Filter drilling status

Slides:



Advertisements
Similar presentations
SPD cooling Test bench Preliminary results CERN (Geneva) A.Francescon Università & INFN Padova 1.
Advertisements

Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
JET PROPULSION Part 5 Jet Engine Operation Oil Systems.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
July 29, Update on the HBD Gas System Modifications Robert Pisani Brookhaven National Laboratory.
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
+ FLOW RATE ISSUES IN THE ALICE SPD COOLING Rosario Turrisi A.
Some Recent BNL, LBNL and Yale Work 1.Honeycomb flatness from manufacturer 2.Commercially fabricated C-channel 3.VCR Fittings 4.BN powder thermal evaluations.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
The Stripping Foil Test Stand in the Linac4 Transfer Line
CLAUDIO BORTOLIN SPD Cooling Status INFN – PD / CERN.
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB Mk7 Expansion PCB.
Claudio Bortolin – CERN. Y. Lesenechal started some tests last week (drill, twisted wire and a lot of patience): Ø ~ 1,2 mm Twisted wire + carbide drill.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Steering committee Mechanics 29/07/ KM3NeT steering committee Edward Berbee - nikhef 2 DU-1 pictures at CPPM.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
1 CERN - 19/03/2016 Claudio Bortolin CLAUDIO BORTOLIN INFN – PD / CERN.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
Submitted by Pradeep pataskar Roll no.11031M02034.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
Fluid Mechanics for Chemical Engineers Arif Hussain (Lecturer)
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
+ ALICE SPD COOLING CRITICAL ISSUES Rosario Turrisi.
BGV 23-feb-2016CERNMassimiliano Ferro-Luzzi 1 BGV cooling : status and plans reporting on behalf of EN-CV (Sylvain Nichilo & Olivier Crespo-Lopez)
Chapter 4 Training Package HCFC Phase-out RACSS – UNEP 2014 Servicing of HCFC/HFC Based Air-conditioners.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
BioTector COD TOC TN analyzer
The BioTector B7000i TOC analyzer with integrated oxygen concentrator
Feedback on transfer line sizing and flow calculations for UT
Stato del sistema di raffreddamento del rivelatore SPD di ALICE
University of Colorado – Boulder
Summary of TS2 activities on CO2 vacuum insulated lines on YB0
S.Movchan Straw manufacturing and QC
He Plant, LN2 Systems and Commissioing
Ti/SS transitions A.Basti INFN-PISA*
Rosario Turrisi INFN Padova
DESY Experiences on Use of Gas overlay during Assemblies
Flexible lines production and planning
Performance of a CO2 System with Four Parallel Pipes
Pixel cooling specifications
Update on the IBL vacuum flex transfer lines
ITS Cooling: Xmas Plan Claudio Bortolin.
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Aachen Status Report: CO2 Cooling for the CMS Tracker
Integration issues at IHEP
Flexible lines assembly
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
update on UT cooling system
Far Detector Activities Late 2017 – Early 2018
Pierre-Alexandre Thonet
Update on the IBL vacuum flex transfer lines
Pixel CO2 Cooling Status
Recirculating CO2 System
The BioTector B3500ul TOC analyzer Process Tests
Horizontal Installation Overview
Aachen Status Report: CO2 Cooling for the CMS Tracker
Università di Udine / INFN – PD / CERN
PLUMBING MATERIALS, PIPE BENDING AND PRESSURE TESTING
November technical stop activities:
Cryomodule Assembly Plan
Presentation transcript:

Filter drilling status Claudio Bortolin Andrea Francescon Yannick Lesenechal Samuel Rambaut Rosario Turrisi

The picture Reminder Some pollution went into the lines It had to go through molecular sieve/hydrofilter of the plant (2 μm filter was installed after 1 year run) and/or It had to go through the first 60 μm inline filter and clog (and partly go through) the second inline filter The second clogged filter cannot be replaced (have to disassembly the experiment) and causes: less flow pressure drop The liquid heats up to room temperature along the path to the detector (~40 meters) – this was not a problem, if alone The combination of the last two causes: less flow in the single line  worse performance in the sector bubbling before the capillaries  local and occasional loss of performance

The environment Reminder Layout of the PP4-PP3 pipe Access point (2) Target point See next slide for a zoom-in

The target Reminder D X T Filter Swagelok SS-4-VCR-2-60M L S D = 5.6 mm T = 11.8 mm X = 0.7 mm (~1 mm in the filtering area) S = 4 mm L = ~4500 mm D X T Filter Swagelok SS-4-VCR-2-60M L S Pipe: SS 316L 4-6 mm i-o diameter Swagelok 316 SS VCR Face Seal Fitting, 1/4 in. Female/Male Nut: SS-4-VCR-1 & SS-4-VCR-1 Swagelok gland 6LV-4-VCR-3-6MTB7 SEM picture of the filter

Tools Reminder Drilling: Cleaning: tungsten carbide tip welded on twisted ss cable drill to operate the rotation counter-flow at 200 mbar w/manometer to detect the presence of the hole Cleaning: rilsan pipe connected to a rotary vane vacuum pump magnet tip on twisted ss cable cleaning machine to force counter-flow wise a cleaning fluid

Reminder Edwards RV3 rotary vane 2-stage pump magnet cleaning machine Ø 2.5 mm ss twisted cable tungsten carbide 5-faces tip Ø 2.5 mm ss twisted cable

Procedure Reminder TESTED DRILLING > 100 FILTERS ! Pre-drilling cleaning remove particles in the pipe same procedure as cleaning Drilling: rotation of the tool inside the pipe by the drill pressure drop (~20-30 mbar) on a manometer with specific trend when hole done Cleaning: suction of drilling remains with small pipe inside the stainless steel pipe (down to the filter) and vacuum pump ‘’walk’’ with magnet inside the pipe the steel of the filter is slightly magnetic counter-flow with C6F14 for 30’ @ 1.5 bar pipe drying with Ar flow @ 1.5 bar repeat 1-4 4 more times (5 cycles total) last counter-flow with fluid lasts 12 h TESTED DRILLING > 100 FILTERS !

First application Flow= 2.0 g/s @ 4.75 bar Modules on= 100% ‘’Attack’’ first sector: #9 It never worked properly First one to be turned on for some time: 12/12/2007, h 15:13, for 41’ Pre-cleaning: 4 cycles vacuum cleaning + 3 magnet sweeps + vacuum cleaning + counterflow last counterflow left running overnight flow: from 0.27 to 0.46 g/s Drilling: February 15 morning Cleaning: 5 cycles (overnight counterflow between cycle 3 and 4) Results: Was: 0.27 g/s @ 6 bar Flow= 2.0 g/s @ 4.75 bar Modules on= 100% Was: 0%

Further drilling! First intervention: success! Also sector #7 (0% on) and #6 (42% on) are in bad shape Drilled both (#7 on Feb 27, #6 on March 6) Pre-cleaning done as in previous cases Cleaning: ‘’standard’’ 5 cycles, but: Results were not satisfactory on sector #7, cleaned for 1 more day Results: once again full performance recovered on both sectors! half stave 6C0 has electronic issues – cannot be turned on

Sector #7 analyses - 1 First cycle of cleaning…

Sector #7 analyses - 2 Second cycle of cleaning… ok! On the filter On the carbon sticker

New flow conditions Old flow rate values from last November 7 sectors above nominal value 3 drilled, 4 because of pre-drilling cleaning Sector #3 had 12 hs on, one went hot, expect still a few more 1.8 g/s new flow rate values old flow rate values drilled filters

Current performance Most work of configuration done T/power distributions consistent with previous, but…115 hs on!! Were 116, one hot on sector #3, still with low flow

Current acceptance Efficiency changed from this… to this! (and more to come!) 62.5% (75/120 on) - Nov, 30 2011 95.8% (115/120 on) - Mar, 15 2012

Perspectives Expect a few hs lost in next weeks flow not ideal yet in 3 lines Drill 1-2 sectors at next TS 3 only left with low flow: 5, 3 and 4, in descending performance order Late delivery of the fiberscope, images of the drilled filters can be done at next TS

Let’em flow! Lake Barriessa, Napa County, California, US