Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November 2013 20th SG meeting.

Slides:



Advertisements
Similar presentations
Allocation of Capacity in Portugal Under the New Regulation 24th IG meeting S-GRI, Madrid September 23, 2013.
Advertisements

15 November th SG meeting Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
15 th September 2013 Enagás and TIGF Information to NRAs.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
Roadmap for the early implementation of the CAM Network Code (CAM Roadmap) Main achievements to date and lessons learned Violeta Bescós, Market Adviser.
GRI South SG Meeting 15 November /11/2013 | Chart 2 After only 1 year the early CAM implementation by PRISMA started successfully on 1 April 2013…
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
PILOT PROJECT ON CAM 17 th SG meeting Madrid 27 th September 2012.
PILOT PROJECT FOR CAM HARMONISATION 16 th SG meeting Madrid 31 st May 2012.
Allocation of capacities between Portugal and Spain Madrid 30 th April 2013.
1 13 th December 2013 Teleconference 25 th IG Meeting South Gas Regional Initiative.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Draft CMP ROADMAP 19 SG meeting 30 th April 2013.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
25 th IG meeting 13 th December 2013 Enagás, REN and TIGF Issues to be discussed.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION Madrid 11 th July 2011.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
37 th IG meeting 31 st May 2016 Enagás, GRTgaz, Reganosa, REN and TIGF.
21 st SG meeting 19 th February 2014 Enagás, GRTgaz, REN and TIGF.
Madrid, 23rd Sep th SG Meeting South Gas Regional Initiative OSP and Interoperability.
29th November 2016 Teleconference
GRI North-West Meeting
SPANISH HUB DEVELOPMENT
Example for 1:n bundling with three TSOs
21st IG Meeting South Gas Regional Initiative
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
25th IG meeting 13th December 2013
New transparency guidelines
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
13th December 2013 Teleconference
Capacity Conversion – 616s
RO-HU-AT - a pilot project for incremental capacity
26th IG meeting 23th January 2014
4th October 2016 Teleconference
Allocation of Capacity in Portugal Under the New Regulation
Background and Process
CMP Transparency Requirements
18th July 2016 Teleconference
Roadmap for the early implementation of the CAM Network Code (CAM Roadmap) Main achievements to date and lessons learned Violeta Bescós, Market Adviser.
GRI North-West Meeting
Allocation of Capacity in Portugal Under the New Regulation
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
26th February 2015 Teleconference
41st IG meeting 24th January 2017
RO-HU-AT - a pilot project for incremental capacity
EWRC-RAE MUTUAL PROJECTS
Andrius Šimkus │ Energy Community Secretariat Tbilisi, 5 October 2018
29th April 2014 Teleconference
4th October 2016 Teleconference
18th July 2016 Teleconference
24rd SG meeting 8th february 2018
Questionnaire for the assessment of the main features of
41st IG meeting 24th January 2017
RO-HU-AT - a pilot project for incremental capacity
GRI North-West Meeting
Enagás, GRTgaz, REN and TIGF
29th November 2016 Teleconference
26th February 2015 Teleconference
12th December 2014 Teleconference
EWRC-RAE MUTUAL PROJECTS
EWRC-RAE MUTUAL PROJECTS
PRISMA General Information
Presentation transcript:

Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November 2013 20th SG meeting

1. VIP Available capacity at the two existing physical IPs between Spain and Portugal, Badajoz-Campo Maior and Tuy-Valença do Minho, will be offered at a single VIP. From 1 October 2014 all existing contracts at the physical interconnection points, Badajoz-Campo Maior and Tuy-Valença do Minho, will be transferred into the VIP between Portugal and Spain. VIP

2. Bundled capacity Enagás and REN will jointly offer the maximum possible amount of bundled capacity between Spain and Portugal in both flow directions. According to the CAM NC bundled capacity means a standard capacity product offered on a firm basis, which consists of corresponding entry and exit capacity at both sides of every interconnection point. This implies that: Each standard product offered includes the same amount of capacity on both sides. Capacities will be booked through a single allocation procedure. Capacities will be allocated to the same Shipper at both sides of the IP. Transactions held on the secondary market must not result in unbundling capacities that were previously offered and allocated as bundled capacities. This does not imply that a single contract will be put in place. Shippers will have to sign a contract with the respective TSO in order to be allowed to participate in the auctions.

3. Firm and interruptible capacity All products will be firm unless otherwise stated. Once the auction for the corresponding firm product has finished, each TSO will decide whether to offer the corresponding interruptible product in a second slot. Interruptible products will only be offered if 100% of the corresponding firm product has previously been allocated in the related auctions.

4. Standard products The standard capacity products offered by Enagás and REN will be those included in Article 9 of the CAM NC. The following standard capacity products will be offered from November 2015: Yearly standard capacity products Quarterly standard capacity products Monthly standard capacity products Daily standard capacity products Within-day standard capacity products During the gas year 2014, Enagás and REN will offer all standard capacity products except within-day standard capacity products, which will be available from November 2015.

5. Auctions 2014 auctions Until the binding application of the CAM NC as from November 2015 the following auctions will be held for bundled and unbundled products: Annual yearly capacity auctions Annual quarterly capacity auctions Rolling monthly capacity auctions Daily products will be allocated through FCFS until November 2015, except for current daily unbundled products available on the Portuguese side, which will be allocated through auctions 2015 auctions and onwards As from November 2015, Enagás and REN will implement all the auctions included in the CAM NC. Thus, no capacity will be allocated on FCFS basis.

6. Auction algorithms Ascending clock auction algorithm For annual yearly, annual quarterly and rolling monthly capacity auctions, an ascending clock algorithm with multiple bidding rounds shall be applied. The ascending clock auction algorithm to be applied is described in Article 17 of the CAM NC. Uniform-Price auction algorithm For rolling day-ahead and within-day capacity auctions a uniform-price auction algorithm with a single bidding round shall be applied. The uniform-price auction algorithm to be applied is described in Article 18 of the CAM NC.

7. Booking platform All bundled capacity auctions will be carried out via PRISMA booking platform: https://primary.prisma-capacity.eu/ Shippers may register at PRISMA platform as from January 2014. There will be a 8 week period available for Shipper’s registration before the first auction, March 2014. In order to present to Shippers the new booking platform, Enagás and REN shall perform 2 training workshops with the participation of PRISMA experts. These will take place in January 2014 and will give the opportunity to Shippers to get acquainted with the platform.

8. Requirements to participate In order to participate in an auction, Shippers and eligible customers licensed in Portugal and Spain (“Shippers”) shall be registered at PRISMA booking platform. The requirements for registration are established in the PRISMA General Terms and Conditions (currently under revision, so new version of GTCs is expected as from 1st January 2014). EIC The first requirement for registration is to have a valid Energy Identification Code (EIC). The EIC consists of 16 characters given to a market party to be identified in the Energy Internal European Market in a harmonized way. Since 1 March 2013, ENTSOG is acting as Local Issuing Office for the EIC. The code shall be globally unique: only one code is allocated per organization (business group); the same Shipper on both sides of the border will have the same EIC code. 1 http://www.entsog.eu/eic-codes/eic-party-codes-x-request

8. Requirements to participate 2 Registration to use PRISMA According to PRISMA GTCs, the registration process of the Shipper and its first user requires the following information to be provided to PRISMA: Energy Identification Code of the Shipper (EIC). Company name and address of the Shipper. User information: title, last name, first name, telephone number, e-mail address. Other Shipper information: billing address, IBAN, BIC, legal representatives and VAT number. Additional identification code if requested by TSO. Registration to conclude bookings and to participate in auctions Adjacent TSOs on both sides of a border must approve users’ registration request. At this stage, TSOs must confirm that the Shipper is allowed to operate in their country, according to the national regulatory framework (if the Shipper has trading license where required, etc...). 3

8. Requirements to participate Shipper registration process is detailed in the figure below, further information will be provided by PRISMA and TSOs.

8. Requirements on the Spanish side In order to be able to participate in auctions Shippers must be registered as licensed Shippers in the Spanish system. The requirements and procedure to get the license are detailed by the MINETUR at the following link: http://www.minetur.gob.es/energia/gas/Requisitos/Paginas/comercializador.aspx Then, Shippers will have to sign the Standard Contract with Enagás in advance in order to participate in the auctions. The Standard Contract will only be signed once during the registration process to conclude bookings and to participate in auctions with Enagás at PRISMA booking platform. Capacity allocated to a Shipper at PRISMA booking platform will be automatically introduced at the SL-ATR, thus this allocation will be binding for Shippers and it will not be necessary to sign any additional document. Once the Shipper has been informed of the allocation of capacities, it will be informed of the financial guarantees associated to the contracted capacity he has to put in place in favor of Enagás. These financial guarantees are detailed in Royal Decree 949/2001. No financial guarantees to participate in the auctions will be required.

8. Requirements on the Portuguese side In order to be able to participate in auctions Shippers must have concluded their registration process at DGEG (Direção Geral de Energia e Geologia), the Portuguese governmental entity responsible for the registration process, in respect to the Decree-Law 231/2012, of 26 of October. More information available in: http://www.dgeg.pt/ Before participating in the first auction, Shippers will have to sign the Standard Contract with REN and present financial guaranties in favor of REN-Gasodutos, S.A., that are meant to cover their participation in each auction process. As capacity is being allocated after each auction, it will be joined to the contract via an annex for each contracted product. As current Shippers shall already have presented financial guaranties to REN in relation to the Network Utilization Contract before, these shall be taken into account when calculating the new guaranties.

9. 2014 Calendar

Thank you for your attention 15 November 2013 20th SG meeting