EAAC, Isola d’Elba, September 2017, WG1

Slides:



Advertisements
Similar presentations
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Advertisements

Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop February 2007, Daresbury Laboratory.
ERLP Overview Hywel Owen ASTeC Daresbury Laboratory.
Before aperture After aperture Faraday Cup Trigger Photodiode Laser Energy Meter Phosphor Screen Solenoids Successful Initial X-Band Photoinjector Electron.
Cecile Limborg-Deprey Injector Commissioning September Injector Commissioning Plans C.Limborg-Deprey Gun exit measurements.
Cecile Limborg-Deprey Injector October Injector Physics C.Limborg-Deprey Diagnostics and Commissioning GTL measurements.
AWAKE workshop, Greifswald, September 24 th -26 th, 2014Steffen Döbert, BE-RF AWAKE electron source update.
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
AWAKE electron source New Electron Source WP at CERN
The AWAKE Project at CERN and its Connections to CTF3 Edda Gschwendtner, CERN.
New Electron Beam Test Facility EBTF at Daresbury Laboratory B.L. Militsyn on behalf of the ASTeC team Accelerator Science and Technology Centre Science.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
Low Emittance RF Gun Developments for PAL-XFEL
ASTRA Injector Setup 2012 Julian McKenzie 17/02/2012.
High Current Electron Source for Cooling Jefferson Lab Internal MEIC Accelerator Design Review January 17, 2014 Riad Suleiman.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
Kévin Pepitone 1CLIC project meeting, CERN, December 1st, 2015 Kevin PEPITONE, BE-RF Drive Beam Injector Gun.
RF scheme of electron linear accelerator with energy MeV Levichev A.E. Budker Institute of Nuclear Physics SB RAS.
G5 Design Review, April 24, 2009 Gun to 5cell Cavity Test: Overview Dmitry Kayran G5 test Design Review April,
Laboratoire de Chimie-Physique CNRS – Université Paris-Sud UMR ORSAY Cs 2 Te photocathodes at ELYSE.
NSLS-II Transfer Lines BUDKER INSTITUTE OF NUCLEAR PHYSICS NOVOSIBIRSK.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015.
Construction, Commissioning, and Operation of Injector Test Facility (ITF) for the PAL-XFEL November 12, 2013 S. J. Park, J. H. Hong, C. K. Min, I. Y.
AWAKE: A Proton-Driven Plasma Wakefield Acceleration Experiment at CERN C. Bracco on behalf of the AWAKE collaboration C. Bracco - ICHEP2014.
Kévin Pepitone 1CLIC workshop, CERN, January 2016 Kevin PEPITONE, BE-RF LEETCHI: Drive Beam Electron Source.
Main Technical Issues of theSuper B Injector Main Technical Issues of the Super B Injector SuperB Meeting, Isola d’Elba, May 31st – June 3rd, 2008 D. Alesini,
European Advanced Accelerator Concepts Workshop, Elba, September 14 th -18 th, 2015Steffen Döbert, BE-RF Electron accelerator for the AWAKE experiment.
X-band Based FEL proposal
CLIC DB injector facility, photo-injector option studies LCWS, Granada, September 26 th -30 th,2011Steffen Döbert, BE-RF  CLIC DB injector  Thermionic.
Injection System Update S. Guiducci (LNF) XVII SuperB Workshop La Biodola, Isola d'Elba, May 29 th 5/29/111.
B. Marchetti R. Assmann, U. Dorda, J. Grebenyuk, Y. Nie, J. Zhu Acknowledgements: C. Behrens, R. Brinkmann, K. Flöttmann, M. Hüning,
Development of High Brightness Electron Photoinjectors at ASTeC B.L. Militsyn Accelerator Science and Technology Centre Science & Technology Facility Council,
Status of the sub-harmonic bunching system for the CLIC DB injector front end Hamed Shaker School of Particles and Accelerators, Institute for Research.
Areal RF Station A. Vardanyan
An Electron source for PERLE
Primary Beam Lines for the Project at CERN
S.M. Polozov & Ko., NRNU MEPhI
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
Phil Oxford , june 18 Photoinjector at.
Summary of SPARC first-phase operations
Linac beam dynamics Linac dynamics : C. Bruni, S. Chancé, L. Garolfi,
A 6 GeV Compact X-ray FEL (CXFEL) Driven by an X-Band Linac
PHIL: A TEST BEAMLINE AT LAL Specifications of PHIL
Abstract EuSPARC and EuPRAXIA projects
Sara Thorin, MAX IV Laboratory
E-XFEL Status and First Beam Results
Status of the CLIC main beam injectors
Operation of the High-Charge PHIN RF Photoinjector with Cs3Sb Cathodes
Have a chance to operate your own beam at CERN
BUNCH LENGTH MEASUREMENT SYSTEM FOR 500 KV PHOTOCATHODE DC GUN AT IHEP
Timing and synchronization at SPARC
WP11: electron and proton beam testing
AWAKE status and readiness for phase #2
Injection facility for Novosibirsk Super Charm Tau Factory
MIT Compact X-ray Source
LCLS Commissioning Parameters
Electron Source Configuration
Status of the CLIC Injector studies
Injector: What is needed to improve the beam quality?
R. Suleiman and M. Poelker October 12, 2018
LCLS Commissioning Parameters
Advanced Research Electron Accelerator Laboratory
Compact linear accelerator FLUTE: status update
Injector Experimental Results John Schmerge, SSRL/SLAC April 24, 2002
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Proposal for Smith-Purcell radiation experiment at SPARC_LAB
Presentation transcript:

EAAC, Isola d’Elba, 24-30 September 2017, WG1 Status of the Electron source and transfer lines for the AWAKE Experiment at CERN Kévin PEPITONE Kévin PEPITONE CERN EAAC, Isola d’Elba, 24-30 September 2017, WG1

EAAC, Isola d’Elba, 24-30 September 2017, WG1 Acknowledgement University of Lancaster: Robert APSIMON CERN: Jeremie BAUCHE Marzia BERNARDINI Chiara BRACCO Alan CHAUCHET Heiko DAMERAU Steffen DOEBERT Eric CHEVALLAY Nicolas CHRITIN Stephane CURT Cédric DELORY Cockcroft institute: Graeme BURT Valentin FEDOSSEEV Florence FRIEBEL Frédéric GALLEAZZI Edda GSCHWENDTNER Lars JENSEN Lucia MARICALVA Stefano MAZZONI Ans PARDONS Janet SCHMIDT Lars SOBY University of Manchester: Oznur METE Triumf: Victor VERZILOV UCL: Fearghus KEEBLE AWAKE Collaboration CERN colleagues Kévin PEPITONE CERN EAAC, Isola d’Elba, 24-30 September 2017, WG1

EAAC, Isola d’Elba, 24-30 September 2017, WG1 Motivations Preliminary presented by K.Lotov at 11th AWAKE Physics Board Meeting, CERN 26.06.2015 EAAC, Isola d’Elba, 24-30 September 2017, WG1 Kévin PEPITONE CERN

EAAC, Isola d’Elba, 24-30 September 2017, WG1 The AWAKE Experiment Laser room Proton beam-line e- Klystron Electron beam-line Plasma cell Kévin PEPITONE CERN EAAC, Isola d’Elba, 24-30 September 2017, WG1

EAAC, Isola d’Elba, 24-30 September 2017, WG1 Awake electron beam Parameters Values Beam Energy 16 MeV Energy Spread (rms) 0.5 % Bunch Length (σ) 4 ps Synchronisation (laser/RF) 0.1 ps Synchronization to experiment Repetition Rate 10 Hz Spot Size (rms) 250 µm Normalised Emittance (rms) 2 mm mrad Nominal Bunch Charge 0.2 nC From a photo injector with: Cs2Te cathode QE = 12 % Φw = 4.66 eV EAAC, Isola d’Elba, 24-30 September 2017, WG1 Kévin PEPITONE CERN

Electron line and instruments Laser beam Instrument How many Resolution Who BTVs for transverse profile 2 ~20 um CERN BPMs 7 50 um Triumf Faraday Cup 1 10 pC Triumf Pepper-pot 1 < mm.mrad Manchester Electron beam FCT 1 10 pC CERN + a spectrometer Proton beam EAAC, Isola d’Elba, 24-30 September 2017, WG1 Kévin PEPITONE CERN

Electron beam dynamics Parmela simulation with r= 0.5mm, E=100 MV/m, Q=0.2 nC  e = 1.3 mm mrad (cm) (cm) (cm) (cm) EAAC, Isola d’Elba, 24-30 September 2017, WG1 Kévin PEPITONE CERN

Electron line Laser line Transfer line Electron source Diagnostics and booster structure Transfer line Kévin PEPITONE CERN EAAC, Isola d’Elba, 24-30 September 2017, WG1

EAAC, Isola d’Elba, 24-30 September 2017, WG1 Electron line Waveguides Laser line Kévin PEPITONE CERN EAAC, Isola d’Elba, 24-30 September 2017, WG1

Modulator Klystron Waveguides Oil tank PFN PS cabinet Control cabinet Interlocks rack LLRF rack Waveguides HV Parameters Unit Value Voltage (max) kV 42 Current (max) kA 5.4 Capacitor nF 28 x 25 Inductance µH 28 x 0.8 Impedance Ω 5.5-6 Pulse length (FWHM) µs (max) 3 Maximum repetition rate Hz 10 Oil (Shell Diala B) L ≈700 Pulse transformer turn ratio   1:15 Average charging capacitor rate kJ/s Modulator Power supplies Control 1.2 Tons 700 L of oil Klystron tank and retention box RF parameters Unit Value RF frequency MHz 2997.9 RF peak power MW ≈40 Pulse length (FWHM) µs (max) 3 Beam current A 360 Maximum repetition rate Hz 10 Kévin PEPITONE CERN EAAC, Isola d’Elba, 24-30 September 2017, WG1

First BPM and Pepper Pot Beam emittance measurement Kévin PEPITONE CERN EAAC, Isola d’Elba, 24-30 September 2017, WG1

EAAC, Isola d’Elba, 24-30 September 2017, WG1 Booster structure To be conditioned Constant gradient 2π/3 travelling wave structure at 2.99855 GHz 30 cells is just under 1 metre long 9.6 MW input power gives 15 MV Average group velocity is 1.23% c. The filling time is equal to 273 ns Kévin PEPITONE CERN EAAC, Isola d’Elba, 24-30 September 2017, WG1

EAAC, Isola d’Elba, 24-30 September 2017, WG1 BPM and Faraday Cup Absolute measurement of charge Beam position monitor, tested on CLEAR BPMs, Faraday Cup and electronics installed Kévin PEPITONE CERN EAAC, Isola d’Elba, 24-30 September 2017, WG1

EAAC, Isola d’Elba, 24-30 September 2017, WG1 BTVs and Beam stopper 2 screens: Chromox Ag coated Si (OTR) Software for 10 Hz operation Kévin PEPITONE CERN EAAC, Isola d’Elba, 24-30 September 2017, WG1

EAAC, Isola d’Elba, 24-30 September 2017, WG1 Spectrometer Kévin PEPITONE CERN EAAC, Isola d’Elba, 24-30 September 2017, WG1

Experimental results of the AWAKE experiment Summary Installation of the electron source took place in 2017 Installation will be finished by the end of October RF conditioning, installation of a Cs2Te cathode and then laser tests Commissioning of the electron source and commissioning of the electron line to the plasma cell entrance (with electrical and optical measurements) Electron beam commissioned by December 2017 Experimental results of the AWAKE experiment September 2019 4th EAAC workshop Kévin PEPITONE CERN EAAC, Isola d’Elba, 24-30 September 2017, WG1

Thank you for your attention Kévin PEPITONE CERN EAAC, Isola d’Elba, 24-30 September 2017, WG1