehicles 7. Heavy duty vehicles and buses 7.1. Requirements of a vehicle with regard to its electrical safety - in-use 7.1.1. Protection against electric shock 7.1.2. Functional safety 7.2. Requirements with regard to installation and functionality of REESS in a vehicle 7.2.1. Installation of rechargeable energy storage system (REESS) on a vehicle 7.2.2. Warning in the event of operational failure of vehicle controls that manage REESS safe operation 7.2.3. Warning in the case of a thermal event within the REESS 7.2.4. Warning in the event of low energy content of REESS

Performance requirements (cont.) 7.3. Requirements with regard to the safety of REESS - in-use 7.3.1 General principle 7.3.2. Vibration 7.3.3. Thermal shock and cycling 7.3.4. Fire resistance 7.3.5. External short circuit protection 7.3.6. Overcharge protection 7.3.7. Over-discharge protection 7.3.8. Over-temperature protection [7.3.9. Overcurrent protection 7.3.10. Low-temperature protection 7.3.11. Management of gases emitted from REESS 7.3.12. Thermal propagation]

Timeline for Phase 1 December 2016: Submit draft GTR to GRSP January-February 2017: Possible EVS meeting and editorial meeting May 2017: Submit formal GTR to GRSP June 2017: Submit GTR to WP.29 November 2017: Possible vote to establish GTR

Phase 2 The exact scope and timeline for Phase 2 of the GTR will be clarified after the completion of the Phase I. Some possible items: In-use: Protection during charging: AC and DC Propagation/enclosure thermal containment Water immersion Post-crash: REESS safety assessment Battery discharge Toxicity Update phase 1 requirements

Thank you