Dr. Marcos Esterman Faculty Guide W. Casolara Project Leader

Slides:



Advertisements
Similar presentations
ODS3F –Observation and Detection Systems For Forest Fire Monitoring
Advertisements

Composite Filament Winding Machine: P09226 Shijo George Christofer Brayton Alex Sandy Tiago Santos Daniel Weimann Project Manager Electrical Engineer Chief.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
EDGE™ Preliminary Project Overview P09123 – MAV Platform Team Members: Joe Hozdic (Lead)Ming Chow Aaron NashBrian David Giovanni Sorrentino.
EDGE™ Concept Level Project Plan P08110 – UAV Based Digital Imaging System David Eells (Mechanical Engineering)
Intelligent Ground Vehicle Competition 2006 Brigham Young University.
EDGE™ Final Project Plan P08110 – UAV Based Digital Imaging System David Eells (Mechanical Engineering)
Project Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T MSD I Project Review Objectives of the Project Review Proposed Review Structure.
LFTB Proprietary Information 1 Fuser test bed ™ R I T MSD1 Project Review February 22, 2007 Fuser Test Bed P07501 IE TEAM Justin McMillan – Project Lead.
Project Status Update II R09230: Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems A. Benjamin Wager (ME) B. Michael Skube (ME)
RIT Senior Design I, Project Review P07310: Electronic Shifted Manual Transmission George Slack Team Guide Jason BotterillTeam Leader, Mechanical Engineer.
EDGE™ Concept Level Project Plan P08110 – UAV Based Digital Imaging System David Eells (Mechanical Engineering)
P08456-LED Lighting for an Underwater ROV Jeremy Schiele-Project Manager Jonathan Lent-Mechanical Engineer Ryan Seeber-Computer Engineer Justin VanSlyke-Mechanical.
EDGE™ MAV Control System - P Management Review (MSD I) Erik Bellandi – Project Manager Ben Wager – Lead Engineer Garrett Argenna – Mechanical Engineering.
R I T Advisors: Dr. Wayne WalterMechanical Engineering Dept. Faculty Jeffrey WebbTeacher’s Assistant Team Members: Aman Verma EE - Electrical Craftsman.
Automatic Home Medication Dispenser Project # P07009 Team Guide - Dr. Daniel Phillips Project Sponsor - Dr. Michel Berg Team Members Alan StrandburgChris.
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
Design Review Three Micro Air Vehicle Project: P Sponsored by Impact Technologies The Boeing Company Mark Baybutt Electrical Engineering.
Project Review Micro Air Vehicle Project: P Sponsored by Impact Technologies The Boeing Company Mark Baybutt Electrical Engineering David.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful.
P07007: Adapted Home Entry Sponsor: National Science Foundation Wenbo Chen Project Manager, EE Tanvir Rasel EE Meklet Kidane EE Faculty Mentors: Dr. Elizabeth.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T Design Reviews Objectives of the Design Review Participants for a successful.
P09651 – Visible Spectrum Imaging System Lead: Dave Lewis Brian Russell Aditi Khare.
P09561 – Visible Spectrum Imaging System: Project Update Dave Lewis Steve Sweet Joanna Dobeck Lenny Calabrese Jason Thibado Darrell Draper Customer: Dr.
Christopher Barrett (ME) Daniel Graves (ME). Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems Primary Customer: ○ Currently.
MSD P07302Design Review1 Motor Controller Subsystem MSD P07302 Project Sponsor: KGCOE Project Members: D. ShenoyProject Manager S. TallauSoftware Design.
Automatic Shift Controls for ATV Sponsored by: Joel Notaro Polaris Industries Advised by : Professor George Slack Project Family: Modular, Scalable, Open.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
1 PVDI personal vehicle diagnostic interpreter Grandma Photo courtesy of Getty Images.
PROJECT STATUS UPDATE P10661-AERIAL IMAGING Dale Turley (Mechanical Engineering)
Ian Frank Matt Walter Jesse Steiner Luke Spencer Mike Celentano Nick Balducci Team Lead Chief Engineer Electrical Engineer Industrial Engineer Electrical.
DemoSat IV: Metro Triple Threat Metropolitan State College of Denver Matt Hanley David Fifield Jason Igo Evan I Spitler Devlin Thyne Matt Hanley David.
ClearVision Final Presentation Senior Design 1. Team Members Travis Ann Nylin Electrical Engineer System Testing Schematic Data-Logging and Retrieval.
P07108: METEOR Instrumentation Recovery System. Team Bash Nanayakkara – Project Manager (ISE) Scott Defisher – Fuselage Design (ME) Mike Kochanski – Software.
P15051: Robotic Eye Project Definition Review TIM O’HEARNANDREW DROGALISJORGE GONZALEZ KATIE HARDY DANIEL WEBSTER.
P08311: FPGA Based multi-purpose driver / data acquisition system Sponsor: Dr. Marcin Lukowiak Team MemberDisciplineRole Andrew FitzgeraldCEProject Manager/FPGA.
Abstract Each July, the Association for Unmanned Vehicle Systems International holds an annual International Aerial Robotics Competition (IARC), with major.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
RIT MAV System Review (P08121) Dr. Jeffrey Kozak – Faculty Guide Michael Reeder – Team Leader Kevin Hand – Lead Engineer Todd Fernandez – ME.
EDGE™ Final Project Plan Presentation P08043 – Mass Spectrometry Sample Preparation.
P07521 BRDF Imaging Platform Concept Review 19 Jan 2007 Concept Review 19 Jan 2007.
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
Inertial Measurement Unit. Project Advisor: Dr. Basart Client: Matt Nelson Team Members (491): Matt Ulrich Luis Garcia Amardeep Jawandha Julian Currie.
Joseph Ferrara Team Lead (ME) Joseph ChurchDesign Engineer (ME) Joshua Van Hook LabView Engineer (EE) Jamie Jackson Electronics (EE) Joelle Kirsch Project.
MOBILE CAMERA CONTROL SYSTEM. Team Members Ruth Ayalon – ME Ruth Ayalon – ME Erin Gillespie -ME Erin Gillespie -ME Claudia Forero –ISE Claudia Forero.
P07521 BRDF Imaging Platform
P07307: Controls for Dynamic Suspension
AirTheo “Autonomous solution to your surveying needs”
P07203 Dynamometry Laboratory Infrastructure
R09560 – Open Architecture, Open Source Aerial Imaging Systems
PAX River Competition UK Aerial Robotics Team University of Kentucky.
UAV Vision Landing Motivation Data Gathered Research Plan Background
Multidisciplinary Senior Design I: Problem Definition Review
Concept Level Project Plan P08453 – Turbomachinery Flow Visualization
AUTOMATIC SHIFT CONTROLS FOR ATV SPONSOR: POLARIS INDUSTRIES
P07521 BRDF Imaging Platform
P08002-Automated Parallel Bars
P07021: Instrument to Detect Thromboemboli
P07107: Mission Control Procedures Aerospace Systems and Technology
Lockheed Martin Challenge
P09052: Molecular Imaging System Upgrade
Project Review P07442: Thermoelectric Demonstration Test Bed
Project Readiness Review P10029 – Air Muscle Artificial Limb
Definition & Description:
P07122: Autonomous Quadcopter
Guide: Dr. Marcos Esterman
Final Project Review -Senior Design 2
P09045: Membrane Characteristic Test Stand
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
Presentation transcript:

P07521: Bi-Directional Reflectance Distribution Function (BRDF) Imaging Platform Dr. Marcos Esterman Faculty Guide W. Casolara Project Leader M. Harris Lead Engineer K. Berens Mechanical Engineer R. Andol Mechanical Engineer R. Strebig Mechanical Engineer R. Jaromin Electrical Engineer Sponsor: Chester F. Carlson Center for Imaging Science KGCOE Multidisciplinary Sr. Design R•I•T

P07521: Project Description The mission of this student team is to develop a fully autonomous imaging platform for deployment on a range of vehicles, capable of imaging across a complete hemispherical field of view to measure a target's BRDF. Initial deployment vehicles include full-scale aircraft and ground based vehicles, while future vehicle platforms may include lighter-than-air vehicles and unmanned aerial vehicles. will KGCOE Multidisciplinary Sr. Design R•I•T

P07521: High Level Needs Instantaneously look at an object from all possible vantage points before the sun moves Come up with the shapes of the Bi-directional Reflectance Distribution Functions (BRDF) of natural targets outside on a clear day 50-70 degree angle from horizontal on target Log GPS coordinates with each picture taken Time stamp on pictures to know when it was taken Keep the system nearly level while imaging Robust enough to prevent damage of equipment Onboard power will KGCOE Multidisciplinary Sr. Design R•I•T

P07521: Design Concept Dampened Stabilization System Batteries PC 104 Computer Matt GPS Unit Camera Mount and Motor Polycarbonate Dome KGCOE Multidisciplinary Sr. Design R•I•T

P07521: Key Assumptions Flying in Visual Flight Rules (VFR) conditions Clear day, 1,000 ft ceiling Winds <15 kts Racetrack flight path to be set up by user Path over target for which the platform will take data Camera hanging vertical as result of passive stabilization Not completely accurate, need to sense pitch/yaw rate Matt KGCOE Multidisciplinary Sr. Design R•I•T

P07521: Technical Risk Assessment Risk: Sensing Orientation of Aircraft for Post Processing Adjustment Passive stabilization system susceptible to misalignment due to G force Throws off angle calculations Need assumption of camera hanging vertical Reviewed possible solutions with project team Proposed Mitigation: Stochastic Sensor Log orientation of plane through pitch/yaw rates Data corrected in post processing Rick KGCOE Multidisciplinary Sr. Design R•I•T

P07521: Technical Risk Assessment Risk: Write speed of Compact Flash card 5º Angular resolution requires 5 pictures per second in certain situations Requires significant amount of computing power to process PC104 Board needs to write to memory quickly enough to process next picture Proposed Mitigation: Verify write speed once Compact Flash card is selected Test system in lab to verify picture acquisition rate Keep hard drive option available Bob KGCOE Multidisciplinary Sr. Design R•I•T

P07521: Product Development Process Phase Phase 0: Planning Phase 1: Concept Development Phase 2: System Level Design Phase 3: Detailed Design Phase 4: Testing and Refinement Ross MSD I MSD II Working Model 1 2 3 4 Current Phase of Development KGCOE Multidisciplinary Sr. Design R•I•T

P07521: Current State of Design Design meets all customer needs Design meets engineering specifications for full system and subsystems except: 2 cm over Pico-Satellite dimensions (10x10x12) Optical dome size Bill of Materials complete, used $981 of $1000 available in budget Mitigations: Crab angle adjustments will be made in post-processing, not actively Flight plan details to be worked out in SDII Kate KGCOE Multidisciplinary Sr. Design R•I•T

P08907: MSD II Project Schedule Milestones Mar 09: All parts on order Mar 23: Review of final design based on feedback and manufacturing specs Apr 06: Prototype built and ready for testing Apr 13: Performance Testing Vibration Vehicular May 04: Functional review: Design Verification Testing Results May 11: Documentation Finalized: DHF, Formal Paper, Poster May 18: Project Review - Phase 4 Completion Kate KGCOE Multidisciplinary Sr. Design R•I•T

Questions? KGCOE Multidisciplinary Sr. Design R•I•T