02:21 Full System Decontamination at the Obrigheim Nuclear Power Plant Prior to Decommissioning Wilhelm Kukla, EnBW Kernkraft GmbH, Obrigheim NPP Christian.

Slides:



Advertisements
Similar presentations
1 DECONTAMINATION (INDUSTRIAL APPLICATION) M. Detilleux Belgatom.
Advertisements

11-Apr ISOE International ALARA Symposium JNES, Tokyo, JAPAN, August,2013 Presentation on: Dose Reduction and Management during Overhauling.
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
Primary Water Chemistry
1 Decontamination techniques Experience and perspectives for Russian NPP units.
Heat Recovery for Commercial Buildings
Lesson 18 - Decay Heat DEFINE the term decay heat. Given the operating conditions of a reactor core and the necessary formulas, CALCULATE the core decay.
1 August 30-31,2010 Kyushu Electric Power Co.,Inc. Nuclear Power Operatio n Dept. Masahiro Yoshinaga Approach for dose reduction in Sendai NPS August 30-31,2010.
n.ogv
1 WASTE CHARACTERIZATION METHODS S. Vanderperre Belgatom Vanderperre, Belgatom, chapter 7.
“Energy Efficiency Guide for Industry in Asia”
1 Successful decommissioning of a nuclear plant Evelyn Hooft Bart Thieren 20 june 2008.
NUCLEAR ENERGY What is it? David J. Diamond Energy Sciences & Technology Department February 2009.
POWER PLANT.
NUCLEAR SAFETY Barbora Svobodová Angličtina-odborná II.
MODULE “STRATEGY DEVELOPMENT”
1 CHAPTER 9 MATERIAL MANAGEMENT Demeulemeester Yves BR3 Dismantling project SCKCEN.
 A nuclear reactor produces and controls the release of energy from splitting the atoms of certain elements. In a nuclear power reactor, the energy released.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
ALARA Activities at Ohi NPP Ohi Nuclear Power Plant Kansai Electric Power Co., Inc.
1 OCCUPATIONAL EXPOSURE at JAPANESE NUCLEAR POWER PLANTS in 2005 October 12, 2006 Shigeyuki Wada Safety Information Division Japan Nuclear Energy Safety.
Boreskov Institute of Catalysis INTERNATIONAL CENTER FOR SCIENCE AND HIGH TECHNOLOGY OF THE UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION Workshop.
SAFESPUR 9/7/08 1 Innovation in Nuclear Decommissioning: New Technologies and Research, SAFESPUR Forum, July 9, 2008 G.R. Elder Bradtec Decon Technologies.
1 MATERIAL MANAGEMENT Emond Olivier BR3 Dismantling project Group Leader D&D material management SCKCEN Emond O. SCK-CEN chapter 6.
Group New Projects Related to Decommissioning. 29 th May 2008 KNPP Richard Benbow – Head of Kozloduy PMU.
MODULE “COST ESTIMATION, CALCULATION AND COST CONTROL” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da.
1 TW4-TSW-001/D1c: Watching brief activities in the field of radioactive waste management: Detritiation K. Dylst, J. Braet, A. Bruggeman SCKCEN Final meeting.
Final Meeting TW5-TSW-001 Deliverable 7 SCKCEN, L. OomsCulham, October 23–24, 2006.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Nuclear Thermal Hydraulic System Experiment
1 TEPCO’s Challenges for Occupational Exposure Reduction -Installation of Additional CF in Fukushima Daiichi NPP- Shunsuke HORI, Akira SUZUKI Tokyo Electric.
ISOE/ATC ALARA Symposium 2006 The Japan Atomic Power Company 1 Progress of the Zinc Injection in Tsuruga NPP Unit 2 October 12, 2006 THE JAPAN ATOMIC POWER.
Welcome to the Presentation of Plasma Based HNO3 Manufacturing Plant.
Calder Hall Sellafield Decommissioning Martin Adam Heriot-Watt Edinburgh 2008.
Nuclear Power Plant How A Nuclear Reactor Works.
Nuclear Power Plant How A Nuclear Reactor Works. Pressurized Water Reactor - Nuclear Power Plant.
1 ALARA at the Borssele nuclear power plant. 2 ALARA at the Borssele P Borssele  NPP Borssele  In the delta in the Southwest of the Netherlands  KWU.
L I NGAYA'S INSTT. OF MGT. AND TECHNOLOGY, FBD. THERMAL POWER PLANT OVERVIEW.
Unit 2, Genkai Nuclear Power Plant
FULL SYSTEM DECONTAMINATION (FSD) OF THE PWR STADE PRIOR TO DECOMMISSIONING
Reduction of the collective doses in Almaraz Nuclear Power Plant through source term reduction and the work load reduction.
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Benefits and limitations of RIDM by Géza.
ISOE Asian Technical Center 2005ALARA Mini-Workshop Fugen Nuclear Power Station, JAEA- 1 Demonstration of Zinc Injection Technique in Fugen Nuclear Power.
RPM Meeting , Essen Forsmark 1 Generator output net 968 MWe Critical reactor April 23, 1980 Commercial operation December 10, 1980 Forsmark 2.
Slide 1 3rd EC/IAEA/ISOE Workshop on ”Occupational Exposure Management in Nuclear Power Plants” Fuel decontamination at Ringhals 1 with the new decontamination.
Hokuriku Electric Power Company Dose Reduction Measures at Shika Nuclear Power Station Unit-1 Takahashi Toshihiko Hokuriku Electric Power Company.
ISOE-Europe 3/25/04 1 San Onofre Unit 1 Decommissioning Eric M. Goldin Eric M. Goldin Southern California Edison Company.
COLLEGE OF ENGINEERING DEPARTMENT OF MECHANICAL ENGINEERING MENB INTRODUCTION TO NUCLEAR ENGINEERING GROUP ASSIGNMENT GROUP MEMBERS: MOHD DZAFIR.
Radioactive Waste Management Infrastructure in Egypt:
28-Jan ISOE International ALARA Symposium JNES, Tokyo, JAPAN, August,2013 Presentation on: Dose Reduction and Management during Overhauling.
2013 ISOE International ALARA Symposium
ENVIRONMENTAL PROTECTION External EHS Expert Panel Workshop
Preliminary Decommissioning Plan for the Canadian Light Source
John Christian President, Logistics, Processing and Disposal
ALARA Activities at Ohi NPP
AN INTEGRAL PWR, “CAREM”, IS BEING DEVELOPED BY CNEA, ARGENTINA
Radiation Safety Management
Operational Experience with Zinc Injection at Angra 2
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
BNFL Instruments, British Nuclear Fuels plc.
Pressurized Water Reactor
PRODUCTS (POWER PLANT)
SAFETY AND SITTING ASSESSMENT FOR NPPs DEPLOYMENT IN INDONESIA
Session Name: Lessons Learned from Mega Projects
4th ISOE European Workshop on Occupational Exposure Management at NPPs Lyon, France, March 2004 Kirsi Alm-Lytz Radiation and Nuclear Safety Authority.
Radioactive waste management - status
NUCLEAR ENERGY What is it?
The Improvement of ALARA for the Steam Generator Maintenance
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
Terry A. Ring Chemical Engineering University of Utah
Presentation transcript:

02:21 Full System Decontamination at the Obrigheim Nuclear Power Plant Prior to Decommissioning Wilhelm Kukla, EnBW Kernkraft GmbH, Obrigheim NPP Christian Topf, AREVA NP GmbH, Erlangen History of NPP Obrigheim Considerations Decontamination Targets Systems included in decontamination Technical description of the decontamination Results

Full System Decontamination at the Obrigheim Nuclear Power Plant time of construction: 1965 – 1968 design two loops 1. criticality: Oktober 1968 thermal reactor power: 1,050 MWth exchange steam generators: 1983 operating time: 01.03.1969 – 12.05.2005 total gross production: 90,828 TWh capacity factor: 81.4 %

Full System Decontamination at the Obrigheim Nuclear Power Plant Considerations After final shut down of the NPP - decontamination of primary coolant system - wait until activity is reduced by decay Decision Carrying out decontamination - activity is reduced faster as by natural decay - ensures that the experienced plant personal with intimate system and operating knowledge is still available - functionality and usability of all NPP systems is already given

Full System Decontamination at the Obrigheim Nuclear Power Plant Decontamination Targets: • Reduction of the activity inventory in all systems included in the decontamination • Reduction of the ambient dose rate in working areas • No significant shift of the gamma/alpha ratio • Minimum waste generation • Average decontamination factor of more than 10

Full System Decontamination at the Obrigheim Nuclear Power Plant Systems and components included in decontamination: • Reactor pressure vessel with internals, no fuel • Pressurizer • Primary circuit (two loops) including steam generators as well as part of: • Residuel heat removal system • Volume control system • Emergency injection system • Mechanical filters of the chemical purification system

Full System Decontamination at the Obrigheim Nuclear Power Plant Total volume: 160 m³ Surface total: 8,100 m² Is composed of: Incaloy 800 (SG) 6,200 m² austenitic weld cladding (primary circiut) 1,100 m² austenitic CrNi steel (auxilary systems) 800 m²

Full System Decontamination at the Obrigheim Nuclear Power Plant Additional supporting systems: chemical injection system component cooling system coolant storage building drains spent resin tanks

Full System Decontamination at the Obrigheim Nuclear Power Plant Technical description of the decontamination: AREVA NP GmbH obtained the contract, performance: first quarter 2007 AREVA NP used HP/Cord UV decontamination technology in combination with the AMDA equipment. HP: Permanganic acid (the chemical used for preoxidation). CORD: Chemial Oxidation Reduction Decontamination; represents the chemical decontamination process. UV: Represents the in-situ decomposition of the decontamination chemical with an ultraviolet light source. AMDA: Automated Mobile Decontamination Appliance, is the synonym for the external decontamination equipment of AREVA NP.

Full System Decontamination at the Obrigheim Nuclear Power Plant HP/CORD UV process is a multi-cycle process including following steps: Step 1: Pre-oxidation with HP Step 2: HP reduction with the decontamination chemical Step 3: Decontamination Step 4: UV decomposition of the decontamination chemical and solvent clean-up

Full System Decontamination at the Obrigheim Nuclear Power Plant Results: A total of four HP/CORD UV cycles were performed cation removal 224 kg activity removal 5.6 E12 Bq (151 Ci) with > 95 % Co60 ion exchange resins 6.7 m³

Full System Decontamination at the Obrigheim Nuclear Power Plant before: SG 2100 µSv/h; channel head 72 mSv/h after: 1,6 µSv/h; 1,2 mSv/h

Full System Decontamination at the Obrigheim Nuclear Power Plant Results: Average decontamination factors (DF) DF auxilary systems 29 DF primary system 736 DF steam generators tubing 1409 DF overall average 625 Gamma/alpha nuclide ratio: increased about factor 10 Total man dosis 46.1 mSv Estimated 97 mSv

Full System Decontamination at the Obrigheim Nuclear Power Plant RESULTS - Reduction of the ambient dose rate in the different areas: steam generators residuel heat removal heat exchangers chemical volume control system recuperative heat exchanger - Easy handling for dismantling and disposal of these components, especially for the steam generators

Full System Decontamination at the Obrigheim Nuclear Power Plant RESULTS - No controlled rooms more in this area, the single hot spots were shielded and will be decontaminated in a special prozess - Man-Sv savings for upcoming dismantling acitivities (1 - 1,5 Sv)

Full System Decontamination at the Obrigheim Nuclear Power Plant Thank you for your attention!