Yoshiro TANAKA Japan Meteorological Agency

Slides:



Advertisements
Similar presentations
RA-VI MG-7 RA VI Management Group Meeting 7 WORKING GROUP ON TECHNOLOGY DEVELOPMENT AND IMPLEMENTATION Progress review Jochen Dibbern, Chair WG-TDI Geneva,
Advertisements

Progress on the WIGOS R-WIP in RA II JIAO Meiyan Representative of RA II China Meteorological Administration.
19/5/2011 Cg-XVI, Doc. 3.1(4) World Meteorological Organization Working together in weather, climate and water WWW Programme Instruments and Methods of.
Ongoing regional WIGOS projects in RA II and RA V and contribution of JMA Yoshiro Tanaka Observation Department Japan Meteorological Agency Preparatory.
World Meteorological Organization Working together in weather, climate and water WIGOS R-WIP-RA III José Arimatéa de Sousa Brito, RA-III Focal Point WMO.
World Meteorological Organization Working together in weather, climate and water WIGOS IMPLEMENTATION IN RA III José Arimatéa de Sousa Brito, Focal Point.
REGIONAL INSTRUMENT CENTRE: REVIEW AND STRENGTHENING Dr Jérôme DUVERNOY
Status of RA II Pilot Project to Develop Support for NMHSs in Satellite Data, Products and Training Keiko YAMAMOTO (JMA) On behalf of Co-coordinators of.
PROGRESS REPORT ON THE RA II PILOT PROJECT TO DEVELOP SUPPORT FOR NMHSS IN SATELLITE DATA, PRODUCTS AND TRAINING THIRD PHASE (SEP 2011 – AUG 2012) AND.
WIGOS Implementation Status in RA II and National Activities Chong PEI, Division Chief, Department of Integrated Observations of CMA.
Progress on the WIGOS Implementation in RA II ZHAO DATONG Deputy Director, Department of Integrated Observation China Meteorological Administration.
WIGOS Implementation Status in RA II Chong PEI, Division Chief, Department of Integrated Observations of CMA On behalf of Maiyan JIAO RA II Representative.
Robert Grumbine National Weather Service RA-IV WIGOS Implementation Workshop (English), December, Willemstad Curaçao United.
REVIEW OF WIGOS ACTIVITIES Outcomes from the Joint RA II/RA V WIGOS Workshop on DRR ICG-WIGOS-5 WMO; OBS/WIGOS.
Metrology within Meteorology. METROLOGY PYRAMID METROLOGY LABORATORIES MANUFACTURERS / PUBLIC NATIONAL LABORATORY BIPM.
WIS -WIGOS 21 deliverables and 39 activities are planned for for WIS and WIGOS.
Progress Report on the RA II WIGOS Project to Develop Support for NMHSs in Satellite Data, Products and Training Co-coordinator, JMA and KMA Presented.
WMO RAII Expert Group on WIGOS (Abu Dhabi, UAE, Oct-Nov 2016)
Secretariat 12 to 16 February 2017 Abu Dhabi, UAE
WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS)
WIGOS regulatory and guidance material
WIGOS IMPLEMENTATION LEAD BY WORKING GROUP ON INFRASTRUCTURE
Review of Regional WIGOS Implementation Plan (R-WIP) in RAII
The Plan, Status and First Results
Report of the President of RAII Abdulla Mohammed Al Mannai
Survey Report on the Basic Capability of NMHSs in RA II
Report by the President
Progress Report for WG-WIGOS/WIS
Concept Proposal for RA-III Regional WIGOS Centre
Zhou Qing Liang(Shi Lijuan) CMA 31 Oct
Report on WG-WIGOS/WIS
Joint RA II/V Workshop on WIGOS for DRR - The Jakarta Declaration -
The Jakarta Declaration
CHEN Yongqing Co-coordinator,EG-WIGOS
Hello Bonjour General Introduction and objective of the meeting
Review of RA-I 16th Session Resolutions related to
WIGOS Data Quality Monitoring System (WDQMS)
The Plan, Status and First Results
RA II Regional priorities
Secretariat 12 to 16 February 2017 Abu Dhabi, UAE
WMO Integrated Global Observing System (WIGOS) 16-RA VI Side Event Helsinki, Finland, 11 September 2013 Dr Miroslav Ondráš, Dr Wenjian Zhang (WMO) Dr.
Regional WIGOS Centres
WIGOS Pre-operational Phase
WIGOS Pre-operational Phase
WIGOS implementation in RA II
Secretariat 12 to 16 February 2017 Abu Dhabi, UAE
Overview of the WMO Integrated Global Observing System (WIGOS)
WIGOS Implementation Status in RA II and National Activities Chong PEI, Division Chief, Department of Integrated Observations of CMA.
Co-chair Introduction
WDQMS NWP Pilot Project
Flood Forecasting Initiative
Technical Coordinator - Data Buoy Cooperation Panel
The WMO-IOC Regional Marine Instrument Centres
WIGOS Data Quality Monitoring System (WDQMS)
(Name of the country) Presentation
Thai Meteorological Department (TMD)
Status and Plan of Regional WIGOS Center (West Asia) in
WIGOS Pre-Operational Phase;
CHEN Yongqing Coordinator, EG-WIGOS
Regional WIGOS Centre Tokyo
WIGOS regulatory and guidance material
Regional WIGOS Centre Plans of India
The WIGOS Pre-Operational Phase
Status of Establishing Regional WIGOS Centers (RWCs) in Pilot Mode
(6-8 November 2018, Beijing, China)
The status and Plan in 2019 for the WIGOS centers in RA II
COLLABORATION AND ENGAGEMENT WITH CROSS-CUTTING WMO PRIORITIES; WIGOS MAIN OBSERVING COMPONENTS GLOBAL CRYOSPHERE WATCH 25 Jan 2019 Árni Snorrason Chair,
Inter-Commission Coordination Group On WIGOS
Commission on Instruments and Methods of Observation
4. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP)   4.4 Development and implementation of the WIGOS.
Presentation transcript:

Yoshiro TANAKA Japan Meteorological Agency RA II regional WIGOS project and JMA contributions - for RWC and WDQMS - Yoshiro TANAKA Japan Meteorological Agency EC-69 Side Event on the WIGOS Data Quality Monitoring System (Geneva, May 2017)

JMA’s website for observation data monitoring as a Lead Center on the land surface observation quality monitoring SYNOP station (6-month reporting) http://qc.kishou.go.jp/

Pilot project for Quality Monitoring Developed by WIGOS project office, input by ECMWF, JMA, DWD, and NCEP for surface pressure; ECMWF and JMA for upper air observation;

RA II Regional WIGOS Projects (2017-2020) Approved by RA II-16 (Abu Dhabi, Feb 2017) No. I Monitor and Review the Implementation of EGOS- IP in RA II No. II The web-interface for sharing status of standardization and experience and monitoring synoptic observations in RA II No. III Capacity Building in Radar Techniques in the Southeast Asia No. IV Enhance the Availability and Quality Management Support for NMHSs in Surface, Climate and Upper-air Observations No. V Developing a Sand and Dust Storm Warning Advisory and Assessment System (SDS-WAS) in Asia Node No. VI Develop Support for NMHSs in Satellite Data, Products and Training

Overview of Project No.IV Assurance and Management of Data Quality 1. Improvements of data quality at RBCN/RBSN (expected to be RBON) stations The coordinator plans to implement the following action items for improvements of data quality at RBCN/RBSN (RBON) during the project: (a) Quality monitoring of surface and upper-air observations in RA II under the framework of WDQMS (WIGOS Data Quality Monitoring System), and incident management. (b) Study and share the best practices on QA/QC procedures at surface observation through following process: • Conduct a survey on best practice on QA/QC procedures on surface observation by RA II Members and report the results. • Develop a website on QA/QC of observation data in RA II. (c) Possibility of technical support and information sharing within sub-regional area. Based on requests from the coordinator, the following Members will consider the possibility of technical support if funds are available, and share the summary of the technical missions with RA II Members: - CMA, HKO, JMA, and KMA for Southeast Asia, - IMD for South Asia, - Roshydromet for Central Asia, - Kuwait for Middle East. 2. Enhancement of RICs Services RICs plan to implement the following action items for further enhancement of their services in capacity-building and calibration during the project: (a) Organization of a training workshop on in-situ check and calibration of instruments at observation stations, as well as instrument maintenance management and field environment. (b) Seek, and promotion of, package-type cooperation (including calibration of standards, lectures and practices, and technical support) if funds are available. (c) Maintaining and expansion of elements for the International Standard ISO/IEC 17025 - General requirements for the competence of testing and calibration laboratories. (d) Promotion of intercomparison between RICs (including other RAs). (e) Update of training materials on calibration and maintenance of instruments and sharing through RIC's website. (f) Development of database of RIC's calibration results and sharing through RIC's website. 3. Investigation on migration error in code forms of observation data. The coordinator, with collaboration with EG-WIS, conducts a survey on a status on data migration from observation signals into Table Driven Code Forms (TDCF) in RA II and share the results with Members. Calibration of Instruments

RA II Survey on Quality Management for Surface Meteorological Observations The survey on Quality Management of Surface Meteorological Observations in RA II conducted in 2016 (currently being analyzed) Basis on the survey result, JMA/WMO Training Workshop on Quality Management of Surface Meteorological Observations (planned in early 2018). The survey results to be shared through WMO/IOM report.

WMO/JMA Survey of Calibration of Meteorological Instruments in RA II The Survey (by Nakashima, K. 2015) showed serious lack of international traceability of meteorological instruments. Maintenance of standards and traceability to an international standard (pressure) N=21 Maintenance of standards and traceability to an international standard (temperature) N=21 (Nakashima, K. 2015): Survey on Meteorological Instruments, Calibration and Training, Regional Association II (Asia), WMO IOM Report No. 122. http://www.wmo.int/pages/prog/www/IMOP/publications-IOM-series.html

Traceability chain Country A (with RIC) Country B Traceability linkage is a key to achieve internationally reliable observation! SI Country A (with RIC) Country B National Standard RIC Standard NMHS Standard NMHS Standard Travelling Standard Travelling Standard Operational Instrument Operational Instrument

Improvement of technical capacity of NMHS RIC Tsukuba Package JMA JICA Survey Preliminary survey of calibration capacity Provision Provision of standard instruments and/or inspection equipment Training Training sessions Follow-up Follow up activities Calibration Techniques Bilateral Assistance To ensure traceability of meteorological instruments To improve quality of surface observation Improvement of technical capacity of NMHS

RIC Tsukuba Package for Bangladesh in 2013 Survey Provision Follow-up Training (in Japan and Bangladesh)

Achievements of RIC Tsukuba Package Month/year Country Standard instruments calibrated Training Oct 2013 Bangladesh Barometer, thermometer, hygrometer Jun 2015 Fiji Barometer, thermometer, Dec 2015 Philippines Barometer Feb 2016 Mozambique Barometer, thermometer Sri Lanka Jul 2016 Rain gauge, hygrometer Note: Red characters show the ISO17025 (General requirements for the competence of testing and calibration laboratories) calibration

WMO/RIC Tsukuba website Renewed in March 2017 RIC activities Regional WIGOS project Training Materials http://www.jma.go.jp/jma/jma-eng/jma-center/ric/RIC_HP.html