Moving Ahead for Progress in the 21st Century Act (MAP-21)

Slides:



Advertisements
Similar presentations
Tribal Consultations. Topics FY12 Extensions and IRR Program Funding MAP-21 Programs and Funding.
Advertisements

Idaho Project Development Conference Boise, Idaho April 2, 2013 Federal Transit Administration.
MAP-21 Performance Management Framework August 8, 2013 Sherry Riklin Bob Tuccillo Angela Dluger The Moving Ahead for Progress in the 21st Century Act (MAP-21)
Performance Elements National Goals Performance Measures Performance Targets Performance Plans Target Achievement Special Performance Rules Performance.
Capital Investment Program Listening Session Presented at APTA Annual Meeting -- 10/03/2012 RailVolution /14/
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Management.
JULY 23,  Legislative Update ◦ Highway Trust Fund status ◦ Reauthorization proposals ◦ FY15 Appropriations  TTP Safety Funding  TTP Bridge Funding.
MAP Washington State Public Transportation Symposium August 26, 2013.
January 16, 2014 Federal Highway Administration Arizona Rural Transportation Summit.
MAP-21 Overview and Programmatic Impacts February 4, 2013 Serge Phillips MnDOT Federal Relations Koryn Zewers.
© 2015 AMPO 444 North Capitol Street NW, Suite 345 Washington, DC tel: fax: Washington Update MAP-21 Reauthorization, Highway.
Jack Basso Director of Program Finance and Management American Association of State Highway and Transportation Officials Audit Subcommittee Meeting Phoenix,
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users SAFETEA-LU Key Highway Safety Provisions Elizabeth Alicandri FHWA.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users SAFETEA-LU Key Safety Provisions Federal Highway Administration.
Irene Rico Division Administrator Federal Highway Administration Moving Ahead for Progress in the 21 st Century ~ MAP-21.
MAP-21: Bridges and Structures Moderated By Joey Hartmann Team Leader, Office of Bridge Technology Federal Highway Administration HIBT Webinar on MAP-21.
1 SAFETEA: Transportation System Management, Operations and ITS Jeffrey F. Paniati Associate Administrator, Office of Operations Federal Highway Administration.
Federal MAP-21 Programs 1 Module 7 Safety Analysis in a Data-limited, Local Agency Environment July 22, Boise, Idaho.
FHWA LTAP/TTAP Update Technology Partnerships Programs 2012 LTAP/TTAP National Conference: Grapevine, TX.
Performance Measurement Requirements Notice of Proposed Rule Making.
Accomplished to date:  Extensive outreach  Guidance and FAQs on most programs  FY13 apportionments Underway:  Final guidance and FAQs on some topics.
Funding Levels Similar funding levels to the Transportation Enhancement Activities under SAFETEA-LU: FY 2013: $808,760,000 FY 2014: $819,900,000 Total.
Statewide Local Agency Project Delivery Conference SAFETEA-LU: Earmarks and Federal Programs Relating to Local Agencies Travis Brouwer ODOT Federal Affairs.
Washington Update Department of Transportation Roger Petzold Federal Highway Administration Oct. 23, 2013.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
Moving Ahead for Progress in the 21 st Century Act of 2011 Potential Freight Implications FHWA Talking Freight December 2011 Tony Furst, Director FHWA.
FY 2012 President’s Budget Released February 14, 2011.
MAP-21 and Other Issues FHWA Update IFTA/IRP Manager’s / Law Enforcement Workshop September 2012.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration Regional Workshop on Performance Management and Performance-Based.
Ron Hall Tribal Technical Assistance Program Colorado State University
MAP-21 Moving Ahead for Progress in the 21 st Century Virginia Association of Planning District Commissions October 4, 2012.
KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.
Surface Transportation Authorization AASHTO Executive Director John Horsley SCOH Subcommittee on Construction Chicago, Illinois August 4, 2009.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO TCC & CAC Presentation – August 21, 2012.
U.S./Canada Transportation Border Working group April 9, 2014 Roger Petzold Office of Planning Federal Highway Administration.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO Board Presentation September 25, 2012.
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey A. Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
‘‘Moving Ahead for Progress in the 21st Century Act’’ or ‘‘MAP–21’’ Signed into Law July 6, 2012 Implications for Infrastructure Asset Management, Pavement.
Nelson Castellanos Federal Highway Administration March 12, 2013.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Measure Update.
Highway Program Structure Highway Recommendations Neil Pedersen Chair, ASC Highway Legislative Team Vice Chair, AASHTO Standing Committee on Highways Administrator,
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey F. Paniati Office of Operations Federal Highway Administration U.S. Department of Transportation.
SAFETEA-LU System Management and Operations Key Provisions Jeff Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
IFTA Annual Business Meeting Virginia Beach, VA August 17, 2011 Federal Highway Administration.
November 8, MAP-21 themes 2 Strengthens America’s highway and public transportation systems Creates jobs and supports economic growth Supports the.
Fixing America’s Surface Transportation (FAST Act) Association of MPOs 444 N Capitol St., NW Suite345 Washington, DC
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21st Century An Update on Implementation.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 and Managing National Highway Performance Michael Nesbitt Federal Highway.
FAST, What does the new transportation bill mean to you April 6, 2016.
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/2013.
Developed from a summary prepared for the New York State Association of MPOs 1.
Federal Performance Update MPO Coordination Meeting May 10, 2016.
MAP 21 Freight Talking Freight December 14, 2011 Leo Penne AASHTO.
Title Subtitle Meeting Date Office of Transportation Performance Management Transportation Performance Management Metropolitan Planning Organization (MPO)
Nevada Transportation Conference
P.L Fixing America’s Surface Transportation (FAST) Act
Central Minnesota Area Transportation Partnership Primer Welcome
FAST Act Overview $305 billion 5 year bill – FY ‘16 – FY ’20
Overview of Changes Made to CMAQ & System Performance Measures
River to Sea TPO Board Meeting September 28, 2016
River to Sea TPO Board Meeting October 26, 2016
Metropolitan Planning Organization
P.L Fixing America’s Surface Transportation (FAST) Act
Laurie Leffler, Division Administrator
Michael Koontz November 2013
MPO/RPO Safety Performance Measures
River to Sea TPO CAC & TCC Meetings September 20, 2016
Moving Ahead for Progress in the 21st Century Act (MAP-21)
Performance-Based Federal Highway Program Implementation Update
MAP-21: Current Federal Transportation Policy
Presentation transcript:

Moving Ahead for Progress in the 21st Century Act (MAP-21) April 9, 2013

Stability and solvency through FY14 MAP-21 enacted following 10 extensions of SAFETEA-LU Passed Congress with strong bipartisan votes Authorized program through FY14 Average annual funding at FY12 levels Extended Highway Trust Fund (HTF) taxes Made transfers to keep HTF solvent through FY14

Investment and reform under MAP-21 Strengthened America’s highway & public transit systems Created jobs and supported economic growth Supported DOT’s aggressive safety agenda Simplified and focused the Federal program Accelerated project delivery and promoted innovation Established a performance-based Federal program

Apportioned programs

Program structure MAP-21 Prior Law (SAFETEA-LU) National Highway Performance Program (NHPP) NHS, IM, & Bridge (portion) Surface Transportation Program (STP) STP & Bridge (portion) Congestion Mitigation & Air Quality Improvement Program (CMAQ) CMAQ Highway Safety Improvement Program (HSIP) HSIP (incl. High Risk Rural Roads) Railway-Highway Grade Crossing (takedown from HSIP) Metropolitan Planning Transportation Alternatives (set-aside from NHPP, STP, HSIP, CMAQ, Metro Planning) TE, Recreational Trails, & Safe Routes to School

$37.7 billion/year in formula funding HSIP ($2.2) Surface Transportation Program ($10.0) Railway-Highway Crossing ($0.2) CMAQ ($2.2) TAP ($0.8) Metro Planning ($0.3) National Highway Performance Program ($21.8) Note: Amounts in $ billions; program amounts do not add exactly to total due to rounding

National Highway Preservation Program What’s in the law? Implementation FY13 funds apportioned  Consolidation of NHS, IM, Bridge Programs NHS expanded to include all principal arterials, STRAHNET, intermodal connectors Requirement for asset management plan States set targets for condition, performance Min. Interstate & bridge condition standards NHPP guidance  Updated NHS maps  Asset mgmt. rule Condition measures

Surface Transportation Program What’s in the law? Implementation FY13 funds apportioned  Continued flexible funding for Fed-aid highways plus safety and bridges on any public road Eligibilities encompass some former programs Off-system bridge set-aside 50% of funds suballocated based on population STP guidance 

Highway Safety Improvement Program What’s in the law? Implementation FY13 funds apportioned  +$1B / year vs. prior funding levels States must now regularly update SHSP Takedown for railway-highway grade crossings No rural road set-aside unless safety worsens DOT to establish measures and States to set targets for fatalities and serious injuries Stronger link between HSIP, NHTSA programs HSIP guidance  High Risk Rural Road guidance  HSIP rule Safety perf. measures

Congestion Mitigation & Air Quality What’s in the law? Implementation FY13 funds apportioned  Continuation of current program with changes Performance plans for large TMAs States with PM 2.5 areas must address PM 2.5 Some authority to use $ for transit operations $ may be used on facilities for electric or natural gas-fueled vehicles Required study assessing CMAQ outcomes CMAQ interim guidance  CMAQ perf. measures Outcomes assessment study

Transportation Alternatives Program What’s in the law? Implementation FY13 funds apportioned  Most eligibilities from former programs (TE, rec trails, Safe Routes to Schools) Rec trails set-aside (unless State opts out) $ / yr approx. equal TE under SAFETEA-LU Funding suballocated similar to under STP Competitive grants to eligible entities TAP interim guidance 

Other programs & key provisions

Federal Lands & Tribal Transportation What’s in the law? Implementation FLTP guidance  Federal Lands Transportation Program (new partners that compete for funding) Federal Lands Access Program (Tripartite committee: FHWA, State, local) Tribal Transportation Program (new distribution formula among Tribes) Tribal High Priority Projects Program (subject to General Fund appropriation) Access Program guidance  TTP guidance  FY13 funds allocated (except Tribal HPPs) 

 TIFIA program What’s in the law? Implementation FY13 TIFIA NOFA Lending capacity expanded: up to $17 B in credit assistance over 2 years Applications accepted throughout the year Support for ≤ 49% of eligible project costs Master credit agreement for programs of projects, phased single projects ≤ 10% set-aside for rural projects; for these projects, increased eligibility, lower interest rates

    Freight provisions What’s in the law? Implementation Process for establishing NFN  National Freight Policy and strategic plan National Freight Network (NFN) Freight C&P reports Encouragement of State freight advisory committees and freight plans DOT may increase Federal share for freight projects in some circumstances Interim guidance on State freight committees, plans  Guidance on Federal share  Notice establishing freight advisory committee 

Research, Technology Deployment, Training & Education Annual $ Highway Research & Development $115.0 M Technology & Innovation Deployment $62.5 M Training & Education $24.0 M ITS Program $100.0 M University Transportation Centers $72.5 M Bureau of Transportation Statistics $26.0 M SHRP 2 implementation (4% set-aside from SPR) TBD

Performance, planning, & project delivery

Performance management What’s in the law? Implementation Q&As on performance management  MAP-21 identifies national goal areas DOT establishes measures, with input States set targets, then MPOs set targets State & metro plans describe how program & project selection will help achieve targets States report to DOT on progress toward targets Reports typically lead to corrective actions (not sanctions) Performance measure rule

Transportation planning What’s in the law? Implementation Q&As on Metro and Statewide Planning  MPOs still at 50K pop.; TMAs still at 200K pop. Transition to performance-based process MPOs to establish performance targets TIP updates at least every 4 years MPO in a TMA selects all non-NHS projects Long range plans report on conditions and performance relative to measures, targets RPOs (if in place) must be consulted Planning rule

Accelerating project delivery Ability for States to assume specific CE designations in FHWA NEPA regulations Use of construction manager/general contractor (CMGC) Accelerated completion of complex projects (4 years) when State requests technical assistance Increased Federal share for some innovative techniques Streamlining of environmental review process Expanded authority for categorical exclusions

Rulemaking Rulemaking activities include: Consultation with stakeholders Drafting of the Notice of Proposed Rulemaking (NPRM) Completion of an Economic Assessment that looks at the impact of the proposed rule on States, MPOs and other stakeholders Coordination of rulemakings 90 day minimum comment period required after NPRM is published Publication of final rule in Federal Register including an effective date

Implementation is well underway! MAP-21 summary and fact sheets available online Guidance posted online for most programs by the October 1, 2012, deadline NPRMs on CEs for projects in the Operational ROW or receiving limited Federal assistance More guidance and rulemaking activity to come, with related outreach Watch FHWA’s MAP-21 web site http://www.fhwa.dot.gov/map21

Questions?