Site Plan Turner, Hickey and Associates 1st Level Floor Plan Administration 6 th Grade 7 th Grade 8 th Grade Special Classrooms Teacher Lounge Multi Purpose.
Advertisements

CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
F. A. Day Middle School Newton, MA Site Plan & Entry Plaza 1 st, 2 nd & 3 rd Floor Classrooms Cafeteria Administration and Student Services Suites West.
Cigarroa Middle School Cigarroa High School Ashley Humphries & Sanchez Architects Construction Documents phase Administration Classroom Bldg. Storage Storage.
Government of the Republic of Montenegro The Ministry of Education and Science Directorate of Public Works SECONDARY SCHOOL OF MEDICINE.
NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary.
Update on FCPS Construction/Renovation Projects August 2009.
Current Project Update October 25th 2012 Good Evening!!!
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
Bartholomew Consolidated School Corporation Additions and Renovations to Columbus East and North High Schools Additions and Renovations to Columbus East.
Welcome to the CY Middle School virtual tour! Click here for pictures of the main floor. Click here for pictures of the second floor.
Campus signage – Internal
September 21 Update. Future Main Entrance (looking south)
Rebuild Stafford High School Update- October 2014.
Glenvar High School Renovations School Board Presentation
SCHEMATIC DESIGN PRESENTATION
Community Update James Simons School – October 2,
3a. Pursue funding for the program plan to effect a transformation that is almost complete…Information Commons.
Bar joist over kitchen and band room. Setting bar joist over kitchen and electrical/mechanical rooms.
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
Mary Lin Elementary School 586 Candler Park Drive Phasing Plan March 25, 2010.
ADDITION & REMODEL Eugene Field Elementary School.
Smith Farm Elementary. Smith Farm Address: 4250 Johnny Knoll Ln. Winston-Salem, N.C Final Project of the 2006 Bond 89,753 Square Feet 46 - Total.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
Basement Suite Renovations. Storage Room Under stairs East Bedroom West Bedroom Living Room Furnace Fridge Bathroom Previous Basement Entrance to stairs.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Liberty Elementary: Preparing for the Future Building New Pre Construction Meeting.
Design Development Review
BUILDING UPDATE AUGUST 23,2014. BUILDING “A” NORTHEAST VIEW.
Queen Anne’s County Public Schools New Construction of the Matapeake Middle School.
New Fabra Elementary School Design Presentation. Play Field Playground Bus Loop Staff Parking Parent Drop-off Parking Johns Rd. Lattimore Blvd. Secure.
St. Cloud High School Phased Comprehensive Construction Project April 28,
Focus Areas Safe and secure buildings and grounds Learning environments that meet the needs of today’s learners Preserve, maintain, and/or improve current.
Deerfield Elementary School Deerfield Elementary Overview of Deerfield Renovation October 8, 2015.
North Augusta High School Design Development Presentation.
SEDONA RED ROCK HIGH SCHOOL October 9, 2008 SCHEMATIC DESIGN – PHASE 2.
Learning, Health, and Safety Capital Project Alternates and Change Order
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
District of Columbia Public Schools | 1200 First Street, NE | Washington, DC | T | F | Murch.
21 st Century Classroom Learning Environment Installation Process.
White Pigeon Community Schools
Cornwall Central School District
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
EPHS - FIRST LEVEL ROOM MAP NOTE: INFORMATION/HELP DESK IS ON THE
Goding Elementary Existing Conditions Presentation February 13, 2013.
Penn Medicine Chester County Hospital
Capital Improvements Presentation
Dr. Joseph Meloche Superintendent of Schools Mrs
21st Century School Buildings Plan
Troy School District Bond Program – Series 1 Construction Update
EPHS - FIRST LEVEL ROOM MAP NOTE: INFORMATION/HELP DESK IS ON THE
Ross St Elementary School Referendum
Troy School District Bond Program – Series 1 Construction Update
South 6th Street 6th Avenue 5th Avenue
Troy School District Bond Program – Series 1 Construction Update
Cafeteria exit exit Entrance to media lobby 12
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
WES Renovation Update Photo Gallery
North Augusta High School – Phase 2A and 2B
Troy School District 2013 Bond Program – Series 1 Construction Update June 2016 Barton Malow | TMP.
Troy School District Bond Program – Series 1 Construction Update
N Learning Resources Center To Sim Lab Interior--- Office 115 ELEVATOR
EAST PENNSBORO AREA SCHOOL DISTRICT
A. Write the correct numbers !
Minuteman Vocational Technical Regional High School Progress
Presentation transcript:

UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS Board Meeting October 24, 2016

Building Area A – South Classroom wing closest to Doe Run Road Area B – Administration Suite, Main vestibule Area C - Gymnasium, Cafeteria, Kitchen Area D – North Classroom Wing

Area A - South Classroom wing closest to Doe Run Road South-East elevation South entrance Classroom near South stair tower Large Group Instruction area looking towards corridor. Main corridor, classroom on left with framing for lockers. Typical classroom

Area B – Administration Suite, Main vestibule Future music classrooms to the left Admin offices first floor, Media Center on 2nd floor. Main entrance structural steel

AREA C GYM CAFETERIA KITCHEN Looking through gymnasium. Gym looking at stage. Cafe in background. Main common area Cafeteria seating area

Area D – North Classroom Wing

Basement mechanical room and storage area

Site work – Bulk of curbing installed, preparing for rough coat of paving