FTK infrastructure in USA15 Status and plans for 2015 A

Slides:



Advertisements
Similar presentations
Goals and status of the ATLAS VME Replacement Working Group Markus Joos, CERN Based on slides prepared by Guy Perrot, LAPP 19/09/2012.
Advertisements

C. Fernández Bedoya, A. Navarro, I. Redondo. C. Fernández Bedoya November 29th, Goal: Replace SC crate with simple CuOF electronics and place TSC.
Shelf Management & IPMI SRS related activities
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
M. Joos, PH/ESE1 ATCA for ATLAS - status Activities of the working group PH/ESE xTCA evaluation project Next steps.
BWS electronics design status J.Emery & Luca, Pierre-Jean, Emiliano, Jose, Alexander and all past contributors!
Status of NA62 straw electronics Webs Covers Services Readout.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
ATCA cooling tests Claudio Bortolin (PH-ADO) Damian Dyngosz (PH-DT) George Glonti (PH-UAT) Julian Maxim Mendez (PH-ESE) Lukasz Zwalinski (PH-DT) xTCA IG.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
ATCA COOLING PROJECT INTERSHIP FINAL PRESENTATION Piotr Koziol.
System Demonstrator: status & planning The system demonstrator starts as “vertical slice”: The vertical slice will grow to include all FTK functions, but.
AEON 4000 Including the SMPS 4000 rectifier and the AEON Gold Alarm & Monitoring Unit.
Status of integration in USA15. Status of rack layout 20/03/2015FTK Italia - A. Lanza2 Rack Y A2 equipped with turbine cooling system and nominal.
Status of FTK & requests 2013 Paola Giannetti, INFN Pisa, for the FTK Group ATLAS Italia, Sep 5, 2012 Status of FTK work IMOU NEWS & Future steps TDR with.
News on FTK rack infrastructure A. Lanza – INFN Pavia FTK Italy meeting –
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
FTK crates, power supplies and cooling issues 13/03/20131FTK-IAPP workshop - A. Lanza  Racks, crates and PS: requirements  Wiener crates  Rittal crates.
AMBFTK Report AMBFTK: problems to solve Power distribution: Crates – compatibility with CDF crates? Thermal dissipation: Cooling Signals I/O:
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
The Maraton LV system Michela Lenzi INFN Firenze Thanks to V. Bocci, P. Ciambrone, A. Sciubba LV Power Supply RCM AC/DC converter.
S A Griffiths CM42 June 2015 Electrical & Control.
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
Poseidon 4002 Rack monitoring.
Firmware development for the AM Board
Chapter 1: Introduction to the Personal Computer
Status of the CERN ATCA specification and tender
T-simulation OUTLINE Inputs to the T-simulation: chips, boards, crate mechanics and fan T-simulation performed into two steps: On large scale: simple AM.
Status & Plans for WA105 Control System
FTK: update on progress, problems, need
Software Overview Sonja Vrcic
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
MICE RF System Power Supplies, Control and Monitoring Status report
LKr status R. Fantechi.
Rack Design Proposal as of 01/03/2013
Calorimeter Mu2e Development electronics Front-end Review
Project definition and organization milestones & work-plan
ProtoDUNE SP – Slow control Status
General aspects: Optical links :
Institute of Nuclear Physics Polish Academy of Sciences
AM system Status & Racks/crates issues
Injectors BLM system: PS Ring installation at EYETS
T1 Electronic status Conclusions Electronics Cards:
EMU Slice Test Run Plan a working document.
Instructor Materials Chapter 1: Introduction to the Personal Computer
SCT/Pixel Draft Rack Layout rcj
Front-end electronic system for large area photomultipliers readout
Robert Gomez-Reino Garrido
Radiation- and Magnet field- Tolerant Power Supply System
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
ATLAS USA15 - Rack 52U with 9U crates, remote PS
TileCal ROD Commissioning Counting Room Installation
TPC Detector Control System
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
KICK OFF meeting - project presentation
Pierluigi Paolucci & Giovanni Polese
Command and Data Handling
Presentation transcript:

FTK infrastructure in USA15 Status and plans for 2015 A FTK infrastructure in USA15 Status and plans for 2015 A. Lanza – INFN Pavia FDR FTK AMB – CERN May 6th, 2015

(almost) Final core rack layout The four core racks will be equipped with two crates (not a news) Number of fan trays per crate is still undetermined, could be one on top, one on bottom or both The power supply is still an open issue. At this moment Wiener is not able to give us a PS with enough power serving two crates in one rack, while CAEN has not yet delivered its custom prototype The PS choice will have an impact on the fan tray choice. The Wiener Hyper Blower (HB) is not compatible with the CAEN PS 06/05/2015 FDR of FTK AMB - A. Lanza

But for the tests in 2015 … … we will equip two racks with one crate each in two different setups: one rack equipped with the Wiener system, with the possibility of placing a second fan tray on top of the crate (almost ready now) another rack equipped with the Wiener bin combined with the CAEN PS. Like the first setup, a second fan tray can be placed on top of the crate (ready in September) Both setups will be used for comparative cooling tests with a small number of boards (16 AMB + 16 AUX + 4 SSB) They will also be used to test the boards themselves and for taking data with them The fan tray on bottom of the Wiener system is of the HB type. Fan trays on top of crates in both systems can only be of custom design, for mechanical incompatibility of the HB, as well as the one on top of the Wiener crate using the CAEN PS 06/05/2015 FDR of FTK AMB - A. Lanza

Status of Integration Projects – 1 CAEN Power Supply Main specifications: 2 independent channels supplying 48V, 24V and 5V Each channel 48V@150A, 24V@35A, 5V@120A, total power 8.64kW/channel INPUT voltage separated for each channel, 3-phase 5 poles OUTPUT connectors made of M13 bolts, minimum distance among bolts 5 cm External interface implemented remotely by means of the Ethernet (SNMP) protocol and locally by means of a manual display Local/Remote controls: V/I monitor and ON/OFF for each voltage output Dimensions: 19” large, 9U tall and 680 mm deep EU conformity marking One sample ordered Delivery expected by next August 06/05/2015 FDR of FTK AMB - A. Lanza

Status of Integration Projects - 2 Custom fan tray A custom fan tray is necessary because of the incompatibility of the Wiener HB with the CAEN PS. This project begun after the last review Chosen fan type: Sanyo Denki 9GV1224P1J011, 24VDC (for compatibility with the Wiener HB), 6.35 m3/min max air flow [5.92 the HB], 360 Pa max static pressure [360 the HB], pulse sensor for speed monitoring [no HB], 25kHz PWM for speed control [no HB], expected lifetime 40k hours [35k for HB], reduced cost Mechanics is different for the bottom and top versions, in order to leave 1U of open space between the fans and the bin Electronic Controls and Monitor is implemented with an Arduino microcontroller, Mega 2560 type, equipped with a local display for every fan tray DCS is performed by means of a CANBus interface. Local/remote ON/OFF, four speeds (40%, 60%, 80% and 100%) settable within three different horizontal groups of fans, six T sensors positioned inside the fan tray to monitor the environmental temperature 06/05/2015 FDR of FTK AMB - A. Lanza

Fan tray project – µController schematics 06/05/2015 FDR of FTK AMB - A. Lanza

Fan tray project – Power distribution schematics 06/05/2015 FDR of FTK AMB - A. Lanza

Fan tray project – Layouts µcontroller board Power distribution board 06/05/2015 FDR of FTK AMB - A. Lanza

Fan tray project – Demonstrator To the right the demonstrator of the functionality of the project, composed of the final display, a connectivity breadboard, the Arduino µcontroller and three final fans. The displayed parameters are the generated by the wiritten firmware running on the Arduino 06/05/2015 FDR of FTK AMB - A. Lanza

DCS Implementing the solution recommended by the ATLAS DCS coordination: 2 LCS: one for the ATCA crates and the other for the VME crates. They will be linked to the TDAQ SCS (Subdetector Control System). Racks will be monitored via the CIC (Common Infrastructure and Control) system The VME LCS will collect data from: the custom fan trays (Arduino µcontrollers) via CANBus. Needed to develop low level communication protocol over the CANBus (set/get fan values) Wiener fan trays and PS (if used) or CAEN PS via Ethernet. WinCC interface modules are already available LAMBs (T sensors) via a dedicated application running in the SBC. Protocol to use will be probably SNMP Tests will be done in Blg 4 Lab (during the ATLAS run) and then in USA15 06/05/2015 FDR of FTK AMB - A. Lanza

Thermal simulations of core crates and racks Up to now thermal simulations were provided by IMEC, which modeled a single Wiener VME crate together with the AMchip and the AMB and LAMB boards, and performed simulations of a VME crate fully loaded of AMBs and LAMBs under different conditions of fan speed and air flow Recently we purchased an Icepack licence, the Ansys simulation package used by IMEC, to continue the work done by them. A team of two engineers from University of Parma will take care of using this package and running it on a computer (20 CPUs, 128 GB RAM, 16 TB SS disk + hard disk) specifically dedicated to thermal simulations We are still solving a technical problem (the computer IP must be an INFN one, while it is at the moment UniPR) to be allowed to install Icepack Once the package will be installed, our plan is: Replicate the results got by IMEC on the single crate in the same conditions; Simulate a crate with two fan trays (on bottom and on top), introducing the custom fan tray and also varying the distance between fans and crate Try to simulate, if the computer power will allow it in a reasonable time, a full rack with two systems and the turbine on top, to see what could be the flow perturbation introduced by it. 06/05/2015 FDR of FTK AMB - A. Lanza

Detailed Time Schedule 06/05/2015 FDR of FTK AMB - A. Lanza