Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.

Slides:



Advertisements
Similar presentations
Technology Module: Technology Readiness Levels (TRLs) Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture.
Advertisements

C.B. Cochrane 1 Jan 2009 The 5000 documents have been issued as a directive, two directives, a directive and an instruction, a directive and a regulation,
MODIFICATION 5/ N N Y PROGRAM TO BE MODIFIED STILL IN PRODUCTION 6/ Y SEPARATE ACQUISITION EFFORT 5/ N TOTAL COST OF MODIFICATION >= MAIS or MDAP 5/, 8/
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
Phase B Exit Criteria Issues Resolved or Addressed Technical Reviews / Readiness Reviews, Audits Initiate Milestone C Program Review Planning Process Initiate.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities.
Initiate Technology Development Finalize AoA Plan, AS, ICD, TDS, Develop CDD, and TEMP Initiate Milestone B Program Review Planning Process Initiate Acquisition.
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Life Cycle Logistics.
System Integration Exit Criteria Issues Resolved or Addressed Preliminary Design Review/Critical Design Review, Audits Initiate Design Readiness Review.
1 3 Dec 2008 Changes from the May 2003 DoDI Policy Flowing from Numerous New/Revised sections of Public Law since 2003 (some with Multiple Requirements)
PEO C4I and SPACE FULL-RATE PRODUCTION REVIEW TIMELINE
1 1 Defense Acquisition Guidebook Progress Update March 27, 2012.
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
Materiel Development Decision (MDD) Information Requirements
Business, Cost Estimating & Financial Management Considerations
PRODUCTION/ DEPLOYMENT
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
DoD Template for Application of TLCSM and PBL
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
System Engineering Considerations (See Chapters 3 and 9)
Technology Readiness Assessment (TRA)
Life Cycle Logistics.
DT&E Strategy and the Developmental Evaluation Framework (DEF) Concept & Program Implementation 5 June 2014.
MNS - Mission need statement
Competitive Prototyping – the New Reality
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
MDD to Milestone A Requirements Management Activities
NSS SMC/XR Template SMC April 2008; rev19 Program Management
ISA 201 Intermediate Information Systems Acquisition
DAE CAE PEO PM OIPT Acquisition Category (FY14 $) ACAT ID
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
ISA 201 Intermediate Information Systems Acquisition
Cumulative IOT&E Results Through FY 2008
New Space Systems Acquisition Policy
DAG CH 3 Figure 11: Weapon System Development Life Cycle
ISA 201 Intermediate Information Systems Acquisition
Milestone B to Full Operational Capability (FOC) Requirements Management Activities RQM-310, December 2016.
Test and Evaluation Considerations
DAG CH 3 Figure 17: Weapon System Development Life Cycle
DAG CH 3 Figure 23: Weapon System Development Life Cycle
DoDI Approved 8 December 2008
Milestone A to Milestone B Requirements Management Activities
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
Information Required for Milestone and Decision Reviews
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
DAG CH 3 Figure 13: Weapon System Development Life Cycle
DAG CH 3 Figure 19: Weapon System Development Life Cycle
Product Support Considerations
DAG CH 3 Figure 18: Weapon System Development Life Cycle
The Department of Defense Acquisition Process
Medical Development Program
Presentation transcript:

Milestone B to Initial Operational Capability (IOC) Requirements Management Activities Tom Fritz thomas.fritz@dau.mil 703 805 4583

Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability Compare and contrast the purpose and major activities of the Engineering and Manufacturing Development phase and the Production and Deployment phase Assess the decisions and approvals that take place at the Post-CDR Assessment, Milestone C, and the Full-Rate Production Decision Review

Milestone B to IOC EMD and Production & Deployment Full Rate Prod Decision Review Joint Concepts Capabilities - Based Assessment MS C MS B FCB Strategic Guidance Incremental Development MS A Technology Development Engineering & Manufacturing Development Production & Deployment AoA Materiel Solution Analysis Technology Opportunities & Resources ICD O&S User Needs MDD CDD CPD

Milestone B to IOC Requirements Management Activities Purpose: Develop system or increment of capability; complete full system integration Major Activities: T&E of production representative systems Purpose: Deliver systems, support materiel and services to the warfighter; attain IOC Major Activities: T&E of production systems, production, fielding Engineering & Manufacturing Development B C CDD Post CDR Assessment CPD Production & Deployment FRP Decision Review LRIP & IOT&E Full-Rate Production & Deployment IOC Integrated Systems Design Systems Capability & Manufacturing Process Demo CDR TRA Requirements Management Activities Develop CPD Participate in IPTs & Technical Reviews Milestone & Decision Reviews Monitor/provide input (*Table H-1 CPD Linkage to Program Documents) DT/OT, Live Fire T&E, Interoperability Testing / ISP* Updated TEMP*, APB*, Acquisition Strategy*, Cost Estimate, PPBE, LCSP TRA

Critical Design Review (CDR) CDR establishes the initial product baseline* to ensure that the system has a reasonable expectation of satisfying the requirements of the CDD Any changes during EMD are incorporated and after CDR the CDD evolves to the CPD required at Milestone C CDR also approves the product baselines for maintainability, supportability, and logistics elements. After CDR, production-representative articles will be produced for testing against the KPPs and technical requirements Once the initial product baseline is established, opportunities to improve performance or reduce life-cycle costs are severely limited *Product Baseline—Documentation describing all necessary functional and physical characteristics of a configuration item; the selected functional and physical characteristics designated for production acceptance testing; and tests necessary for deployment/installation, operation, support, training, and disposal of the configuration item.

Post - CDR Assessment PM required to invite DASD(SE) engineers to their system-level CDRs and make available CDR artifacts. (Revised 24 Feb 2011 by AT&L memo*) Office of the Deputy Assistant Secretary of Defense (Systems Engineering) (DASD(SE)) prepares a brief assessment of the program’s design maturity and technical risks that may require MDA’s attention Draft CDR assessment will be coordinated with the PM prior to forwarding to MDA PM documents CDR in accordance with component best practices MDA : Reviews Post-CDR assessment Determines whether additional action is necessary *SUBJECT: Expected Business Practice: Post-Critical Design Review Reports and Assessments

Test & Evaluation Activities After Milestone B T&E during EMD demonstrates system performance is consistent with KPPs DT (contactor and government) Operational Assessments Live Fire T&E of components Interoperability testing T&E during LRIP demonstrates that system is operationally effective, suitable, and mission capable IOT&E Full-Up System Level LFT&E Interoperability testing and certification

Technology Maturity Technology Readiness Levels (TRL) Actual system “flight proven” through successful mission operations Actual system completed and “flight qualified” through test and demonstration (Full-Rate Production Decision) System prototype demonstration in a operational environment (Milestone C) System/subsystem model or prototype demonstration in a “relevant environment” (2366b certification item - Milestone B) Component and/or breadboard validation in relevant environment Component and/or breadboard validation in laboratory environment (Milestone A – TRA Deskbook Table I-3) Analytical and experimental critical function and/or characteristic proof-of-concept Technology concept and/or application formulated Basic principles observed and reported System Test, Launch & Operations System/Subsystem Development Technology Demonstration Technology Development Research to Prove Feasibility Basic Technology Research TRL 9 TRL 8 TRL 7 TRL 6 TRL 5 TRL 4 TRL 3 TRL 2 TRL 1 Public law requires MDAPs be at TRL 6 for Milestone B (chart 10 -11)

Milestone C Commits the Department to Production Requires approved CPD MDA approves: ADM Updated Acquisition Strategy and APB Entry into LRIP Exit criteria for LRIP

Low-Rate Initial Production (LRIP) Completes manufacturing development Provides minimum articles necessary for IOT&E Establishes initial production base Permits orderly ramp-up to full-rate production RM concerns: Sufficient number of systems for IOT&E; potential use of LRIP systems for IOC

Full Rate Production Decision Review (FRPDR) Approves entry into Full Rate Production MDA Approves: Full-rate production Updated Acquisition Strategy Updated APB Exit criteria, if appropriate Provisions for evaluation for post-deployment performance ADM

Linkage: CPD, APB, TEMP & Contract for LRIP/Production Milestone B Milestone C Post-CDR Assessment Cost Estimate & $$ TEMP COIs, MOEs, MOPs, CTPs Production Representative Articles Production Systems Contract KPPs KSAs CPD SPECs “build-to” SPECs “build-to” CDR APB KPPs KSAs DT OT LRIP/ Production IOT&E MOEs/ MOPs Specs MOEs/ MOPs Engineering & Manufacturing Development Phase Production & Deployment Phase 11

Oversight & Review DAE CAE PEO IPT’s assist in oversight & review DAB USD(AT&L) Defense Acquisition Executive Acquisition Category DAE Makes Decisions Signs ADM ACAT ID DAB-Defense Acquisition Board ITAB-Information Technology Acquisition Board DBSMC-Defense Business Systems Management Committee $365M RDT&E or $2.19B Procurement (FY2000 Constant $) DAB ITAB ACAT IAM $378M Life Cycle Cost or $126M Total Prog. Cost or $32M Prog. Cost in any single year (FY2000 Constant $) OIPTs Overarching IPT’s (OIPT’s) Issue resolution Component Acquisition Executive (Asst Secretary) ACAT IC/IAC Configuration Steering Boards Makes ACAT IC, IAC & II Decisions Signs ADM CAE NDAA 2009 sec 814 p 174 ACAT II Working-Level IPT’s (WIPT’s) $140M RDT&E or $660M Procurement (FY2000 Constant $) Component HQ Review Issue resolution Program Level IPT’s Program Executive Officer (General Officer/SES Civilian) ACAT III PEO Makes ACAT III Decisions Signs ADM No Fiscal Criteria IPT’s assist in oversight & review Program Manager (Col/LtCol/Civilian Equivalent) ACAT IV PM Navy USMC Note: Some PMs report directly to CAE.

Defense Acquisition Guidebook , 4.2.4.1 Figure 1