Wide-Field Imager for Solar PRobe Plus (WISPR)

Slides:



Advertisements
Similar presentations
EIS/Solar-B: EIS information that was sent to System Side EIS subsystems: EIS consists of three EIS subsystems. (a) STR: Structure, (b) HAR: Harness, (c)
Advertisements

Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
C T A Camera Mechanics Rich Northrop University of Chicago 1 Design Review Argonne May 9, 2014 Final.
SECCI/COR2 Status Report SECCHI CONSORTIUM MEETING D. Socker, S. Plunkett, A. Vourlidas.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
COR1 Science Overview Joseph M Davila Goddard Space Flight Center.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
GLAST Calorimeter LAT F2F Meeting 17 Mar 2005 Naval Research Lab Washington DC W Neil Johnson 1 Subsystem Mgrs F2F Meeting Calorimeter Subsystem 17 Mar.
PLATO kick-off meeting 09-Nov-2010 PLATO Payload overall architecture.
Constellation Orion Visible Light Constellation Orion Infrared Light.
SDW2005, juin, Taormina The Corot Space instrument.
Thermal Modeling and Model Correlation of the LORRI Telescope
A Finmeccanica Company 04/2000/1 EUSO Development Philosophy EUSO General Meeting Max Planck Institute for Physics Munich, November the 20th 2003.
1 Mirror subsystem: telescope structure Functions: Functions: Support mirrors subsystem to S/C Support mirrors subsystem to S/C Accommodate cryostat Accommodate.
STEREO IMPACT SEP Critical Design Review 2002-Nov-20 TvR IMPACT/SEP Thermal Design John Hawk, GSFC (301)
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
SECCHI Consortium Meeting, July 2001 SECCHI Ground Data Systems and Data Processing Nathan Rich NRL/Interferometrics
SNAP Integration Model V. S14 The SNAP Integration Model Mechanical [ SC4 Breakout ] Robin Lafever LBNL Engineering.
Science - Coronal heating - Coronal structure / dynamics - Elementary processes in Magnetic Reconnection Mission instruments - Optical Telescope / Vector.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
ASTEROSEISMOLOGY and SEARCH for EXOPLANETS Vienna - September 18 th 2001 Optical performance characterization Point Spread Function (PSF) : Telescope +
Presented by A.B. Galvin STEREO SWG NOAA Boulder, Co 22 March 2004 PLASTIC Activities.
Opto-Mechanics for SNAP at UM
Henry Heetderks Space Sciences Laboratory, UCB
Solar Probe Plus A NASA Mission to Touch the Sun Solar Probe Plus Project Wide Monthly Oct 2012 Solar Probe Plus A NASA Mission to Touch the Sun Andy Driesman.
041103_SECCHI Status.1 SECCHI Status R.A. Howard STEREO SWG 2-5 May 2005 Hamburg Planetarium.
GIST 24 Meeting GERB Hardware Status 14 th December 2005 Eric Sawyer.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
Lower Baffle Robert Besuner 26 August Background/Purpose This study follows on to 12 August study of the Spacecraft Interface/Handling Ring. —In.
Mechanical design meeting, IAG, Calibration Unit mechanical design Svend M. Bauer Andreas Kelz, Emil Popow, Martin M. Roth.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
Extended Detector Cutoff Considerations WFIRST Project Office May
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
NASA Ames Instrumentation Workshop May 13, 2010 Technology / Application Images go here Title of Presentation goes here Description goes here Format. Please.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
WFIRST Large-cell structure concept design Preview Work in progress 3/4/2016Robin Lafever1.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
STEREO SWG COR1 CURRENT STATUS AND FUTURE PLANS Joseph Davila 1, O. C. St. Cyr 1 William Thompson 2 1 NASA Goddard Space Flight Center, 2 Adnet Systems,
NIRSpec - the JWST Multi-Object Spectrograph P. Ferruit (ESA), S. Arribas (CSIS), S. Birkmann (ESA), T. Böker (ESA), A. Bunker (Oxford), S. Charlot (IAP),
Camera Motion System Requirement Design Details FEA.
Status of the SWAP instrument
EIDP Status. Solar Probe Plus FIELDS Main Electronics Package iPSR Management Apr 10, 2017.
Dave McComas on behalf of the ISʘIS Team
Spacecraft Interface and I&T
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2007.
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
Scott Wakely University of Vengeance
Solar Probe Plus FIELDS V5 Mechanical Pre-Ship Review April 10, 2017
Vertex Detector Mechanical R&D Design Questions and Issues
COR1 Current Status and Future Plans
0.0 Instrument Suite Name Presenter’s name
SXC integration and test
ISAS Solar Physics Yohkoh (1991- ) Hionotori ( )
GLAST Large Area Telescope
Integration, Test, and Verification
Henry Heetderks Space Sciences Laboratory, UCB
SLAC DOE Program Review
Launch and On-orbit Checkout
FourStar 4K x 4K JHK imager
Integration and Test Organization Chart
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2008.
GLAST Large Area Telescope
Another Modular Focal Plane: Part 2 – FP assembly
Optics Alan Title, HMI-LMSAL Lead,
AGENDA 1 - THE INSTRUMENT Architecture of the instrument
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

Wide-Field Imager for Solar PRobe Plus (WISPR) WISPR Status SWT-14 Smithsonian, Washington, D.C. R.A. Howard 15 Sep 2016

WISPR Instrument Module Description Outer Focal Plane Assembly (FPA) Lens Barrel Assembly Inner Focal Plane Assembly (FPA) Interior Baffle Assembly Forward Baffle Assembly Camera Interface Electronics (CIE) Radiators Baffle Cover Door Lid (Deployed) Structure Door Latch Release Mechanism Bipod Legs

Integration Status Mechanical: Mounting legs in welding Forward Baffle Assembly complete Interior Baffle box complete FPA assemblies in work Telescope Optics and Detectors Complete and characterized Initial inner & outer telescope assemblies complete Optical testing underway to verify requirements prior to final assembly Thermal blankets have been fabricated and are complete except for installation of ground wires. Fabrication of the FM main harness complete, needs wrapping and final checkout. Functional testing of the FM camera electronics with the EM IDPU complete FM IDPU delivered to NRL

Upcoming Tasks Continue assembly of FM WISPR Instrument Module (WIM) and Focal Plane Assembly (FPA). Perform in-air and vacuum optical testing on the completed FPA assemblies. Complete assembly of the FM harness. FM environmental testing.

Three versions of the “legs” to account for the positions of the TPS

Inner Focal Plane Assembly

Outer Focal Plane Assembly

Fields of View

Finding the Background The rapid change in distance to the sun results in a corresponding rapid change in the field of view of WISPR. This means that the technique we have used to create a background for LASCO and STEREO will not work here. We (Guillermo Stenborg) have been working on a technique to develop a background for a single image. Using images from STEREO/HI-1 has shown that the technique is working extremely well. STEREO performs a calibration roll periodically, during which the SECCHI instruments take a single image at each roll position. 8 images are taken during the 360 degree roll which lasts about 2 hours. By using this technique, we were able to compute the backgrounds for each image in the roll separately.

Sequence of images from a single day Standalone Movie