AUSRAIL 2005 Codes of Practice

Slides:



Advertisements
Similar presentations
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Advertisements

Academic review of HE in FECs. Student support: an overview Alan Bradshaw Assistant Director QAA.
Binder Distributors Task Team Feedback. Progress since May Resolution #7 –To review the process of binder distributor certification as fit for purpose.
NETLIPSE Infrastructure Project Assessment Tool Professor Hans-Rudolf Schalcher, ETH Zürich Amsterdam, 21 April 2009.
Draft Operational procedures for registry systems 09 November 2004 Bonn, Germany Technical Breakout Group.
National Association of Pipeline Safety Representatives Robert Miller.
© 2011 Underwriters Laboratories Inc. Product Recall and the Supply Chain: ISO Best Practices Robert Pollock Chair, US Technical Advisory Group for ISO.
MFRPS Lesson Learned North Carolina
ARTSA Improving Heavy Vehicle Safety Summit Chain of Responsibility and its potential to improve safety Marcus Burke National Transport Commission 16 April.
The European Railway Agency in development
ROAD TRANSPORT RESEARCH, TECHNOLOGICAL DEVELOPMENT AND INTEGRATION (2003 Call)
Copyright © 2009 NDIA PMSC Robert Loop August 2009 NDIA PMSC Guides Working Group Status.
LECTURE 1 What does a Business Analyst do? IFS 231 Business Analysis.
Improving the world through engineeringwww.imeche.orgImproving the world through engineeringwww.imeche.org RSB Strategy Matt Garside 12 th December.
National Concerns What was the problem?
Active Transport Forum 15 th February 2007 Nick Bryan Transport Policy Analyst.
The National Rail Safety Regulator: Progress and Priorities Sue McCarrey Chief Executive Office of the National Rail Safety Regulator (ONRSR)
Compendium of Best Practices and Benefits of National Logistics Associations in Selected APEC Economies First Workshop, Oakes on Collins Melbourne, 5-7.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
JRA2: Quality Assurance Overview EGEE is proposed as a project funded by the European Union under contract IST JRA.
2015 Pipeline Safety Trust Conference November 20 th, 2015 | New Orleans, LA API RP 1175 Pipeline Leak Detection Program Management – New RP Highlights.
Railroad Safety Update Joint Hearing of the Minnesota House Transportation Policy & Finance Committee & Senate Transportation and Public Safety Committee.
Implementing Program Management Standards at Duke Energy.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Accident Investigation SGRP CD Slide # Meeting 1 Northern Ontario Safety Group.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
Florence 3 December 2010 EFRTC Policy & Research Committee Activity Report Jeremy Candfield Committee Chairman.
ISO17799 / BS ISO / BS Introduction Information security has always been a major challenge to most organizations. Computer infections.
© GEO Secretariat Work Plan Management Update GEO Work Plan Symposium 30 April – 2 May 2012.
Sustainability Statement
RTAA SYDNEY NETWORKING MEETING 20th July 2016 RISSB AND THE RISK MODEL
INSPIRE and the role of Spatial Data Interest Communities (SDIC)
TRANSPORT SCIENCE: INNOVATIVE BUSINESS SOLUTIONS
TMG Total Rewards Steering Committee
English Language Education Information Day May 2017
FRA Building Development 2015
Data Minimization Framework
AUSTRALIAN CODE OF PRACTICE
Review of proposed outline for handbook
Next Generation Distribution System Platform (DSPx)
Amended and Restated Ordinance 98.1 First Reading
A Methodological Basis for the Definition of Common Criteria regarding the Identification of Bottlenecks, Missing Links and Quality of Service in Infrastructure.
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
CMGT 445 MASTER Perfect Education/ cmgt445master.com.
AONTAS COMMUNITY EDUCATION NETWORK MEETING QA DEVELOPMENTS IN THE ETBS
Meeting of the WG on Rail Transport Statistics 2-3 April 2009
EU Reference Centres for Animal Welfare
Draft OECD Best Practices for Performance Budgeting
Support for the AASHTO Committee on Planning (COP) and its Subcommittees in Responding to the AASHTO Strategic Plan Prepared for NCHRP 8-36, TASK 138.
UConn NIST Compliance Project
Roadmap to COR.
Midland Service Improvement Group
The “Why” and “What” of Safety Management Systems
UIC Welcome and introduction
The partnership principle in the implementation of the CSF funds ___ Elements for a European Code of Conduct.
Informed Consent (SBER)
2019 Meeting 1 Northern Ontario Safety Group.
WRAP Regional Haze Grant Status, Technical Project Priorities, & Proposed Technical Analysis Forum Tom Moore WRAP Technical Coordinator Attribution.
<month year> doc.: IEEE < e> January 2012
An Update of COSO’s Internal Control–Integrated Framework
<month year> doc.: IEEE ptc May 2013
Neopay Practical Guides #2 PSD2 (Should I be worried?)
DSC Contract Management Committee Meeting
Max Riegel, Nokia (TG Chair)
Security Policies and Implementation Issues
Report of the Technical Subcommittee
Gender Based Security For SHIs
<month year> doc.: IEEE < e> January 2012
DSC Contract Management Committee Meeting
BRANDON HALL HOTEL COVENTRY WEDNESDAY 22ND MAY 2019
Presentation transcript:

AUSRAIL 2005 Codes of Practice Industry Overview John Shalders www.ara.net.au

Code Management Managed on behalf of industry by the Code Management Company Wholly owned by the ARA Industry component of co-regulation Member funded (NTC supplement) non-profit www.ara.net.au

The old Code of Practice for the Defined Interstate Rail Network (DIRN) – issued Jan 2003 Safe-working rules Infrastructure Freight Loading Manual Limited application Minimum maintenance Volume structure – 4 volumes www.ara.net.au

The new ACOP Rules Standards Codes of Practice Guidelines Safe-working Infrastructure Investigations Road/rail Rollingstock Security Communications www.ara.net.au

Strategy takes shape ACOP structure is now firmly entrenched Element approach All development work is aligned to the new structure Development projects to address all key areas of the ACOP Management process established www.ara.net.au

Elemental structure Estimate over 300 elements Rules 50 to 100 Rollingstock standards 136 Infrastructure standards 100 to 150 Codes 10 to 20 Guidelines 5 to 10 Each a document in its own right www.ara.net.au

Objective: a suite of rules for national application Rules development Objective: a suite of rules for national application Joint project with DOI Victoria Initial activity – rules for application in Victoria Strong national focus Becomes baseline to develop a set of national rules Initially addresses requirements for Vic, NSW and SA www.ara.net.au

Rules development Stage 1 (work on track rules) Largely complete for Vic/NSW Further effort required for national adoption Stage 2 (train operating rules) Development Oct 2005 to Mar 2006 Address national requirement Both stages require development of organisational level documentation www.ara.net.au

Standards - Rollingstock 34 major subjects to address for: Locomotives Passenger cars Freight cars Track maintenance vehicles Year 1 of a 3 year project 32 elements being progressed 3 contracted specialist organisations for authoring and validation 136 elements www.ara.net.au

Standards - Rollingstock Innovative approach Published as spreadsheets Clarity of requirements Additional functionality Link to identified hazards Logical hazard tree identification All requirements linked to one or more applicable hazards www.ara.net.au

Standards - Infrastructure Progressing changes to Volume 4 (DIRN) Project planning for ACOP elements Commence 2006 Hazard identification (hazard tree) www.ara.net.au

Code - Security Consistent approach for rail industry security management Initial work Policy (draft developed) Counter terrorism CCTV (draft developed) www.ara.net.au

Code - Investigations Consistent approach to conduct of investigations Reason model Developed in conjunction with DOI Vic Draft circulated to industry Oct 05 Ongoing work to develop common approach to coding of causal factors www.ara.net.au

Guideline – Road/Rail Guidelines for safe operation of road-rail vehicles Involved all principal organisations Guidelines (checklists) developed Design standard requirements identified and forwarded to Rollingstock project www.ara.net.au

Management process Subject Committees Project Managers Project Teams ARA Executive Subject Committees Project Managers CMC Board Operations and Management SC Infrastructure SC Rollingstock SC Rules PM Investigations PM Security PM Infrastructure PM Rollingstock PM Project team Project team Project team Project team Project team Project Teams www.ara.net.au

Supporting activities Wheel rail committee projects Wheel-rail profile optimisation review Wheel burn causal factors Twist test sensitivity assessment Wheel rail interaction course Focus groups www.ara.net.au