Online Monitoring : Detector and Performance check

Slides:



Advertisements
Similar presentations
Electromagnetic shower in the AHCAL selection criteria data / MonteCarlo comparison of: handling linearity shower shapes CALICE collaboration meeting may.
Advertisements

2 Introduction   MiniCal test-beam studies started at the beginning of March (till March 6 we only had 17 APD’s, then 33 APD’s)   A few days were.
November 3rd, 2006 CALICE-UK, Manchester - A.-M. Magnan - 1 Noise studies DESY + CERN TB overview Anne-Marie Magnan Imperial College London.
1 Online data quality and monitoring M. Ellis Daresbury DAQ Meeting 31 st August 2005.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
Anne-Marie Magnan Imperial College London CALICE Si-W EM calorimeter Preliminary Results of the testbeams st part On behalf of the CALICE Collaboration.
Anne-Marie Magnan Imperial College London Kobe, May 11th, 2007 Calice meeting --- Anne-Marie Magnan 1 Status of MC reconstruction MC Reconstruction Chain.
1 Calice Analysis Meeting 13/02/07David Ward Just a collection of thoughts to guide us in planning electron analysis In order to end up with a coherent.
More on Testbeam Analysis FLZ. Stability Checks for TCMT Pedestal stability already shown by Kurt MIP calibration stability Response stability.
1 Calice UK Analysis Meeting 23/1/07David Ward/Nige Watson UK Analysis tasks (WP1) David Ward Nige Watson TexPoint fonts used in EMF. Read the TexPoint.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
HPS Online Software Discussion Jeremy McCormick, SLAC Status and Plans.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
1 N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Operation and performance of the NESTOR test detector.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
Combined HEC/EMEC testbeam data can be read and analyzed within the ATLAS Athena framework A “cookbook” gives an introduction for how to access the data.
STAR Collaboration Meeting, BNL, Feb 2005 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software update L3 display 200 GeV February.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Online Reconstruction 1M.Ellis - CM th October 2008.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
12 October 2001, M. LefebvreHEC-Athena Tutorial: HEC beam test primer1 HEC Beam Test Primer Production modules of the HEC have been tested in particle.
Michele de Gruttola 2008 Report: Online to Offline tool for non event data data transferring using database.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
Nantes — 2008, July Analysis of results from EmCal beam test at CERN PS (and SPS) energies P. La Rocca & F. Riggi University & INFN Catania University.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
Jin Huang Ph.D. Candidate Massachusetts Institute of Technology.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
G. Eigen, Paris, Introduction The SiPM response is non-linear and depends on operating voltage (V-V bd ) and temperature  SiPMs need monitoring.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
1 Calice TB Review DESY 15/6/06D.R. Ward David Ward Post mortem on May’06 DESY running. What’s still needed for DESY analysis? What’s needed for CERN data.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
A Study on Leakage and Energy Resolution
ATLAS Tile Calorimeter Data Quality Assessment and Performance
Analysis of LumiCal data from the 2010 testbeam
Calorimeter Status Electronics Installation and Commissioning
Status of Monitoring Tom Coates AIDA-2020 Annual Meeting DESY
Beam test of Silicon-Tungsten Calorimeter Prototype
DQM4HEP Monitoring Status Tom Coates AIDA-2020 Second Annual Meeting
GRAPES-3: Status of ROOT Based Monitoring and Analysis
Marian Ivanov TPC status report.
CLAS12 Commissioning with Cosmincs
The Simulation Status of SDHCAL
Muon stopping target optimization
Commissioning of the ALICE HLT, TPC and PHOS systems
DAQ status and plans DAQ Hardware Moving stage (MIP calibration)
ScECAL+AHCAL+TCMT Combined Beam FNAL
Test Beam Measurements october – november, 2016
E. Garutti - Main Meeting
DQM for the RPC subdetector
Testbeam analysis on module #1
Michele Faucci Giannelli
Presentation transcript:

Online Monitoring : Detector and Performance check Towards a 1m3 engineering prototype Detector check LED (Gain stability) Pedestal stability Online Monitoring Tools and software Performance check Physics : Reconstructed observables Picture © Ali Eldwan Brianne AHCAL Main Meeting Hamburg, 17/12/2014

Detector check Goal : Monitor the gain during running period Use of the full integrated LED calibration system : Checks during detector commissioning Check after transfer into the beam area Checks on a daily basis by doing a Pedestal/LED run 1.6 x 0.8 mm² (0603)

Gain/Pedestal checks Checked Gain between several periods DESY Commissioning / First Period DESY Commissioning / Second Period First Period / Second Period Checked Pedestal between the 2 periods

Gain Correlation DESY/First Period Gain stable Shift to the right : Temperature changed between Commissioning and October (was hotter during summer)

Gain Correlation DESY / Second Period Good correlation Still shift to the right – Still with Temperature difference

Gain Correlation 1st Period / 2nd Period Good correlation also Coherent between the 2 periods Light shift upwards → Need further investigations

Pedestal/Gain Stability Pedestal/Gain along the November Period Stable Gain and Pedestal during the November Period We have the control of our electronics!!! Let's go further → Physics

Data Reconstruction Current status (Lan's talk) : Use of these tools for “Online Monitoring” Run of an automatic shell script that do the reconstruction on the data every X minutes using a local copy of the database “Semi-Online” Reconstruction (Marlin Framework) Raw Data Event Building Database Reco Rootfile Monitoring : Shower profile, Energy, T0s... Monitoring : Rates, Raw ADC/TDC

Performance Check Needs to look at the useful observables for different types of runs (electrons, muons, pions..) Relevant Observables : Energy Sum and profile Shower profiles, Beam profile Noise (Number of Hits over 0.25 & 0.5 MIPs) Temperature Monitoring Lots of others... Goal : Check the physics performance during data taking

“Online Monitoring” software Interfaced with current tools (still in development) User-friendly ROOT GUI / Python (Thanks to Shaojun) Steerable by xml (File directory, Number of Layers...)

Hit Rate Hit rate in MIP Hit rate and distribution for each layers (Number of hits over 0.25 & 0.5 MIPs) See directly 'noisy' layers

T0s Correlations T0s are needed for TDC calibration later on Need to monitor them → better event selection In the last Testbeam : 2 T0s on 2 small layers and 2 T0s per big layers T0s against each other on the same layer 1 T0 not working on Layer 14 T0s disconnected on Layer 9

T0s Difference Difference of the TDC of the T0s on the same layer Expect a pic around 0 if the T0s trigger at the same time

Energy Sum First Check for Energy Sum distribution and per event Give a good idea of the performance of the detector Run 20323 - Muons

Shower profile, radius.. Energy profile for each layer, Cog in x, y, z (energy weighted) and mean shower radius, beam profile. Run 20249 – Pions

Conclusion & Outlook Very Stable Gain/Pedestal during TB Periods Still some minor bugs to be corrected Can be useful for comparing different runs Anything can be implemented Needs to be tested at the next beam period Next steps : Do reconstruction on event by event basis (LCIO Standalone) using the tools we have already Running over only updated events Integrate with EUDAQ?

Thank you for your attention