IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)

Slides:



Advertisements
Similar presentations
IMT-Advanced Technical Requirements Summary of status after 22 nd Meeting of WP8F.
Advertisements

To consider additional spectrum allocations to the mobile service on a primary basis and identification of additional frequency bands for International.
Overview of ITU Standards For Broadband Bilel Jamoussi, ITU.
Fostering worldwide interoperabilityGeneva, July 2009 IMT Standardization activities Colin Langtry, Radiocommunication Bureau, ITU Global Standards.
WMO Workshop on Radio Frequencies for Meteorology Meteorological Satellite Services David F. McGinnis U.S. Dept. of Commerce, NOAA 7 October 2002 Geneva,
LTE rollout: spectrum challenges
NATIONAL INFORMATION AND COMMUNICATIONS TECHNOLOGY AUTHORITY In-country Preparatory Meeting 04 th June 2015, NICTA HQ WRC-15 Issues WRC 15: PNG Preparatory.
IMT activities in ITU-R DOCUMENT #:GSC13-PLEN-13 FOR:Presentation SOURCE:ITU-R AGENDA ITEM:Plenary 6.1 CONTACT(S):Kevin Hughes Submission Date: July 1,
Committed to Connecting the World For the last 25 years, ITU has been coordinating the development of a global broadband multimedia international mobile.
Activities of ARIB on IMT Standards Kohei SATOH Association of Radio Industries and Businesses (ARIB) DOCUMENT #:GSC13-Plenary-60 FOR:Presentation SOURCE:Kohei.
A Global View on Spectrum for IMT-2000
ITU-R WP 5D Update Orlett W. Pearson, Report to TR-45.5 August 2012.
Doc.: IEEE /1537r1 Submission January 2016 Rich Kennedy, Unlicensed Spectrum Advocates, LLCSlide 1 IEEE Regulatory State of Affairs Date:
WRC–12 Industry Debrief 23 April 2012 Agenda item 8.2 – Future WRC Agendas.
Fostering worldwide interoperabilityGeneva, July 2009 GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Global Standards Collaboration.
Jeju, 13 – 16 May 2013Standards for Shared ICT Update of ARIB Activities on IMT Standardization Yoshihide ISHIDA Director, Land Mobile Communications Group,
GSC IMT Task Force Report Kohei SATOH ARIB DOCUMENT #:GSC13-PLEN-64r1 FOR:Presentation SOURCE:Kohei Satoh (ARIB) AGENDA ITEM:GRSC (7); Plenary (6.1) CONTACT(S):Kohei.
Decisions of RA-15 and WRC-15 with Special Relevance to Developing Countries Решения AR-15 и ВКР-15 в особенности касающиеся развивающихся стран Иштван.
CRAF POSITION ON WRC-19 AGENDA ITEMS RELEVANT TO RADIO ASTRONOMY Talayeh Hezareh - CRAF FM Max Planck Institute for Radio astronomy Bonn, Germany MAY 20,
International Telecommunication Union Document WRC-15-IRWSP-15/14-E 1 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION.
Delivering the standards and spectrum to fuel 5G
ITU-R activities on WRC-19 AI 1.12
Preparations for WRC-12 WRC -12 AGENDA ITEM 1.3 ON UAS
broadband applications, in accordance with Resolution 233 (WRC-12)
Cindy Cook Chairman, TG 5/1 November 2, 2016
HEADING FOR SLIDE Sub Heading
Steering Group on Radio Frequency Coordination (SG-RFC)
GSC IMT Task Force Report
Sept 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for July 2017] Date.
WRC Agenda Item 1.1 to consider additional spectrum allocations to the mobile service on a primary basis and identification of additional frequency bands.
Panel Session 3 WRC-15 Agenda item 1.1
Month Year doc.: IEEE yy/xxxxr0 November 2017
ITS-Related Work Items in ITU-R Study Group 5, Working Party 5A
5G - IMT-2020 Technology.
Panel Session 4 WRC-15 Agenda items 1. 2 and 1. 3 (incl
WRC-07 decisions and follow-up
WRC-12 A.I. 1.3 Eric ALLAIX DGAC-DSNA.
5G and IMT Identification - Views from CEPT-
IMT-Advanced Opening Report
doc.: IEEE <doc#>
September 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Regulatory activity above 275 GHz in.
Submission Title: [WG-Regulatory Report November07]
Document No: GSC(14)18_018 Source: ITU-R SGD Contact: Colin LANGTRY
IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)
July 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for July 2017] Date.
IEEE Motion for Consent Agenda
ITU Radio Issues in 2003 Progress Report ITU-R GSC /01/2019
Draft ICAO Position for ITU WRC-19
SADC WRC-15 Preparatory Meeting
François Rancy Director, ITU Radiocommunication Bureau
Sergio Buonomo Counselor ITU-R Study Group 5
IMT-Advanced Technical Requirements
François Rancy Director, ITU Radiocommunication Bureau
Update of ARIB Activities on IMT Standardization
World Radiocommunications Conference
IMT-Advanced Opening Report
IEEE Motion for Consent Agenda
Month Year doc.: IEEE yy/xxxxr0 May 2019
Activities of ARIB on IMT Standards
Document No: GSC(14)18_018 Source: ITU-R SGD Contact: Colin LANGTRY
GSC IMT Task Force Report
Possible Future Agenda Items
TTA activities on IMT-Advanced Standardization
Current Status of submission about EUHT
TTA Activities on IMT-Advanced standardization
Agenda Item Overview & draft India proposal
Inmarsat Position on WRC-19 Agenda Item 9.1 Issue 9.1.1
GSC position on key WRC-19 AI 1.5 ESIMs
Preliminary GSC positions on WRC-19 agenda items 1.13 IMT
Month Year doc.: IEEE yy/xxxxr0 May 2019
Presentation transcript:

IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016) ec-16-0097-01-5GSG IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016) Summarizing the status following the 24th meeting of ITU-R Working Party 5D (Geneva, 14-22 June 2016) José Costa (jose.costa@ericsson.com)

Outline Background: Previous reports Summary of WRC-15 results Resolution ITU-R 65: Principles for the process ITU-R Circular Letter 5/LCCE/59: Invitation for proposals and their evaluation Submission, evaluation process and consensus building for IMT-2020 – Addendum to Circular Letter 5/LCCE/59 Draft new Report ITU-R M.[IMT-2020.TECH PERF REQ] Draft new Report ITU-R M.[IMT-2020.SUBMISSION] Draft new Report ITU-R M.[IMT-2020.EVAL] Other information: Update of the processes for IMT-2000 and IMT-Advanced

Background: Previous reports https://mentor.ieee.org/802-ec/dcn/16/ec-16-0095-00-5GSG-report-on-itu-r-wp-5d-meeting-24.pdf https://mentor.ieee.org/802-ec/dcn/16/ec-16-0010-00-00EC-5g-and-imt-2020.pdf https://mentor.ieee.org/802-ec/dcn/16/ec-16-0034-00-5GSG-summary-of-itu-r-wp-5d-meeting-23.pdf

WRC-15 agenda items 1.1 (IMT) and 1.2 (Region 1) Summary of WRC-15 results: the following radio frequency bands / ranges were newly identified for International Mobile Telecommunication (IMT) to various degrees in countries. Frequency bands / ranges Remarks 470 – 694 / 698 MHz (600 MHz) 694 – 790 MHz (700 MHz) 1427 – 1518 MHz (L-band) 3300 – 3400 MHz 3400 – 3600 MHz (C-band) 3600 – 3700 MHz (C-band) 4800 – 4990 MHz In parts, in some countries in Americas, and in Asia-Pacific. Global band, now also in Region 1, a result out of WRC-12 decisions. Global band, in most countries. Global band, in many countries, not in Europe / North America. Global band, now in most countries, already allocated in Europe. Global band, in many countries, not in Africa / some in Asia-Pacific. Some few countries in Asia-Pacific and Uruguay.

All bands identified for IMT in the ITU RR Band (MHz) Footnotes identifying the band for IMT 450-470 5.286AA 470-698 MHz 5.295, 5.296A, 5.308A 698-960 5.313A, 5.317A 1 427-1 518 MHz 5.341A, 5.341B. 5.341C, 5.346, 5.346A 1 710-2 025 5.384A, 5.388 2 110-2 200 5.388 2 300-2 400 5.384A 2 500-2 690 3 300-3 400 MHz 5.429B, 5.429D, 5.429F 3 400-3 600 5.430A, 5.431B, 5.432A, 5.432B, 5.433A 3 600-3 700 MHz 5.434 4 800-4 990 MHz 5.441A , 5.441B

WRC-19 agenda item 1.13 to consider identification of frequency bands for the future development of International Mobile Telecommunications (IMT), including possible additional allocations to the mobile service on a primary basis, in accordance with: Resolution 238 (WRC‑15) … to conduct and complete in time for WRC‑19 the appropriate sharing and compatibility studies, taking into account the protection of services to which the band is allocated on a primary basis, for the frequency bands: 24.25-27.5 GHz, 37-40.5 GHz, 42.5-43.5 GHz, 45.5-47 GHz, 47.2-50.2 GHz, 50.4-52.6 GHz, 66-76 GHz and 81-86 GHz, which have allocations to the mobile service on a primary basis; and 31.8-33.4 GHz, 40.5-42.5 GHz and 47-47.2 GHz, which may require additional allocations to the mobile service on a primary basis.

Another relevant agenda item: WRC-19 agenda item 1.16 to consider issues related to wireless access systems, including radio local area networks (WAS/RLAN), in the frequency bands between 5 150 MHz and 5 925 MHz, and take the appropriate regulatory actions, including additional spectrum allocations to the mobile service, in accordance with: Resolution 239 (WRC‑15) “Studies concerning Wireless Access Systems including radio local area networks in the frequency bands between 5 150 MHz and 5 925 MHz”

Resolution 239 (WRC-15) – resolves … a) to study WAS/RLAN technical characteristics and operational requirements in the 5 GHz frequency range; b) to conduct studies with a view to identify potential WAS/RLAN mitigation techniques to facilitate sharing with incumbent systems in the frequency bands 5 150 – 5 350 MHz, 5 350 – 5 470 MHz, 5 725 – 5 850 MHz and 5 850 – 5 925 MHz, while ensuring the protection of incumbent services including their current – and planned use; c) to perform sharing and compatibility studies between WAS/RLAN applications and incumbent services in the frequency band 5 150 – 5 350 MHz with the possibility of enabling outdoor WAS/RLAN operations including possible associated conditions; d) to conduct further sharing and compatibility studies between WAS/RLAN applications and incumbent services addressing: i) whether any additional mitigation techniques in the frequency band 5 350 – 5 470 MHz beyond those analyzed in the studies referred to in recognizing a) would provide coexistence between WAS/RLAN systems and EESS (active) and SRS (active) systems; ii) whether any mitigation techniques in the frequency band 5 350 – 5 470 MHz would provide compatibility between WAS/RLAN systems and radio determination systems; iii) whether the results of studies under points i) and ii) would enable an allocation of the frequency band 5 350 – 5 470 MHz to the mobile service with a view to accommodating WAS/RLAN use; e) to also conduct detailed sharing and compatibility studies, including mitigation techniques, between WAS/RLAN and incumbent services in the frequency band 5 725 – 5 850 MHz with a view to enabling a mobile service allocation to accommodate WAS/RLAN use; f) to also conduct detailed sharing and compatibility studies, including mitigation techniques, between WAS/RLAN and incumbent services in the frequency band 5 850 – 5 925 MHz with a view to accommodating WAS/RLAN use under the existing primary mobile service allocation while not imposing any additional constraints on the existing services,

Submission, evaluation process and consensus building for IMT-2020 IMT-2020 submission and evaluation process http://www.itu.int/en/ITU-R/study-groups/rsg5/rwp5d/imt-2020/Pages/submission-eval.aspx Time schedule Process

Schedule for the development of IMT-2020 radio interface Recommendations

IMT-2020 terrestrial component radio interface development process

Draft new Report ITU-R M.[IMT-2020.TECH PERF REQ] Minimum Requirements related to technical performance for IMT-2020 radio interface(s): Peak data rate Peak spectral efficiency User experienced data rate 5th percentile user spectral efficiency Average spectral efficiency Area traffic capacity Latency Connection density Energy efficiency Reliability Mobility Mobility interruption time Bandwidth Planned completion: WP 5D Meeting No. 26 (February, 2017)

Draft new Report ITU-R M.[IMT-2020.SUBMISSION] Requirements, evaluation criteria and submission templates for the development of IMT-2020. This ITU-R Report will address the requirements, evaluation criteria, as well as submission templates required for a complete submission of candidate radio interface technologies (RITs) and candidate sets of radio interface technologies (SRITs) for IMT-2020. Planned completion: WP 5D Meeting No. 27 (June 2017).

Draft new Report ITU-R M.[IMT-2020.EVAL] Guidelines for evaluation of radio interface technologies for IMT-2020. This Report is to provide guidelines for both the procedure and the criteria (technical, spectrum and service) to be used in evaluating the proposed IMT-2020 radio interface technologies (RITs) or Sets of RITs (SRITs) for a number of test environments and deployment scenarios for evaluation. The test environments are chosen to simulate closely the more stringent radio operating environments. The evaluation procedure is designed in such a way that the overall performance of the candidate RIT/SRITs may be fairly and equally assessed on a technical basis. It ensures that the overall IMT 2020 objectives are met. Planned completion: WP 5D Meeting: Meeting No. 27 (June 2017).

Other information: Update of the processes for IMT-2000 and IMT-Advanced Update of the process for IMT-2000 (TEMP/101, 102) Documents IMT-2000/2(Rev.2) and IMT-2000/3(Rev.2): Update of the process for IMT-Advanced (TEMP/103, 104) Documents IMT-ADV/24 (Rev.3) and IMT-ADV/25 (Rev.2)