Proximity Cryogenics P&IDs Meeting

Slides:



Advertisements
Similar presentations
LAPD Run 2 Results and Notes Terry Tope
Advertisements

LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
Cryogenic discussion and update 30 October 2014Neutrino platform.
LAr1-ND Conceptual Design Review of Status June 25 Craig Thorn.
LAr1-ND David Montanari Fermi National Accelerator Laboratory CERN – Feb 16, 2014.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
February 9, 2002 Muon Collaboration Technical Board Michael Iarocci E951 Cryogenics1 Cryogenic Cooling System for the E951 Pulsed Solenoid Magnet Basic.
1 Status of Hydrogen System Development MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov, Tom Bradshaw, Elwyn Baynham, Mike Courthold,
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
Current status Arkadiy Klebaner November 21, 2012
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
William Notardonato 1, Adam Swanger 1, Wesley Johnson 2, and Thomas Tomsik 2 1 -NASA Kennedy Space Center 2- NASA Glenn Research Center Ground Operations.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
NCSX NCSX CDR May 21-23, 2002 Larry Dudek Slide 1 Facility Systems (WBS 62-65) L. Dudek, G. Gettelfinger, M. Kalish.
LBNE Reconfiguration Workshop – April 2012 FD Assumptions and Cost Estimate 1 Bruce Baller.
LAr1-ND Cryogenics Concept David Montanari Neutrino Cryogenics Requirements Meeting 24 September 2014.
4/5/2005FLARE Cryogenics, RLSchmitt1 Argon Refrigeration Supply Purity.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans S. Pordes Argon Purity1Integrated R & D Plan Review.
WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
Cooling plant upgrade Jose Botelho Direito, Michele Battistin, Stephane Berry, Sebastien Roussee 2 nd SPD Cooling Workshop 30/11/201112nd SPD.
EHN1 Cryogenic Integration Requirements David Montanari / Johan Bremer Jun 18, 2015 Rev. 1.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
Neutrino Cryogenics Requirements Meeting 25/09/2014 Day 1 review.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Installation of the T600 at Fermilab CSN2, September 22,
Cryogenics Fabrication Plans & Constraints David Montanari (on behalf of the CERN Neutrino Cryogenic Group) ProtoDUNEs Meeting Feb 23, 2016.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
EXTRACTION OF HIGH VOLUME CRYOGENIC HEAT LOAD
35 Ton LAr Impurity Distribution Measurements and CFD simulation Erik Voirin – Fermilab – Thermal and Fluids Engineering Group / Engineering.
AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.
Neutrino Platform Proximity Cryogenics Functional Design M.Chalifour 14/04/2016 M. Chalifour - TE/CRG-CI 2.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
ProtoDUNEs Interface documents (NP-02, NP-04) David Montanari (on behalf of Redouan A, Mark A, Johan B, Michel C, Joaquim C, Aurelien D, Kevin H) Apr 14,
Alice TOF Production Readiness Review Gas Control Systems.
Neutrino Platform Proximity Cryogenics 59th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
WA105 6x6x6 Cryogenics David Montanari / Johan Bremer Sep 21, 2015 Rev. 1.
ProtoDUNE Single Phase (NP-04) P&ID David Montanari (on behalf of Mark A, Johan B, Michel C, Joaquim C, Kevin H) CERN Neutrino Platform General Meeting.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
SBND Cryostat Requirements David Montanari, Michael Geynisman, Dimitar Mladenov, Joe Howell 14 October 2015.
Neutrino Platform Proximity Cryogenics 68th EHN1 Cryogenics Integration TE-CRG
Installation of the T600 at Fermilab
Neutrino Platform Proximity Cryogenics 62th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
Overview of the Long-Baseline Neutrino Facility Cryogenic System
Magnet cryogenic system update.
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
protoDUNE – single-phase Instrumentation - Gas Analyzers
Proximity Cryogenics P&IDs meeting
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
M. Chalifour - TE/CRG-CI
SPS cryogenic proximity equipment and SM18 validation
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Warm structure requirements :
CRYOGENICS OPERATIONS 2008 Organized by CERN
Low-Radioactivity Argon Transportation and Storage
Status of Hydrogen System Development
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
Tests of Endcap capillary & Heat exchangers at CERN
Discussion on MERIT Cryogenics Specifications
Cryogenics – The Basics
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Presentation transcript:

Proximity Cryogenics P&IDs Meeting Michel CHALIFOUR (on behalf of the CERN Neutrino Cryogenic Group and David Montanari) Neutrino Platform General Bi-weekly Meeting March 3, 2016 Proto Dune-DP-NP02

Process and Instrument Diagram Operation modes Outline Project Requirements Process and Instrument Diagram Operation modes 03.3.16 Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02

Engineering parameters (from Detector Requirements) Mode Parameter Value Notes 1 GAr purge flow rate 88 m3/hr From 1.2 m/hr 2 Maximum cool-down rate TPC 40 K/hr 10 K/m Maximum Delta T between any two points in the detector 50 K 3 LAr filling flow rate (*) 18 l/min Assuming 2 trucks/day (**) 4 Cryostat static heat leak 3.0 kW GAr boil-off (18 g/s) Other heat loads (estimate) 5.0 kW Total estimate is ~ 8 kW LAr circulation (5 days turnover) 72 l/min (19 gpm) Nominal value (1 pump) 5 Emptying (w both LAr pumps) 144 l/min (38 gpm) Limited by size of tank/truck * Value might be limited by the pressure inside the LAr storage dewar. ** We need to contact the supplier to confirm availability of 2 trucks/day of LAr. Note: Noise, micro phonics and vibrations inside the LAr volume will be studied with an external pump configuration. 03.3.16 Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02

Cryogenic systems Internal Cryogenics (not part of Neutrino Cryogenic group scope): Inside the cryostat. GAr/LAr distribution for cryostat purge, cool down, fill. Interface control document needs to be created in-between proximity and internal cryogenics for physical and functional parameters (eg: temperature sensors/quantity and location for operation, Larg and Garg mass flow rate to cool down, interlock on Temperature, etc...) Proximity Cryogenics: Circulate and purify LAr. Achieve and maintain LAr purity. Recondense and purify boil off GAr. Infrastructure/External Cryogenics: Receive Ar/N2. Transport GAr/LAr, GN2/LN2 to Proximity. Vents. Technical Specification/Tender will cover these 2 parts only 03.3.16 Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02

Modes of operation Piston Purge Cool down Filling Normal operations Before starting piston purge, a purging and flushing of all argon circuits is mandatory GAr is slowly flown from the bottom of the tank to push the impurities out from the top. Cool down A mix of GAr and LAr is flown into sprayers to generate a mist of small liquid droplets that are moved around by another set of sprayers flowing GAr only. Filling Once the cryostat and TPC are cold, LAr is introduced in the cryostat. Normal operations LAr is continuously purified by means of an external LAr pump (2 are installed for redundancy, but only one is in use). Boil-off GAr is recondensed outside of the cryostat and purified before being reintroduced as LAr. Emptying At the end of the operations (or if/when maintenance on the tank is needed), the tank is emptied and the LAr removed. 03.3.16 Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02

Storages tanks & Regeneration system / External Cryogenics LArg storage tank LN2 storage tank Regeneration system 03.3.16 Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02

Filtering system / Proximity Cryogenics Purity monitor LArg filters GArg filter 03.3.16 Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02

Cryostat / Distribution system / Proximity & Internal Cryogenics LN2 Phases Separator Condenser LArg circulating Pump-Optional? LArg circulating pumps LArg Phases Separator Needed? 03.3.16 Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02

Operation Modes 03.3.16 Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02

Operation Mode PURGE IN OPEN LOOP 03.3.16 Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02

03.3.16 Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02

03.3.16 Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02

Operation Mode PURGE IN CLOSED LOOP 03.3.16 Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02

03.3.16 Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02

03.3.16 Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02

Operation Mode COOL DOWN 03.3.16 Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02

03.3.16 Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02

Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02 If needed 03.3.16 Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02

Operation Mode FILLING 03.3.16 Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02

03.3.16 Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02

03.3.16 Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02

Operation Mode NORMAL OPERATION 03.3.16 Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02

03.3.16 Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02

Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02 If needed 03.3.16 Michel CHALIFOUR P&IDs Meeting Proto Dune-DP-NP02

Operation Mode EMPTYING 03.3.16 Michel CHALIFOUR P&IDs Review Proto Dune-NP02

03.3.16 Michel CHALIFOUR P&IDs Review Proto Dune-NP02

03.3.16 Michel CHALIFOUR P&IDs Review Proto Dune-NP02

Operation Mode FILTER REGENERATION 03.3.16 Michel CHALIFOUR P&IDs Review Proto Dune-NP02

03.3.16 Michel CHALIFOUR P&IDs Review Proto Dune-NP02

03.3.16 Michel CHALIFOUR P&IDs Review Proto Dune-NP02