Defense-in-Depth and Mitigative Measures

Slides:



Advertisements
Similar presentations
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Advertisements

Circulating Water System
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
FUKUSHIMA RESPONSE George Attarian 1/21/2013. Fukushima Response Timeline: March 11: Event occurred March 18: INPO IER 11-1 issued (April 15) March 23:
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
Issues Associated with the Development of Severe Accident Management Guidelines for CANDU Reactors Keith Dinnie Director, Risk Management Nuclear Safety.
Thermal-Hydraulic Transient Analysis of the Missouri University Research Reactor (MURR) TRTR Annual Meeting September 17-20, 2007 Dr. Robert C. Nelson1,
NRC PERSPECTIVE ON RELIEF AND SAFETY VALVES Charles G. Hammer Component Performance & Testing Branch Division of Component Integrity Office of Nuclear.
Diesel Generator Reliability: Lessons Learned from Storms
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
TRAMPUS Consultancy Virtual Defense-in-Depth Concept in RPV Integrity Assessment P. Trampus 1st Hungarian-Ukrainian Joint.
Plan 2 – Dead-end Seal Chamber Optional Jacket
GSI-191 Status and Lessons Learned Presented by: Donnie Harrison Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Presented at:
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
Fatigue Management Rule Russell Smith Nuclear Energy Institute (NEI)
FRANKLIN engineering group, inc. Start-up Shutdown Malfunction Plan Development and Implementation Duncan F. Kimbro
ACADs (08-006) Covered Keywords Containment Isolation, actuation logic, Description Supporting Material
What about Japan?. Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Probabilistic Safety Analysis Technology (PSA) TACIS R3.1/91.
March 11, 2011 to Present. Presentation Overview Reactor Design and FeaturesChronology of EventsCurrent Status of Each ReactorRecovery Actions Kashiwazaki-Kariwa.
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
IAEA International Atomic Energy Agency INTRODUCTION Module 2.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Defence in Depth Safety Culture Lecturer.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
Teknologi Pusat Data 12 Data Center Site Infrastructure Tier Standard: Topology Ida Nurhaida, ST., MT. FASILKOM Teknik Informatika.
Low Power and Shutdown PSA IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
Option 2a Template Example Phillip Grissom – Southern Nuclear Based on Farley (more or less)
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Post-Fukushima Severe Accident Management Update Kim, Hyeong Taek KHNP- Central Research Institute July KINS Safety Analysis Symposium.
FLEX Mitigation Strategies Overview (Rec 4.2) Fukushima Regulatory Response Workshop April 5, 2012.
Response to NRC Information Requests for NTTF Recommendation 9.3 Sue Perkins-Grew Director, Emergency Preparedness NEI.
Japanese Nuclear Accident And U.S. Response April 20, 2011.
Industrial Resources, Inc.
EP4P03 Nuclear Power Plant Systems and Operation
BASIC PROFESSIONAL TRAINING COURSE Module XI Operational limits and conditions Case studies Version 1.0, May 2015 This material was prepared.
Thermodynamics Thermal Hydraulics.
Occupational Radiation Protection during High Exposure Operations
Spent Fuel Pool Instrumentation NRC Order EA
Flooding Walkdown Guidance
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
Lesson 24 NATURAL CIRCULATION
Pressurized Water Reactor Owners Group
Pressurized Water Reactor
Diversity analysis for advanced reactor design
Internal Flooding PRA For APR 1400
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions
BASIC PROFESSIONAL TRAINING COURSE Module III Basic principles of nuclear safety Case Studies Version 1.0, May 2015 This material was prepared.
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
MIT Nuclear Reactor Laboratory
Bypass Testing Paul Leonard.
NRC Event Number – Event Date
Matt Bower DWQR Risk Assessment Training 2018
Session Name: Lessons Learned from Mega Projects
Charge 2. Equipment Protection 3. Definition and Documentation
TRTR Briefing September 2013
Pressurized Water Reactor Owners Group
PWR Sump Performance (GSI-191) Industry Workshop
RESOLUTION OF GENERIC SAFETY ISSUE 191
Japanese Nuclear Accident And U.S. Response
Risk-Informing In-Vessel Effects
Version 1.0, May 2015 SHORT COURSE
PWR Sump Performance (GSI-191) Workshop
THE ROLE OF PASSIVE SYSTEMS IN ENHANCING SAFETY AND PREVENTING ACCIDENTS IN ADVANCED REACTORS Moustafa Aziz Nuclear and Radiological Regulatory Authority.
Mikael Olsson Control Engineer
RESOLUTION OF GENERIC SAFETY ISSUE 191
Presentation transcript:

Defense-in-Depth and Mitigative Measures Paul Leonard

Defense-in-Depth (DID) What is Defense-in-Depth? From NUREG-2150, A Proposed Risk Management Regulatory Framework, April 2012 “Defense-in-depth is an element of the NRC’s safety philosophy that employs successive measures to prevent accidents or mitigate damage if a malfunction, accident, or naturally caused event occurs at a nuclear facility. Defense-in-depth is a philosophy used by the NRC to provide redundancy as well as the philosophy of a multiple-barrier approach against fission product releases. The defense-in-depth philosophy ensures that safety will not be wholly dependent on any single element of the design, construction, maintenance, or operation of a nuclear facility. The net effect of incorporating defense-in-depth into design, construction, maintenance, and operation is that the facility tends to be more tolerant of failures and external challenges.”

Application of DID for GL 2004-02 Plants that choose Option 2 or 3 for end of year submittals, DID must be included to provide supporting justification for continued operation for the extended time required to complete actions in support of closure of GL 2004-02 Mitigative measures describes how DID can be implemented at a particular plant There are 2 areas where DID will need to be described, as applicable for the selected closure path Inadequate flow through recirculation strainers Inadequate flow through reactor core

Application of DID for GL 2004-02 NEI submitted a letter, with attachment, to NRC on March 5, 2012 identifying recommended approaches for implementation of DID (ML120730654 and ML120730660) This letter recommended that the following characteristics should be addressed: Multiple means to both detect and mitigate inadequate flow conditions through the recirculation strainer(s) and reactor core should be identified Detection and mitigation measures may utilize non-safety equipment Detection and mitigation measures may credit operator actions provided these actions are directed through procedures A discussion should be included of any general or specific limitations on the application of identified measures (e.g., timing, break size applicability, flows)

Application of DID for GL 2004-02 The attachment to the letter provided examples of DID measures that exist within the industry Many of the measures described currently exist within procedures at plants Bulletin 2003-01 compensatory measures Functional Restoration Procedures (Emergency Operating Procedure (EOP) framework) Severe Accident Mitigation Guidelines (SAMG) Extensive Damage Mitigation Guidelines (B.5.b or EDMG) Plants need to evaluate the DID and mitigative measures that exist at their plant, or could be implemented If additional measures need to be implemented, or could be implemented, then a schedule for implementation should be included in the end of year response

Inadequate Recirculation Strainer Flow Prevention or Delay of Inadequate Flow Condition There are 2 primary methods to prevent or delay an inadequate strainer flow condition Maintain an elevated pool temperature (above the precipitation temperature for chemical effects) Need to be able to monitor temperature in the bulk pool or in systems taking suction on the sump Reduce flow through the strainer(s) This could be pre- or post-transfer to recirculation through selective removal (stopping) of pumps taking suction on the recirculation strainers or not starting these pumps following transfer to recirculation Either option would probably require changes to the EOPs May also require human factors impact evaluation, and training of the Operators

Inadequate Recirculation Strainer Flow Detection of inadequate recirculation strainer flow For non-vented sump designs, monitoring of differential pressure across the strainer With plant instrumentation, either currently existing or that could be installed Containment pressure and pump suction pressure Specifically installed sump instrumentation May also be able to use plant process computer if inputs are provided This could be either real time indication or alarm indication at a pre-determined setpoint Direction for monitoring would need to be in either the EOPs as a continuous action step or through an alarm response procedure

Inadequate Recirculation Strainer Flow Detection of inadequate recirculation strainer flow For vented sump designs, monitoring of differential water level across the strainer With plant instrumentation, either currently existing or that could be installed Containment water level and sump water level (internal to the sump or downstream) Specifically installed sump instrumentation May also be able to use plant process computer if inputs are provided This could be either real time indication or alarm indication at a pre-determined setpoint Direction for monitoring would need to be in either the EOPs as a continuous action step or through an alarm response procedure

Inadequate Recirculation Strainer Flow Detection of inadequate recirculation strainer flow For all sump designs, monitoring of pump distress indication Low flow, pump trip, or low suction pressure alarms Pump discharge indications (flow, pressure) Pump motor amperage (if so equipped) Monitoring for these conditions is normally a part of Operator monitoring of plant equipment which is contained in plant procedures and is an inherent part of Operator training Alarmed indication would be addressed by alarm response procedures and EOPs

Inadequate Recirculation Strainer Flow Mitigation of inadequate recirculation strainer flow Reduction of flow demand on the strainer Typically, EOPs contain specific steps to reduce flow through the systems up to and including stopping all pumps taking suction from the affected strainer Alternation of recirculation trains Applies only to plants that have separated strainers and recirculation sump suctions Most effective if only one strainer train placed in service initially Strainer backwash Can be either a forced backwash or gravity drain backwash (dependent on plant design)

Inadequate Recirculation Strainer Flow Mitigation of inadequate recirculation strainer flow RWT refill and realignment for injection flow Most plants currently have direction in EOPs to initiate makeup to the RWT following transfer to recirculation Onset of inadequate strainer flow not expected for several hours after event (following cooldown) Would provide cooling for extended time since most EOPs direct reducing flow to a value required for decay heat removal If necessary to transfer back to recirculation, can be accomplished at a reduced flow rate with potential for clean screen area as result of stopping flow previously

Inadequate Recirculation Strainer Flow Mitigation of inadequate recirculation strainer flow Injection flow from alternate sources Cross-tying RWTs between units Use of CVCS holdup tanks as a water source to make up to the VCT allowing use of a charging pump for injection flow Use of Appendix R cross-tie capability to supply RCP seal cooling flow paths or direct charging Plants should evaluate what other options may exist at their plant Typically, use of alternate flow paths already contained in procedures

Inadequate Reactor Core Flow Prevention or Delay of Inadequate Flow Condition Maintain an elevated pool temperature (above the precipitation temperature for chemical effects) Use components in the RHR, CS, or systems supplying cooling water to these systems, or combination Would not need to be safety related components Equipment currently used to limit cooldown when on shutdown cooling and when pressurized thermal shock may be a concern Need to be able to monitor temperature in the bulk pool or in systems taking suction on the sump Control (reduce) core flow As discussed in inadequate strainer flow, reduced flow can have a similar positive impact on potential core blockage Also has potential to extend time to formation of chemical precipitates

Inadequate Reactor Core Flow Prevention or Delay of Inadequate Flow Condition Transfer to hot leg injection or combined hot leg / cold leg injection Normally performed 4 to 12 hours following an event Plants that have upper plenum injection and most plants that have multiple hot leg injection paths, the flow rate should be significantly greater than core boil off For plants with limited flow capability, transfer to hot leg injection has potential to disturb debris collected on lower nozzle area Plants would need to evaluate their existing procedures to determine which of these options are or could be instituted Could require new steps in EOPs, evaluation of human factors impacts, and training of the Operators

Inadequate Reactor Core Flow Detection of inadequate core flow Core exit thermocouples (CET) temperature increasing Monitored as part of EOP status trees and safety parameter display system (SPDS) Operators trained to detect increases in CET temperatures and transition to the appropriate EOP for mitigation actions Decreasing reactor water level indication (RVLIS) RVLIS is monitored throughout the EOPs Operators trained to monitor and understand implications of decreasing water level, including transitioning to the appropriate EOP for mitigation

Inadequate Reactor Core Flow Detection of inadequate core flow Increasing containment or auxiliary building radiation levels Typically indicated by alarms in the main control room For an event of this nature, TSC and EOF personnel typically monitor radiation monitors to detect increasing indications EOPs and alarm response procedures direct actions to be taken to mitigate Due to sensitivity of monitors and low alarm setpoints, identification of degrading core conditions occur well before significant release of radioactivity to containment

Inadequate Reactor Core Flow Mitigation of inadequate core flow Transfer to hot leg injection or combined hot leg / cold leg injection flow paths Direction for use of these flow paths are contained in most plants EOPs or SAMGs Establish alternate flow paths If blockage is cause for increasing CET temperatures, most of the currently suggested flow paths may not be effective Alternating between hot and cold leg injection flow paths has potential to disturb the blocking debris bed (along with core boiling) allowing for necessary cooling

Inadequate Reactor Core Flow Mitigation of inadequate core flow Start a reactor coolant pump Currently in most EOPs or SAMGs The slug flow would remove the blockage in the core Implement SAMGs or EDMGs These procedure sets provide additional guidance for addressing inadequate core flow conditions Flood containment above hot and cold leg nozzle (and break location) to provide for convective circulation cooling of the reactor

Additional DID Considerations Plants may have additional capabilities (design features) that are not credited in design basis analyses Debris interceptors Reinforced insulation not previously credited Other debris generation or debris transport features not specifically credited Plants need to evaluate these design features since they can and do provide for some measure of defense-in-depth

Actions to Support DID Measures PWROG Involvement It may be worthwhile for the Industry to obtain assistance from the PWROG to establish specific steps or actions in the EOPs through changes or additions to the Emergency Response Guidelines (ERG) framework This type of approach was taken for development of the compensatory measures established in response to Bulletin 2003-01 This would simplify the process for plants that desire to make changes to the EOPs to implement some of these DID measures PWROG Response ---

Conclusion May be significant scope of work for plants to fully establish the DID measures available to them As stated previously, if a DID measure does not currently exist, but a plant desires to implement at a future date, ensure the implementation schedule is included in the end of year response