EP4P03 Nuclear Plant Systems and Operation

Slides:



Advertisements
Similar presentations
CONTROLS OF SUPER CRITICAL BOILERS
Advertisements

Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Rankine Cycle Figures from Cengel and Boles, Thermodynamics, An Engineering Approach, 6th ed., McGraw Hill, 2008.
WHAT IS STEAM PRO? Thermoflow, Inc.
IAEA International Atomic Energy Agency Simulators in an e-learning platform D. Beraha.
Idaho National Engineering and Environmental Laboratory SCWR Preliminary Safety Considerations Cliff Davis, Jacopo Buongiorno, INEEL Luca Oriani, Westinghouse.
ACADs (08-006) Covered Keywords Pressurized Water Reactor (PWR), Boiling Water Reactor (BWR), primary loop, reactivity, reactivity control, reactivity.
IAEA International Atomic Energy Agency Overview of CANDU Reactor Technology and the CANDU 9 Simulator Matthias Krause Nuclear Power Technology Development.
Summer Co-op Experience: OPG Aditi Garg. Darlington Nuclear G.S Located in Bowmanville, ON.
Reading: Cengel & Boles, Chapter 9
Advanced Control Systems
2008 January1 CANDU Control Programs & Process Systems B. Rouben McMaster University EP 4P03/6P Jan-Apr.
Vapor and Combined Power Cycles
Reheat cycle.
LEADER Project: Task 5.4 Analysis of Representative DBC Events of the ETDR with RELAP5 G. Bandini - ENEA/Bologna LEADER 5 th WP5 Meeting JRC-IET, Petten,
Turbine Protection and Control System
Walter G Bischoff Brunswick station Duke Energy
ACADs (08-006) Covered Keywords Components, functions, operation, Auxiliary feedwater, Startup, hot standby, plant cooldown, emergency. Description Supporting.
STEAM PRO is a highly automated system design tool – a heat balance program specifically intended for design of steam power cycles.  Use STEAM PRO to.
Free PowerPoint Backgrounds Heat Rate Improvement Conference February 5-7, 2013 Scottsdale, Arizona.
Nuclear Power Station Lecture No 5. A generating station in which nuclear energy is converted into electrical energy is known as a Nuclear power station.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
Lesson 7 FIRST LAW OF THERMODYNAMICS STATE the First Law of Thermodynamics. Using the First Law of Thermodynamics, ANALYZE an open system including all.
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
ACADs (08-006) Covered Keywords Containment Isolation, actuation logic, Description Supporting Material
Nuclear Power Reactors SEMINAR ON NUCLEAR POWER REACTOR.
1. - Condensate pump and feed pump trip! -Turbine trips! 2.
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
LEADER Project Analysis of Representative DBC Events of the ETDR with RELAP5 and CATHARE Giacomino Bandini - ENEA/Bologna Genevieve Geffraye – CEA/Grenoble.
Page 1 Petten 27 – Feb ALFRED and ELFR Secondary System and Plant Layout.
Modeling a Steam Generator (SG)
"... To design the control system that effectively matches the plant requires an understanding of the plant rivaling that of the plant's designers, operators,
T s boiler turbine pump work in work out heat out heat in condenser superheated vapor saturated liquid & vapor compressed liquid critical point.
Superheat Rankine Cycle Example Turbine pump condenser Q out Q in W out W in boiler Consider the superheat Rankine power cycle as we analyzed before.
Dr. Owen Clarkin School of Mechanical & Manufacturing Engineering Summary of Energy Topics Chapter 1: Thermodynamics / Energy Introduction Chapter 2: Systems.
COLLEGE OF ENGINEERING DEPARTMENT OF MECHANICAL ENGINEERING MENB INTRODUCTION TO NUCLEAR ENGINEERING GROUP ASSIGNMENT GROUP MEMBERS: MOHD DZAFIR.
Version 1.0, May 2015 BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study This material was prepared by the IAEA and co-funded by.
Nuclear power plant Performed by Zhuk A.D.. Purpose of this presentation is to show importance and danger of nuclear power plant. My opinion: I think.
Lesson 7 Steam Power Plant.
EP4P03 Nuclear Power Plant Systems and Operation
Review Questions Chapter 5
Multiple-Choice Questions
Fluid Statics/Dynamics
Heat Exchangers and Condensers
- Condensate pump and feed pump trip!
Feedwater System Overview IUFW PV340 (NO) Call up desktop display for BFPs and panel 5 bottom. Again, before we look at the simplified Feedwater flowsheets,
Objectives Evaluate the performance of gas power cycles for which the working fluid remains a gas throughout the entire cycle. Analyze vapor power.
Thermodynamics Thermal Hydraulics.
Thermodynamics Cycles.
Thermodynamics Processes.
TURBINE CRANES NEA36 Turbine Crane.
Simple Thermal Power Plant
LAWS OF THERMODYNAMICS
DELTAK HEAT RECOVERY STEAM GENERATOR
POWER PLANT THERMAL POWER STATION.
Lesson 24 NATURAL CIRCULATION
1-800-DIABETES DIABETES CARE TASKS AT SCHOOL: What Key Personnel Need to Know DIABETES CARE TASKS AT SCHOOL: What Key Personnel Need to.
Initial Startup Procedure Investigation of a BWR-Type Small Modular Reactor Shanbin Shi, Xiaodong Sun Department of Nuclear Engineering and Radiological.
9 CHAPTER Vapor and Combined Power Cycles.
Reactor Experiments Instructor: Prof. Kune Y. Suh T/A : Sang Hyuk Yoon
Grid Stability and Safety Issues Associated With Nuclear Power Plants
Session Name: Lessons Learned from Mega Projects
Digital Chart Recorder Operation
Compact Nuclear Simulation Analysis
- Condensate pump and feed pump trip!
BASIC PROFESSIONAL TRAINING COURSE Module VII Probabilistic Safety Assessment Case Studies Version 1.0, July 2015 This material was prepared.
Group 1 Best Group.
Generation of Most Eligible Steam for Rankine Cycle
BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study Version 1.0, May 2015 This material was prepared by the IAEA and.
Egyptian Atomic Energy Authority (EAEA), Egypt
Presentation transcript:

EP4P03 Nuclear Plant Systems and Operation Unit Transients – Event 2

Event 2 The Simulator was initialized to 100%FP, and ALTERNATE MODE was selected. The SG1 SGLC and SG4 SGLC Large LCV Selections were both set to LCV #1. At time = 0 a malfunction was inserted The immediate response to the malfunction were: Window display: Main BFP(s) Trip Window display: Reactor Trip Window display: Step Back Req’d

Event 2 (continued) Q1: What is the diagnosis of the event, and what caused the Reactor Trip?

Event 2 (continued) Time after malfunction was initiated: 1 second

Event 2 (continued) Time after malfunction was initiated: 1 second Q1: What is the diagnoses of the event, and what caused the Reactor Trip? A1: The event is easy to diagnose as caused by the Trip of All Main Boiler Feedpumps. The original cause may have been a loss of Class IV power that supplies the pumps, although that would likely have caused other effects as well; or human error. The cause of the SDS#1 Reactor Trip is not specifically displayed on the Simulator, but is almost certain to have been due to the “Low Boiler Feed- line Pressure” signal.

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 1 second Q2: What key parameters should the operator be monitoring?

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 1 second

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 1 second Q2: What key parameters should the operator be monitoring? A2: Need to confirm that reactor trip is completed (neutron and thermal power decreasing, shutdown and MCAs fully inserted, AZL at 95%) Need to confirm that Auxiliary Feed Pump is in service and supplying feedwater to the Steam Generators

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 1 second Q3: What is the immediate response of the Steam Generator Feed Pumps system to the Trip of All Main BFPs?

Sim Ex 6.2 All Main BFPs Trip Status of SG Feed Pump system prior to malfunction

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 10 seconds

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 20 seconds

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 1 second Q3: What is the immediate response of the Steam Generator Feed Pumps system to the Trip of All Main BFPs? A3: One Auxiliary BFP starts up. Valves FCV153, 253, 353, 453 that control Main BFP recirculation flows open FCV553 that controls Auxiliary BFP recirculation flow closes PCV555 that supplies flow to the SGs via the now operating Auxiliary BFP opens After a brief period of zero feedwater flow, it is reestablished at the required low value

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 1 second Q4: Having confirmed that the reactor trip has been correctly executed, after checking the main system parameters, which system display should the operator check next?

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 1 minute

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 1 minute

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 1 minute

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 1 minute Q4: Having confirmed that the reactor trip has been correctly executed, after checking the main system parameters, which system display should the operator check next? A4: Since the PHT Pressures and Inventory levels have not deviated beyond what is expected on a reactor trip, the operator should respond to the Steam Generator Low alarm by selecting first the SG Level Trend display, followed by the Steam Generator Level Control display.

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 1 minute Q5: What system and equipment was responsible for controlling Steam Generator pressure?

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 1 minute

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 1 minute Q5: What system and equipment was responsible for controlling Steam Generator pressure? A5: The SGPC system controlled SG Pressure by reducing the opening of the Governor valve, and as a consequence reducing Turbine Generator power.

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 2 minutes Q6: What major unit event should the operator expect to see next?

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 2 minutes

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 2 minutes Q6: What major unit event should the operator expect to see next? A6: Subsequent to the reactor trip, a turbine trip should be anticipated, and the operator should verify that the Steam Generators will continue to act as heat sinks, by confirming that the ASDVs and/or CSDVs have opened and confirming the continued operation of the SGPC system, the Feedheating system and the SGLC system.

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 2 minutes

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 2 minutes Q7: Why did neither the ASDVs nor the CSDVs open following the Turbine Trip?

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 2 minutes

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 2 minutes Q7: Why did neither the ASDVs nor the CSDVs open following the Turbine Trip? A7: Subsequent to the reactor trip the Turbine continued to operate taking steam from the Steam generators, resulting in a decrease of SG pressure, which was continuously below the setpoint (4.7 MPa) until, and for some time following, the Turbine Trip.

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 2 minutes Note, although not covered in class, that on a Reactor Trip there is an automatic “fast turbine runback” that takes control of the governor valves, and pro- actively ramps them closed, reducing turbine output in an essentially linear manner as shown by these Trend Plots.

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 2 minutes Q8: How does the SGLC system respond to this event?

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 2 minutes

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 2 minutes

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 2 minutes

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 2 minutes Q8: How does the SGLC system respond to this event? A8: The level drops quickly in the beginning because there is steam flow out but no feed flow into the SGs. Once the turbine has tripped and the Auxiliary Boiler Feed Pumps are supplying feedwater, the SG levels stabilize. The SG level control setpoint has been reduced due to the reactor power reduction. The small SGLC valves are controlling SG level in single-element mode. The SGs will continue to be the heat sink for the decay heat being produced by the reactor.

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 2 minutes Q9: What are the main parameter responses of the PHT system?

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 2 minutes

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 2 minutes Q9: What are the main parameter responses of the PHT system? A9: The decrease in heat into the PHT coolant from the reactor is greater than the loss of the SGs as heat sink: steam flow continues out of the SGs, although at a reduced rate due to the fast turbine runback, and the Auxiliary feed pumps are replenishing the feedwater supply after a few seconds. The coolant volume shrinks as the average coolant temperature decreases, resulting in a flow of coolant from the Pressurizer into the Main Circuit.

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 2 minutes Q9: What are the main parameter responses of the PHT system? A9 (cont): The Pressurizer Level Setpoint is lowered as a function of reactor power more quickly than the decrease in Pressurizer Level due to the outflow from the Pressurizer to the Main Circuit, resulting in an increased Bleed flow. This further reduces the volume of coolant in the Main Circuit. The increased Bleed flow raises Bleed Condenser level and pressure, the latter resulting in an increase in Reflux flow. Within 4 minutes steady state is essentially reached in PHT Pressure and Pressurizer Level.

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 4 minutes

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 2 minutes Q10: How was feedheating accomplished following the turbine trip?

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 4 minutes

Sim Ex 6.2 All Main BFPs Trip Time after malfunction was initiated: 2 minutes Q10: How was feedheating accomplished following the turbine trip? A10: The Deaerator Pressure control (aka Poison Prevent) valve opened to provide feedheating and pressure control to the Deaerator.