Internal Orbital Welding

Slides:



Advertisements
Similar presentations
PH pH is a unit of measure which describes the degree of acidity or alkalinity (basic) of a solution. It is measured on a scale of 0 to 14. The formal.
Advertisements

Arc Welding Equipment
MENG 439 Dr. L. K. Gaafar Plasma Arc Cutting.
Cryogenic discussion and update 30 October 2014Neutrino platform.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Miller XMT400 CC/CV Welder
Foam Shells by Injection Molding November 13, 2001 Warren Steckle and Art Nobile Polymers and Coatings Group, MST-7 Los Alamos National Laboratory Los.
Automated HIC assembly A. Di Mauro ITS-MFT mini-week
TT Assembly Structure Reference-Reinforcement System: 1.Description of the system 2.Assembling Procedure 3.Production Project Board, march 2005 D.Orlandi.
Process and Product Engineering Markets: Liquid Food Industry Pharma and Medical Industry Scientific Research Aerospace Industry CATI-A Design Pro/E Design.
Microelectronics Clean Room Electrical and Computer Engineering Orbital Tube Welder by Clayton Gatewood.
Basic equipment setup and welding procedures
Introduction to practical application of wire feed welding.
Sheet Metal Fasteners.
Gas Metal Arc Welding (Metal Inert Gas) (MIG)
Assembly / Disassembly Machines Foldable Information.
IAEA Safeguards at the Independent Spent Fuel Storage Installation, Chinshan Nuclear Power Plant SGOA3 & SGTS-TND 2012/01/24.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans S. Pordes Argon Purity1Integrated R & D Plan Review.
NLC - The Next Linear Collider Project NLC Beam Delivery Lehman Review, May 1999 Vacuum System Cost Model Presentation by Leif Eriksson.
Poster Design & Printing by Genigraphics ® Neutrino Interactions Studying the properties of neutrinos will shed light on the origin of the.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
Fabrication Process Joining two or more elements to make a single part is termed as fabrication process. Fairly large numbers of industrial components.
VEA’s proposal of automated assembly system WP6 meeting, 16/01/14.
David Finley / PPD Engineering Meeting / June 24, Fermilab Slide 1 R&D Toward Large Liquid Argon Time Projection Chambers “Large” means up to 100.
Arc Welding Equipment Welding Machines AC – (alternating current) used for most agricultural arc welding jobs and has low purchase cost compared.
MIG Welding. MIG – Metal Inert Gas, also referred to as GMAW. GMAW – Gas Metal arc welding.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
1 DarkSide Collaboration APC Paris, France Augustana College, USA Black Hills State University, USA Fermilab, USA IHEP, China INFN Laboratori Nazionali.
PANDA Collaboration Meeting, GSI November 2010 H.O. Cluster-Jet works at GSI Herbert Orth, GSI Darmstadt, Germany Title.
MUSE Task 5 Design and Construction of a Liquid Hydrogen Target.
Methane Update and Run Plan Ben Jones. Configuration 8 inch PMT with TPB plate - 8” from alpha source - Now includes magnetic shield - 2 inch PMT without.
5/13/11 FCPA Mini-RetreatDarkSide - S.Pordes1 DarkSide 10 kg Prototype at Princeton Distillation Column for Depleted Argon at Fermilab DarkSide 50 at Gran.
Enter the DarkSide Stefano Davini University of Houston RICAP-13.
Unit 215 – Welding by TIG Process
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Cary Kendziora Fermi National Laboratory Cary Kendziora Fermi National Laboratory CEC-ICMC 2013 Anchorage Alaska – June, 2012.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
Benchwork IV –Hand Taps and Hand Reamers
H, I & PLUS BEAM FABRICATION LINE WITH MATERIAL HANDLING
Stainless steel piping's presentation
Chapter 11 SMAW: Electrodes Goodheart-Willcox Publisher.
MICRO TIG WELDING MACHINE AT ARCRAFT PLASMA
Status of the PANDA Solenoid Magnet Production in BINP
Overview of the Long-Baseline Neutrino Facility Cryogenic System
He Plant, LN2 Systems and Commissioing
GMAW SHIELDING GASSES.
Welding Trades Gas Tungsten Arc Welding (GTAW).
PANDA Yoke of the Magnet
Flexible lines production and planning
Summary of activities of the pellet target development
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Update on the IBL vacuum flex transfer lines
Follow-up of the tests with the copper filter
UNIT-2 CASTING AND WELDING
Low-Radioactivity Argon Transportation and Storage
Basic equipment setup and welding procedures
The 11T cryo-assembly: summary of design and integration aspects
Update on the IBL vacuum flex transfer lines
GMAW Welding Basic information.
Status of the PANDA Cluster-Jet Target Quarter 1/2018
Wire plus laser AM & Hybrid wire plus arc AM Gonçalo Pardal
Fusion Welding Processes
Plasma Arc / Jet Machining / Cutting
BSc (Honours) in Natural Sciences (Physics)
Status of the PANDA Solenoid Magnet Production in BINP
PANDA The conceptual design of the control Dewar
as a prototype for Super c-tau factory
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

Internal Orbital Welding Cary Kendziora Fermi National Laboratory GSI, Darmstadt, Germany – Feb. 4, 2013

GSI, Darmstadt, Germany – Feb. 4, 2013 Intro GSI, Darmstadt, Germany – Feb. 4, 2013

Presently Working on DarkSide at Gran Sasso 10 Meter Diameter Water Cerenkov 4 Meter Veto Scintillator Sphere Two Phase Argon TPC 10 meter diameter water cerenkov 4 meter liquid scintillator sphere GSI, Darmstadt, Germany – Feb. 4, 2013

GSI, Darmstadt, Germany – Feb. 4, 2013 DarkSide Veto GSI, Darmstadt, Germany – Feb. 4, 2013

DarkSide Liquid Argon System

GSI, Darmstadt, Germany – Feb. 4, 2013 E835 Hydrogen Target At FermLab 1997 GSI, Darmstadt, Germany – Feb. 4, 2013

GSI, Darmstadt, Germany – Feb. 4, 2013 Hydrogen Target At GSI 2005 GSI, Darmstadt, Germany – Feb. 4, 2013

GSI, Darmstadt, Germany – Feb. 4, 2013 The Reoccurring Question: How to make the final connections in the interaction area? GSI, Darmstadt, Germany – Feb. 4, 2013

GSI, Darmstadt, Germany – Feb. 4, 2013 VRW GSI, Darmstadt, Germany – Feb. 4, 2013

Modified Arc Machines Orbital Welder for Panda Internal Welding GSI, Darmstadt, Germany – Feb. 4, 2013

Internal Orbital Weld Sample GSI, Darmstadt, Germany – Feb. 4, 2013

GSI, Darmstadt, Germany – Feb. 4, 2013 Orbital Welding Advantage Uniformity and Consistency Each weld is a executed program from start to finish GSI, Darmstadt, Germany – Feb. 4, 2013

Arc Machines Orbital Head GSI, Darmstadt, Germany – Feb. 4, 2013

GSI, Darmstadt, Germany – Feb. 4, 2013 Arc Machines Tungsten GSI, Darmstadt, Germany – Feb. 4, 2013

100% Penetration for External Welds GSI, Darmstadt, Germany – Feb. 4, 2013

GSI, Darmstadt, Germany – Feb. 4, 2013 Arc Machines Tungsten GSI, Darmstadt, Germany – Feb. 4, 2013

GSI, Darmstadt, Germany – Feb. 4, 2013 Important Issues: Alignment of parts to welding electrode Purge gas purity < 3 PPM of H20, O2 GSI, Darmstadt, Germany – Feb. 4, 2013

Weld Components for Internal Welding GSI, Darmstadt, Germany – Feb. 4, 2013

GSI, Darmstadt, Germany – Feb. 4, 2013 Sub Assembly GSI, Darmstadt, Germany – Feb. 4, 2013

Aligned and Ready for Weld GSI, Darmstadt, Germany – Feb. 4, 2013

GSI, Darmstadt, Germany – Feb. 4, 2013 Tungsten Alignment GSI, Darmstadt, Germany – Feb. 4, 2013

GSI, Darmstadt, Germany – Feb. 4, 2013 Internal Orbital Weld GSI, Darmstadt, Germany – Feb. 4, 2013

Internal Orbital Welder GSI, Darmstadt, Germany – Feb. 4, 2013

GSI, Darmstadt, Germany – Feb. 4, 2013 Unique Welding Requirement: Ability to remove the Weld and ReWeld several times GSI, Darmstadt, Germany – Feb. 4, 2013

Internal Weld Removal using a Expandable Reamer 58-64 mm Adjustment Each adjustment is .02mm GSI, Darmstadt, Germany – Feb. 4, 2013

GSI, Darmstadt, Germany – Feb. 4, 2013 Additional Features: Camera for Alignment and Monitor Process Camera for Weld Removal Remote Expansion Adjustment of Reamer Vacuum Removal of Particulate During Weld Removal GSI, Darmstadt, Germany – Feb. 4, 2013

GSI, Darmstadt, Germany – Feb. 4, 2013 Thank You GSI, Darmstadt, Germany – Feb. 4, 2013